Filter interviews by
I applied via Recruitment Consultant and was interviewed before Sep 2020. There were 3 interview rounds.
The B check part change name for DG sets refers to the replacement of components during the B check maintenance procedure.
During the B check, various parts of the DG sets are inspected and replaced if necessary.
The name of the part change depends on the specific component being replaced.
Examples of part changes during B check may include replacing the fuel filter, air filter, spark plugs, or oil filter.
The part change ...
ACB stands for Air Circuit Breaker. The coil name refers to the electromagnetic coil used in the ACB.
ACB stands for Air Circuit Breaker.
The coil name refers to the electromagnetic coil used in the ACB.
ACBs are used to protect electrical circuits from overloads and short circuits.
The coil in an ACB is responsible for generating the magnetic field that trips the breaker when a fault occurs.
Top trending discussions
Data Entry Operator
6
salaries
| ₹2.5 L/yr - ₹3 L/yr |
Tender Executive
5
salaries
| ₹2.4 L/yr - ₹5.5 L/yr |
HR Executive Generalist
5
salaries
| ₹2.4 L/yr - ₹5.8 L/yr |
Management Trainee
4
salaries
| ₹3.1 L/yr - ₹6 L/yr |
HR Executive
4
salaries
| ₹2.4 L/yr - ₹3.5 L/yr |
TCS
Infosys
Wipro
HCLTech