Filter interviews by
I applied via Naukri.com and was interviewed in Jun 2022. There were 4 interview rounds.
Shared a AutoCAD RCC DWG of floor plan for BBS qty and costing calculation of roof..
Yes, having knowledge in Mivan is important for completing slabs. Mivan is a formwork system used for constructing slabs.
Mivan is a type of formwork system used in construction.
It is known for its efficiency and speed in constructing slabs.
Mivan formwork consists of strong and durable aluminum panels that are easy to assemble and dismantle.
The material used to complete slabs with Mivan formwork includes concrete, reinf...
The leakage source in Mivan structure is typically from joints between the formwork panels.
Leakage can occur at joints between the formwork panels due to improper sealing or gaps.
Water can seep through the joints and cause leakage inside the structure.
Proper sealing of joints and regular maintenance can help prevent leakage issues.
Understanding labour costing based on the work being done is essential for effective management.
Labour costing involves calculating the cost of labor required to complete a specific task or project.
Factors to consider include wages, benefits, overtime, and productivity levels.
Accurate labour costing helps in budgeting, resource allocation, and pricing strategies.
For example, a construction company needs to accurately e...
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.
I applied via Referral and was interviewed in Aug 2024. There was 1 interview round.
I appeared for an interview before Feb 2024.
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
posted on 29 Aug 2023
I applied via Naukri.com and was interviewed in Mar 2023. There were 2 interview rounds.
RCC Mivon shuttering experience involves using reinforced concrete construction techniques for formwork and scaffolding.
Experience in setting up formwork and scaffolding for reinforced concrete structures
Knowledge of RCC Mivon shuttering techniques and materials
Ability to interpret construction drawings and plans for RCC Mivon shuttering
Experience in coordinating with construction teams and contractors for RCC Mivon sh
posted on 6 Aug 2023
I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.
posted on 20 Jun 2024
Seeking new challenges and growth opportunities
Desire for career advancement
Looking for a more challenging role
Seeking new learning opportunities
Company restructuring led to changes in job responsibilities
I appeared for an interview before Mar 2024, where I was asked the following questions.
based on 2 interviews
Interview experience
based on 4 reviews
Rating in categories
Senior Executive
30
salaries
| ₹3.6 L/yr - ₹6.5 L/yr |
Assistant Manager
16
salaries
| ₹5.1 L/yr - ₹10.6 L/yr |
Store Executive
13
salaries
| ₹3.2 L/yr - ₹5 L/yr |
Senior Accounts Executive
11
salaries
| ₹4.2 L/yr - ₹5.3 L/yr |
Executive Accountant
9
salaries
| ₹3 L/yr - ₹4.3 L/yr |
Omaxe
Runwal Group
Mahindra Lifespace Developers
Realty Assistant