  • Q1. How to deal with clients. To installed to solar planttwhat is the main thin
  • Ans. 

    To deal with clients for solar plant installation, communication, transparency, and understanding their needs are crucial.

    • Listen to their requirements and expectations

    • Provide clear and concise information about the project

    • Be transparent about the costs and timelines

    • Communicate regularly and promptly

    • Address any concerns or issues promptly

    • Ensure customer satisfaction by delivering quality work

    • Maintain a positive and prof...

  • Answered by AI

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Self introduction and roles and responsibilities of the previous company
  • Q2. Question related to safety and quality
Round 3 - HR 

(2 Questions)

  • Q1. Salary negotiation with respect to previous salary
  • Q2. Benefits and facilities provided by the company
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Gear box Related
  • Q2. Power plant related
  • Q3. CHP maintenance related
Round 3 - Group Discussion 

How many handle situation

Round 4 - HR 

(1 Question)

  • Q1. Sallary & accommodation

I applied via Naukri.com and was interviewed in Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What you are change job What ia your salary expectation
  • Ans. 

    I am changing jobs to seek new challenges and opportunities for growth.

    • Seeking new challenges and opportunities for growth

    • Looking for a more fulfilling role

    • Wanting to work in a different environment or industry

    • Desire for better work-life balance

    • Wishing to relocate to a different city or country

  • Answered by AI
Round 3 - Technical 

(3 Questions)

  • Q1. What is rcc grade m25
  • Ans. 

    RCC grade M25 is a concrete mix design ratio used in construction.

    • RCC stands for Reinforced Cement Concrete.

    • M25 is the compressive strength of the concrete after 28 days of curing.

    • The mix design ratio for M25 is 1:1:2 (cement:sand:aggregate).

    • It is commonly used in the construction of buildings, bridges, and other structures.

    • M25 grade concrete is suitable for moderate exposure conditions.

  • Answered by AI
  • Q2. Do you know bbs making
  • Ans. 

    Yes, I know bbs making.

    • BBS stands for Bar Bending Schedule, which is a document that provides details of reinforcement steel bars required for construction.

    • BBS making involves preparing the schedule by calculating the required length, weight, and number of bars for each structural element.

    • It is an important task for ensuring the strength and durability of the structure.

    • BBS making requires knowledge of engineering drawi...

  • Answered by AI
  • Q3. Do you know estimation
  • Ans. 

    Yes, estimation is a crucial aspect of project management civil.

    • Estimation involves predicting the cost, time, and resources required for a project.

    • It is important to have accurate estimations to ensure the project stays within budget and on schedule.

    • Estimation techniques include top-down, bottom-up, and parametric estimation.

    • Factors such as project scope, complexity, and risk must be considered when making estimations...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be positive towards interview always speak truth to interview regarding experience
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Types of cement and density?
  • Ans. 

    Types of cement include Portland cement, rapid-hardening cement, and sulfate-resistant cement. Density varies depending on the type of cement.

    • Types of cement: Portland cement, rapid-hardening cement, sulfate-resistant cement

    • Density varies based on the type of cement

    • Portland cement is the most common type used in construction projects

  • Answered by AI
  • Q2. Density of sleeper's in one km?
  • Ans. 

    The density of sleepers in one km can vary depending on the context, such as whether it refers to railway sleepers or people sleeping outdoors.

    • Density of railway sleepers in one km can vary based on the type of track and spacing between sleepers.

    • Density of people sleeping outdoors in one km would depend on the location and circumstances.

    • For example, in a homeless encampment, the density of sleepers in one km might be h...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. DDUGJY Project;- 33/11 KV New PSS ,33 KV Line ,11 KV Line and LT Line
  • Ans. Rerea of New PSS 60*40 mtr control room 1700 sqft road 60 mtr width 3.75 mtr footpath 15 mtr , fencing 40 mtr cable trench 130 mtr , 2 no 5 MVA PTR, 800Amp VCB and 800 Amp rating isolator in switch yards area. cost of civil work by sub cotractor 1.15 cr and electrical work 9.85 lac.
  • Answered Anonymously
  • Q2. RGGVY 12th Plan , HVDS Project, and Segrigation
  • Q3. ADB Project 33/11 KV New PSS R&M 33&11 KV line LT Line
Round 3 - HR 

(1 Question)

  • Q1. Final negotiation of salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Please consider as per work profile in electrical feild

I applied via Naukri.com and was interviewed in Dec 2021. There was 1 interview round.

Interview Questionnaire 

7 Questions

  • Q1. Required compaction as per MORTH of dry lean concrete
  • Ans. 

    The required compaction for dry lean concrete is specified by MORTH.

    • MORTH specifies the minimum dry density and optimum moisture content for dry lean concrete.

    • The compaction factor for dry lean concrete should be between 0.78 to 0.82.

    • The compaction should be done using a plate vibrator or a needle vibrator.

    • The required compaction can vary depending on the type of dry lean concrete being used.

    • Proper compaction is import...

  • Answered by AI
  • Q2. Which one is dependable to design of Rigid Pavement
  • Ans. 

    The design of Rigid Pavement is dependable on the type of traffic and the subgrade soil conditions.

    • Traffic load and volume

    • Subgrade soil conditions

    • Climate and weather conditions

    • Concrete mix design

    • Joint spacing and layout

  • Answered by AI
  • Q3. How much percentage of slope in shoulder
  • Ans. 

    The percentage of slope in shoulder varies depending on the location and purpose of the shoulder.

    • The slope of the shoulder can range from 0-45 degrees depending on the design of the road or pathway.

    • The slope of the shoulder should be designed to allow for proper drainage and prevent water from pooling on the road.

    • The slope of the shoulder should also be designed to provide a safe and stable surface for pedestrians and ...

  • Answered by AI
  • Q4. How much slope in normal camber
  • Ans. 

    The slope in normal camber varies depending on the design and purpose of the structure.

    • Normal camber is the slight arching or upward curve given to a beam or truss to counteract deflection due to loads.

    • The slope in normal camber can range from 1/8 inch to 1/2 inch per foot, depending on the span and load requirements.

    • For example, a bridge beam may have a normal camber slope of 1/4 inch per foot to support heavy traffic...

  • Answered by AI
  • Q5. How much quantity used in prime coat spread over WMM in per sq. Mt. Reby bitumen extractor machine
  • Ans. 

    The quantity of prime coat spread over WMM per sq. mt. depends on the type of bitumen extractor machine used.

    • The quantity of prime coat depends on the type of bitumen extractor machine used

    • It is important to follow the manufacturer's instructions for the specific machine being used

    • Factors such as temperature, humidity, and surface condition can also affect the quantity of prime coat needed

    • Typically, the quantity of pri...

  • Answered by AI
  • Q6. How much tack coat of quantity used over GSB in per sq.mt.by bitumen extractor machine
  • Ans. 

    The quantity of tack coat used over GSB per sq.mt. depends on various factors such as the type of bitumen extractor machine, the thickness of the GSB layer, and the weather conditions.

    • The quantity of tack coat used can range from 0.2 to 0.5 liters per sq.mt.

    • The type of bitumen extractor machine used can affect the quantity of tack coat used.

    • The thickness of the GSB layer can also impact the quantity of tack coat used.

    • W...

  • Answered by AI
  • Q7. Required compaction as per as MORTH of Embankment

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be in positive attitude if you know the answer then give it in a politely way, if not then say that I go for thorough study.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected

I applied via Recruitment Consulltant

Round 1 - Assignment 

Project Management , Production Management and HSE

Round 2 - HR 

(1 Question)

  • Q1. Very understanding and initiate. Motivated HR Department
Round 3 - Case Study 

Deeply interested in RR PACKAGE

Round 4 - Group Discussion 

Well. We used to do everyday

Interview Preparation Tips

Interview preparation tips for other job seekers - Thakur Sir, ♥️ has recommended for this job. I did my best to GREPL. If he allows will do more in this regard.

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Ek mahine me kitni billing kar loge

Interview Preparation Tips

Interview preparation tips for other job seekers - No one is going to ask technical questions, he only means by billing and only keep billing, you will remain in the company.
Round 1 - HR 
Round 2 - HR 

(2 Questions)

  • Q1. Why are you looking for a change?
  • Q2. Share details of your previous job.

Tell us how to improve this page.

Interview Questions from Similar Companies

GMR Group Interview Questions
4.0
 • 80 Interviews
Ashoka Buildcon Interview Questions
4.0
 • 64 Interviews
SYSTRA Interview Questions
4.0
 • 23 Interviews
View all
Madhav Infra Projects Solar Project Engineer Salary
based on 4 salaries
₹3.7 L/yr - ₹6.6 L/yr
31% more than the average Solar Project Engineer Salary in India
View more details
Civil Engineer
7 salaries
unlock blur

₹3.6 L/yr - ₹6 L/yr

Civil Site Engineer
6 salaries
unlock blur

₹2.4 L/yr - ₹4 L/yr

Highway Engineer
6 salaries
unlock blur

₹3.4 L/yr - ₹4.8 L/yr

Surveyor
5 salaries
unlock blur

₹1.5 L/yr - ₹5 L/yr

Procurement Manager
5 salaries
unlock blur

₹4.8 L/yr - ₹9 L/yr

Explore more salaries
Compare Madhav Infra Projects with

Larsen & Toubro Limited

4.0
Compare

GMR Group

4.0
Compare

Reliance Infrastructure

4.1
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview