M/S PROTOMAC CONSTRUCTION Engineer Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. What is micro planning of construction site?
  • Ans. 

    Micro planning of construction site involves detailed planning and scheduling of activities to ensure efficient and timely completion of the project.

    • It involves breaking down the project into smaller tasks and assigning timelines for each task.

    • It includes identifying the resources required for each task and ensuring their availability.

    • Micro planning also involves monitoring the progress of each task and making necessar...

  • Answered by AI
  • Q2. What is the unit weight of 12mm bar?
  • Ans. 

    The unit weight of 12mm bar depends on the type of steel used.

    • The unit weight of 12mm bar made of mild steel is 0.89 kg/m

    • For high tensile steel, the unit weight of 12mm bar is 1.06 kg/m

    • The density of steel used in the bar also affects the unit weight

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Think positive,be honest,and make confidence.

I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About structur like, Shuttring and steel dia wise wait per/m special gravity of cement & aggregate, related QC

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Engineer Interview Questions & Answers

TCE user image Anonymous

posted on 12 Jun 2021

I applied via Company Website and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. How is lapping of beam done.
  • Ans. 

    Lapping of beam is done by grinding the surface of the beam to achieve a smooth and flat finish.

    • The beam is placed on a lapping machine with an abrasive surface.

    • The machine moves the beam back and forth while the abrasive surface grinds away any imperfections.

    • The process is repeated with finer and finer abrasives until the desired finish is achieved.

    • Lapping can improve the strength and durability of the beam.

    • It is comm...

  • Answered by AI
  • Q2. How much cube samples are taken for 60 cum of concrete.
  • Ans. 

    The number of cube samples taken for 60 cum of concrete depends on the specifications and requirements of the project.

    • The number of cube samples may vary depending on the project specifications and requirements.

    • Typically, 3 to 5 cube samples are taken for every 100 cubic meters of concrete.

    • The cube samples are taken to test the compressive strength of the concrete.

    • The number of cube samples may also depend on the locat...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be calm , listen carefully try your answe to the point and short.. Main a good english communication..

I applied via Walk-in and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Salary discussion and some professional questions.
  • Q2. Technical realated your stream

Interview Preparation Tips

Interview preparation tips for other job seekers - L&T is good organization for learning and self growth purpose.good employee welfare.

I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. All question based on past work experiences.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare all the past experience challenge and step by step your envolvement.

I applied via Naukri.com and was interviewed in Nov 2020. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. What is the previous job role ?
  • Q2. What is the percentage of bitumen in DBM ?
  • Ans. 

    The percentage of bitumen in DBM varies depending on the specific mix design and project requirements.

    • DBM stands for Dense Bituminous Macadam, which is a type of road construction material.

    • The percentage of bitumen in DBM typically ranges from 4% to 6% by weight.

    • The exact percentage of bitumen is determined based on factors such as traffic load, climate conditions, and desired durability.

    • Higher percentages of bitumen a...

  • Answered by AI
  • Q3. Why you want change your company ?
  • Q4. What is your salary expectation ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't expect genuine to salary hike, really so sad to genuine salary negotiation Person .

I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. ELSR MEANS

Interview Preparation Tips

Interview preparation tips for other job seekers - Elevated service level Reservoir

Interview Questionnaire 

1 Question

  • Q1. Technical question

I appeared for an interview before Jul 2016.

Interview Questionnaire 

2 Questions

  • Q1. Non technical as a math Gk and about me
  • Q2. Introduction

Interview Preparation Tips

Round: Test
Experience: My test scores is totall 57 number
Total Questions: 70

Round: HR Interview
Experience: My test scores is totall 57 number
Tips: At this must required your Confident

I appeared for an interview before Jul 2016.

Interview Preparation Tips

Round: Group Discussion
Duration: 4 hours 5 minutes

Round: Test
Duration: 2 hours 5 minutes

Tell us how to improve this page.

Compare M/S PROTOMAC CONSTRUCTION with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview