Upload Button Icon Add office photos

MAN Energy Solutions

Compare button icon Compare button icon Compare

Filter interviews by

MAN Energy Solutions Senior Project Manager Interview Questions and Answers

Updated 22 Aug 2024

MAN Energy Solutions Senior Project Manager Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2023. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Core marine engine system application
  • Ans. 

    The core marine engine system application is the central component responsible for powering and controlling the propulsion system of a marine vessel.

    • The core marine engine system application is essential for managing the fuel intake, combustion process, and power output of the marine engine.

    • It includes components such as the engine control module, fuel injection system, cooling system, and exhaust system.

    • Examples of co...

  • Answered by AI
Round 2 - One-on-one 

(1 Question)

  • Q1. Marine Business understanding and project management profile
Round 3 - HR 

(1 Question)

  • Q1. Experience and qualification based

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I applied via Referral

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About working culture family background
Round 3 - Technical 

(2 Questions)

  • Q1. ElectricityDistribution equipment. Capacity tech details etc
  • Q2. 1.Transformer maintenance 2.Cable layong 3.commisioning processes
Round 4 - Group Discussion 

On field experience ...situational questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Join group immediately if selected up to age 40. In selected dept like Metering relays Business excellence, Procurement.engineering
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. It was mostly about how we habdle the situations.nothing technical
Round 3 - One-on-one 

(1 Question)

  • Q1. Which didnt happen when i asked to reschedule before 6 hrs

Interview Preparation Tips

Interview preparation tips for other job seekers - They are worst in handling people.first time when the interview was fixed.No one came to the call and the same happened second time too.
Finally had a discussion and the said I am through to next round.
They scheduled the call, I asked them to reschedule 6 hours before that call.
But that reschedule never happened.
I feel this place is completely no value for humans.

Interview Questionnaire 

5 Questions

  • Q1. ASPICE process
  • Q2. SWPM role and responsibilities
  • Q3. Project workflow
  • Q4. Stakeholder management
  • Q5. Estimation techniques
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. DDUGJY Project;- 33/11 KV New PSS ,33 KV Line ,11 KV Line and LT Line
  • Ans. Rerea of New PSS 60*40 mtr control room 1700 sqft road 60 mtr width 3.75 mtr footpath 15 mtr , fencing 40 mtr cable trench 130 mtr , 2 no 5 MVA PTR, 800Amp VCB and 800 Amp rating isolator in switch yards area. cost of civil work by sub cotractor 1.15 cr and electrical work 9.85 lac.
  • Answered Anonymously
  • Q2. RGGVY 12th Plan , HVDS Project, and Segrigation
  • Q3. ADB Project 33/11 KV New PSS R&M 33&11 KV line LT Line
Round 3 - HR 

(1 Question)

  • Q1. Final negotiation of salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Please consider as per work profile in electrical feild
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected

I applied via Recruitment Consulltant

Round 1 - Assignment 

Project Management , Production Management and HSE

Round 2 - HR 

(1 Question)

  • Q1. Very understanding and initiate. Motivated HR Department
Round 3 - Case Study 

Deeply interested in RR PACKAGE

Round 4 - Group Discussion 

Well. We used to do everyday

Interview Preparation Tips

Interview preparation tips for other job seekers - Thakur Sir, ♥️ has recommended for this job. I did my best to GREPL. If he allows will do more in this regard.

I applied via Naukri.com and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. What are your salary expectations?
  • Q2. Share details of your previous job.
  • Q3. Why are you looking for a change?
  • Q4. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - JUST BE CONFIDENT THEY ARE LOOKING FOR CANDIDATE WHO HAVE GOOD DECISION MAKING POWER.

I was interviewed before Feb 2021.

Round 1 - HR 

(1 Question)

  • Q1. Where do you see yourself in 5 years?

Interview Preparation Tips

Interview preparation tips for other job seekers - Align your objectives with Company's long term vision or at least try to achieve departmental head position.

