The number of wires that can be pulled through a 25mm conduit pipe depends on the size and type of the wires.
The number of wires that can be pulled through a conduit pipe depends on the size of the wires and the size of the conduit pipe.
Thinner wires will allow for more wires to be pulled through compared to thicker wires.
For example, if using standard 2.5mm² wires, you may be able to pull around 4-6 wires through a 25
Top trending discussions
posted on 13 Apr 2024
Uniformity factor is the ratio of the minimum illuminance to the average illuminance on a surface. Maintenance factor is the ratio of the illuminance after a period of time to the initial illuminance.
Uniformity factor is important in lighting design to ensure consistent lighting levels across a space.
A higher uniformity factor indicates more even lighting distribution.
Maintenance factor accounts for factors like dirt a...
posted on 21 Feb 2022
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
posted on 23 Jan 2025
I was interviewed in Dec 2024.
Maintenance procedures involve regular inspections, testing, and repairs to ensure equipment functionality and safety.
Regularly schedule maintenance tasks to prevent breakdowns and ensure equipment longevity
Conduct thorough inspections to identify potential issues before they escalate
Keep detailed records of maintenance activities and equipment history
Train staff on proper maintenance procedures and safety protocols
Uti...
To maintain a battery bank, regular inspections, proper charging, temperature control, and monitoring electrolyte levels are essential.
Perform regular inspections to check for signs of corrosion, leaks, or damage
Ensure proper charging by following manufacturer's guidelines and avoiding overcharging
Control temperature to prevent overheating or freezing, which can reduce battery life
Monitor electrolyte levels and top up ...
posted on 24 Jan 2024
I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.
Earthing is the process of connecting electrical equipment or installations to the earth to prevent electric shock and protect against electrical faults.
Earthing involves creating a connection between the electrical system and the earth.
It is done by burying a metal conductor, such as a copper rod, in the ground.
The metal conductor is connected to the electrical system using a wire or cable.
Earthing provides a path for...
The type of DGs used at our site are diesel generators.
Diesel generators are commonly used as backup power sources in various industries.
They are reliable and can provide a continuous power supply during electrical outages.
DGs are often used in remote locations or areas with unreliable grid power.
They require regular maintenance and fuel supply to operate efficiently.
Examples of DGs used at our site include Cummins, Ca
LT line refers to Low Tension line while HT line refers to High Tension line.
LT line carries low voltage and is used for domestic and small-scale commercial purposes.
HT line carries high voltage and is used for industrial and large-scale commercial purposes.
LT line voltage is typically up to 440 volts, while HT line voltage is above 440 volts.
LT lines are usually overhead lines, while HT lines can be both overhead and ...
We used different types of circuit breakers at the site depending on the specific requirements.
We used air circuit breakers (ACBs) for low voltage applications.
For medium voltage applications, we used vacuum circuit breakers (VCBs) or oil circuit breakers (OCBs).
In high voltage installations, we used sulfur hexafluoride (SF6) circuit breakers.
For specialized applications like generator protection, we used differential ...
The size of transformers used at the site varied depending on the specific requirements of the project.
Transformers used at the site were of different sizes based on the power demand of the electrical system.
For smaller projects, transformers with a capacity of around 100 kVA were used.
For medium-sized projects, transformers with a capacity ranging from 250 kVA to 500 kVA were used.
For larger projects, transformers wit...
We used a stationary type batching plant at the site.
We used a stationary type batching plant for our construction project.
The stationary batching plant had a higher production capacity compared to mobile plants.
It was equipped with multiple storage bins for different types of aggregates.
The plant had a conveyor belt system to transfer the aggregates to the mixer.
We used this type of batching plant because it provided
posted on 15 Feb 2024
I applied via Referral and was interviewed before Feb 2023. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Oct 2020. There was 1 interview round.
posted on 18 Dec 2023
I applied via Walk-in and was interviewed before Dec 2022. There were 3 interview rounds.
Electrical lightning protection design codes and standards are guidelines that ensure the safety and effectiveness of lightning protection systems.
National Fire Protection Association (NFPA) 780 is a widely recognized standard for lightning protection design.
International Electrotechnical Commission (IEC) 62305 is another commonly used standard for lightning protection.
These codes and standards provide guidelines for t...
Electrical earthing design is a crucial aspect of electrical engineering that ensures safety and proper functioning of electrical systems.
Electrical earthing design involves creating a low-resistance path for electrical current to flow into the ground.
It helps prevent electric shock, protects equipment from damage, and ensures proper functioning of protective devices like circuit breakers.
Different types of earthing sy...
posted on 21 Feb 2022
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
posted on 25 Apr 2023
I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.
Interview experience
based on 2 reviews
Rating in categories
Site Engineer
32
salaries
| ₹3 L/yr - ₹5.5 L/yr |
Safety Officer
18
salaries
| ₹2.7 L/yr - ₹5.1 L/yr |
Project Engineer
12
salaries
| ₹5.3 L/yr - ₹7 L/yr |
Civil Site Engineer
9
salaries
| ₹3.1 L/yr - ₹5.5 L/yr |
Project Manager
7
salaries
| ₹9.9 L/yr - ₹13.5 L/yr |
McKinsey & Company
BCG
KPMG India
Deloitte