i
Mb Power (m.p)
Filter interviews by
VGF can experience problems such as delays, cancellations, technical issues, and overcrowding.
Delays in train schedules
Cancellations of services
Technical issues with trains or stations
Overcrowding on trains
Maintenance problems affecting services
Alignment is done by ensuring that all team members are working towards the same goals and objectives.
Clearly communicate goals and objectives to all team members
Regularly check in with team members to ensure they are on track
Provide feedback and guidance to keep team members aligned
Encourage collaboration and open communication among team members
I appeared for an interview in Oct 2024, where I was asked the following questions.
I applied via Referral and was interviewed in Jun 2024. There were 2 interview rounds.
Top trending discussions
posted on 13 Mar 2024
I applied via Referral and was interviewed in Sep 2023. There were 2 interview rounds.
Requirements are gathered through stakeholder interviews, surveys, market research, and analyzing existing data.
Conduct stakeholder interviews to understand needs and preferences
Distribute surveys to gather feedback from users
Perform market research to identify trends and competitors
Analyze existing data such as user feedback and usage metrics
Use tools like Jira or Trello to track and prioritize requirements
I have used various tools such as Jira, Trello, and Microsoft Project for project management.
Jira
Trello
Microsoft Project
Logical, Reasoning and Mathematical
I applied via Indeed and was interviewed in Apr 2023. There were 4 interview rounds.
8 bit vs 16 bit MCUs have different power management capabilities.
8 bit MCUs are generally more power efficient than 16 bit MCUs.
16 bit MCUs have more processing power and can handle more complex tasks.
Power management techniques like sleep modes and clock gating can be used to conserve power in both types of MCUs.
Choosing the right MCU depends on the specific requirements of the project.
For example, an 8 bit MCU might...
MCU selection depends on factors like performance, power consumption, peripherals, cost, and development tools.
Consider the required performance and processing power for the application
Evaluate power consumption requirements and available power sources
Check for required peripherals and interfaces
Consider the cost of the MCU and development tools
Evaluate the availability and quality of development tools and support
Examp
Bare metal code for 4 button input with 1 variable without delay and could differentiate between actual and spurious touch.
I applied via Internshala and was interviewed in Apr 2024. There were 2 interview rounds.
Build the backend and frontend of a weather-monitoring app with CURD operations, weather history charts and location on map
The code is a function that takes in an array of numbers, filters out even numbers, squares each remaining number, and returns the sum of the squared numbers.
The code uses the filter method to remove even numbers from the array.
It then uses the map method to square each remaining number.
Finally, it uses the reduce method to sum up the squared numbers.
Potential improvements can include optimizing code, enhancing user experience, implementing new features, and fixing bugs.
Optimize code for better performance
Enhance user experience through UI/UX improvements
Implement new features to add value for users
Fix bugs and address any technical issues
Regularly update and maintain the website or application
posted on 27 Apr 2022
posted on 7 Apr 2023
I applied via Referral and was interviewed before Apr 2022. There were 2 interview rounds.
based on 5 interviews
Interview experience
based on 56 reviews
Rating in categories
Assistant Manager
16
salaries
| ₹4.8 L/yr - ₹12 L/yr |
Manager
14
salaries
| ₹10.3 L/yr - ₹20 L/yr |
Senior Engineer
13
salaries
| ₹4 L/yr - ₹8.5 L/yr |
Senior Manager
13
salaries
| ₹12.6 L/yr - ₹26.8 L/yr |
Deputy Manager
11
salaries
| ₹7.4 L/yr - ₹12.9 L/yr |
Jyoti Structures
Aqua Tech Systems
Solarig Gensol Utilities
Swastik Enterprises