I applied via Campus Placement and was interviewed before Jun 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

It was easy if you have practice

Round 3 - Technical 

(3 Questions)

  • Q1. It was difficult. Questions were highly technical . Revise basic concepts for thermodynamics , heat transfer.
  • Q2. Critical point of water
  • Ans. 

    Critical point of water is the temperature and pressure at which liquid and gas phases of water become indistinguishable.

    • Critical point of water is at 647 K temperature and 22.064 MPa pressure.

    • At critical point, water can exist as both liquid and gas phases simultaneously.

    • Above critical point, water cannot exist in liquid state regardless of pressure.

    • Critical point is important in chemical and industrial processes such...

  • Answered by AI
  • Q3. Purification process of water
  • Ans. 

    Purification process of water involves removing impurities and contaminants to make it safe for consumption.

    • Physical processes like sedimentation, filtration, and distillation are used to remove impurities.

    • Chemical processes like chlorination and ozonation are used to kill bacteria and viruses.

    • Advanced technologies like reverse osmosis and ultraviolet radiation are also used for purification.

    • The quality of water after ...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Thermax Limited Project Manager interview:
  • Heat Transfer
  • Thermodynamics
  • Boiler Operations
Interview preparation tips for other job seekers - Get your basic concepts clear and perform your best.

I applied via Campus Placement and was interviewed before Jun 2020. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. Are you interested for any where of country.
  • Q2. Hou you complete the project within time
  • Ans. 

    To complete a project within time, effective planning, resource allocation, and monitoring are essential.

    • Create a detailed project plan with clear milestones and deadlines

    • Allocate resources efficiently and ensure they have the necessary skills

    • Regularly monitor progress and identify any potential delays

    • Implement strategies to mitigate risks and address any issues promptly

    • Maintain open communication with the team and sta...

  • Answered by AI
  • Q3. What is your basic subject
  • Ans. 

    The basic subject of a Project Manager is managing projects and ensuring their successful completion.

    • The basic subject of a Project Manager is project management.

    • Project Managers are responsible for planning, organizing, and overseeing projects from start to finish.

    • They ensure that projects are completed within budget, on schedule, and meet the desired objectives.

    • Project Managers coordinate and communicate with team me...

  • Answered by AI
  • Q4. Thermo dynamic & zair conditioning

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was related to my choise subject & also they want to test knowledge & communication skill over all interview completed within 45 days, Interview is in my college you can assume as campus.

MAN Energy Solutions Interview FAQs

How many rounds are there in MAN Energy Solutions Senior Project Manager interview?
MAN Energy Solutions interview process usually has 3 rounds. The most common rounds in the MAN Energy Solutions interview process are Technical, One-on-one Round and HR.
What are the top questions asked in MAN Energy Solutions Senior Project Manager interview?

Some of the top questions asked at the MAN Energy Solutions Senior Project Manager interview -

  1. Core marine engine system applicat...read more
  2. Marine Business understanding and project management prof...read more
  3. Experience and qualification ba...read more

Tell us how to improve this page.

MAN Energy Solutions Senior Project Manager Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Bosch Interview Questions
4.2
 • 331 Interviews
Thermax Limited Interview Questions
4.1
 • 251 Interviews
ABB Interview Questions
4.1
 • 235 Interviews
Cummins Interview Questions
4.3
 • 231 Interviews
Tata Power Interview Questions
3.9
 • 162 Interviews
BHEL Interview Questions
4.1
 • 113 Interviews
Siemens Energy Interview Questions
4.1
 • 73 Interviews
View all
Design Engineer
96 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

CAD Engg
80 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

System Engineer
55 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
35 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Design Engineer
33 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare MAN Energy Solutions with

Siemens Energy

4.1
Compare

BHEL

4.1
Compare

Thermax Limited

4.1
Compare

Kirloskar Brothers

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview