Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Lodha Group Team. If you also belong to the team, you can get access from here

Lodha Group Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Lodha Group Junior Engineer Interview Questions and Answers

Updated 18 Oct 2023

Lodha Group Junior Engineer Interview Experiences

2 interviews found

Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. HVAC PLANTROOM SCHEMATIC DRAWING EXPLANANTION
  • Q2. FCU working principle
  • Ans. 

    FCU stands for Fan Coil Unit, which works on the principle of heat transfer through a coil to cool or heat air.

    • FCU contains a coil through which chilled or hot water flows to transfer heat to or from the air.

    • A fan blows air over the coil to distribute the cooled or heated air into the space.

    • Thermostat controls the operation of the FCU based on the desired temperature set by the user.

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Last company working details
  • Q2. Salary expectation

I applied via Campus Placement and was interviewed in Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Work experience related
Round 3 - HR 

(1 Question)

  • Q1. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - 17000 CTc + food +bus chay +good culture

Junior Engineer Interview Questions Asked at Other Companies

asked in Tata Steel
Q1. What is the main role of Junior engineer in Electrical maintenanc ... read more
asked in JSW Steel
Q2. Buchhlz relay, what is relay, what is sensor, you read or not ele ... read more
Q3. If reactor pressure or synthesis pressure increases then how to b ... read more
Q4. What is the thickness of motar used in brickwork (vertical/horizo ... read more
Q5. What is quality,how many types of quality.5s kaizen,gd&t & ... read more

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Past work experience and some technical work related questions
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Introduction, previous experience
Round 3 - Technical 

(1 Question)

  • Q1. Past experience and rates

Interview Preparation Tips

Interview preparation tips for other job seekers - Pressure will be more, since i worked in engineering team compare to others contracts department will be feeling the pressure more
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Estimation and budget related
Round 2 - Technical 

(1 Question)

  • Q1. Basic process follows while billing and budgeting
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiations
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Previous experience
  • Q2. About previous project
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
  • Q1. Reconciliation format with example of construction materials
  • Q2. Types of foundation
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is tiling process
  • Q2. As per work poliy and methods telling all the process
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. All related your experience
Round 3 - HR 

(1 Question)

  • Q1. Hr type question

Lodha Group Interview FAQs

How many rounds are there in Lodha Group Junior Engineer interview?
Lodha Group interview process usually has 3 rounds. The most common rounds in the Lodha Group interview process are Resume Shortlist, One-on-one Round and HR.
What are the top questions asked in Lodha Group Junior Engineer interview?

Some of the top questions asked at the Lodha Group Junior Engineer interview -

  1. FCU working princi...read more
  2. HVAC PLANTROOM SCHEMATIC DRAWING EXPLANANT...read more

Tell us how to improve this page.

Lodha Group Junior Engineer Interview Process

based on 1 interview

Interview experience

2
  
Poor
View more

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 • 367 Interviews
CBRE Interview Questions
4.2
 • 274 Interviews
NoBroker Interview Questions
3.2
 • 237 Interviews
Kalpataru Limited Interview Questions
4.1
 • 101 Interviews
Colliers India Interview Questions
3.9
 • 70 Interviews
Casagrand Interview Questions
3.8
 • 59 Interviews
K Raheja Corp Interview Questions
4.3
 • 49 Interviews
View all
Lodha Group Junior Engineer Salary
based on 9 salaries
₹2.8 L/yr - ₹7 L/yr
18% more than the average Junior Engineer Salary in India
View more details

Lodha Group Junior Engineer Reviews and Ratings

based on 5 reviews

4.9/5

Rating in categories

4.3

Skill development

4.9

Work-life balance

4.8

Salary

4.8

Job security

3.7

Company culture

4.2

Promotions

4.3

Work satisfaction

Explore 5 Reviews and Ratings
Associate Manager
369 salaries
unlock blur

₹5.4 L/yr - ₹13 L/yr

Deputy Manager
323 salaries
unlock blur

₹6.5 L/yr - ₹16.6 L/yr

Manager
221 salaries
unlock blur

₹9 L/yr - ₹24 L/yr

Sales Executive
219 salaries
unlock blur

₹2 L/yr - ₹11 L/yr

Senior Executive
206 salaries
unlock blur

₹3.3 L/yr - ₹9.5 L/yr

Explore more salaries
Compare Lodha Group with

JLL

4.1
Compare

CBRE

4.2
Compare

NoBroker

3.2
Compare

Cushman & Wakefield

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview