I applied via Naukri.com and was interviewed in Jun 2022. There were 4 interview rounds.
Shared a AutoCAD RCC DWG of floor plan for BBS qty and costing calculation of roof..
Yes, having knowledge in Mivan is important for completing slabs. Mivan is a formwork system used for constructing slabs.
Mivan is a type of formwork system used in construction.
It is known for its efficiency and speed in constructing slabs.
Mivan formwork consists of strong and durable aluminum panels that are easy to assemble and dismantle.
The material used to complete slabs with Mivan formwork includes concrete, reinf...
The leakage source in Mivan structure is typically from joints between the formwork panels.
Leakage can occur at joints between the formwork panels due to improper sealing or gaps.
Water can seep through the joints and cause leakage inside the structure.
Proper sealing of joints and regular maintenance can help prevent leakage issues.
Understanding labour costing based on the work being done is essential for effective management.
Labour costing involves calculating the cost of labor required to complete a specific task or project.
Factors to consider include wages, benefits, overtime, and productivity levels.
Accurate labour costing helps in budgeting, resource allocation, and pricing strategies.
For example, a construction company needs to accurately e...
Top trending discussions
Seeking new challenges and growth opportunities
Desire for career advancement
Looking for a more challenging role
Seeking new learning opportunities
Company restructuring led to changes in job responsibilities
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.
I applied via Referral and was interviewed in Aug 2024. There was 1 interview round.
posted on 20 Jun 2024
posted on 29 Aug 2023
I applied via Naukri.com and was interviewed in Mar 2023. There were 2 interview rounds.
RCC Mivon shuttering experience involves using reinforced concrete construction techniques for formwork and scaffolding.
Experience in setting up formwork and scaffolding for reinforced concrete structures
Knowledge of RCC Mivon shuttering techniques and materials
Ability to interpret construction drawings and plans for RCC Mivon shuttering
Experience in coordinating with construction teams and contractors for RCC Mivon sh
posted on 6 Aug 2023
I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.
Two-stroke engines have a power stroke every revolution, while four-stroke engines have a power stroke every other revolution.
Two-stroke engines have a simpler design and are lighter than four-stroke engines.
Two-stroke engines have a higher power-to-weight ratio than four-stroke engines.
Four-stroke engines are more fuel-efficient and have a longer lifespan than two-stroke engines.
Two-stroke engines are commonly used in...
Batching plant pain mixture servicing refers to the maintenance and repair of the equipment used to mix concrete.
Regular cleaning and inspection of the batching plant equipment
Replacing worn out parts and repairing any damages
Ensuring proper calibration of the equipment for accurate mixing
Regular lubrication of moving parts to prevent wear and tear
Training staff on proper use and maintenance of the equipment
Bp1800 concrete pump has a hydraulic function for efficient pumping of concrete.
The hydraulic system of Bp1800 concrete pump helps in generating the required pressure to pump concrete.
It consists of hydraulic cylinders, pumps, and motors that work together to move the concrete through the pipeline.
The hydraulic function also helps in controlling the speed and direction of the pump.
The hydraulic oil used in the system h...
A tower crane support mechanic is responsible for maintaining and repairing the tower crane's support system.
Inspecting and maintaining the tower crane's support system
Repairing or replacing damaged or worn-out parts
Ensuring the tower crane is stable and secure
Working with other members of the construction team to ensure safety and efficiency
Using specialized tools and equipment to perform maintenance and repairs
Keepin
based on 2 interviews
Interview experience
based on 4 reviews
Rating in categories
Senior Executive
27
salaries
| ₹2.8 L/yr - ₹6.5 L/yr |
Assistant Manager
16
salaries
| ₹5.1 L/yr - ₹10.6 L/yr |
Store Executive
13
salaries
| ₹3.2 L/yr - ₹5 L/yr |
Senior Accounts Executive
11
salaries
| ₹4.2 L/yr - ₹5.3 L/yr |
Deputy Manager
9
salaries
| ₹6.2 L/yr - ₹9.5 L/yr |
Adani Group
Reliance Industries
Tata Group
Mahindra & Mahindra