i
Lodha Group
Filter interviews by
Toilet waterproofing procedure involves sealing all potential leakage points to prevent water damage.
Clean and dry the surface before applying waterproofing material
Use waterproofing membrane or coating to seal joints and corners
Ensure proper sealing around pipes and fittings to prevent leaks
Test the waterproofing by filling the toilet with water and checking for any leaks
Regular maintenance and inspection to prevent w
Top trending discussions
I applied via Campus Placement and was interviewed before Dec 2020. There was 1 interview round.
I applied via Indeed and was interviewed in Jan 2021. There was 1 interview round.
The lowest population in the world is in Vatican City.
Vatican City is the smallest country in the world with an area of 0.44 square kilometers.
As of 2021, the estimated population of Vatican City is around 800 people.
The population mainly consists of clergy, Swiss Guards, and other workers.
I applied via Referral and was interviewed before Apr 2021. There were 2 interview rounds.
posted on 9 Jun 2022
I applied via Campus Placement and was interviewed in May 2022. There was 1 interview round.
I applied via Referral
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
I will speak about the importance of building strong relationships with customers in sales.
Building strong relationships with customers leads to repeat business and referrals.
Listening to customers' needs and providing personalized solutions can help build trust.
Following up with customers after a sale shows that you value their business.
Providing excellent customer service can differentiate you from competitors.
Buildi...
posted on 3 Jan 2023
I applied via Approached by Company and was interviewed before Jan 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.
A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.
Shunt relay is connected in parallel with the main circuit of the ACB.
It detects overcurrents and activates to divert the excess current through a shunt path.
This helps in protecting the main circuit from damage due to overcurrents.
Shunt relays are commonly used in Air Circuit Breakers (ACBs...
CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.
CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.
It is often required in HVAC projects to ensure quality and compliance.
CoC may include details such as product specifications, testing results, and manufacturer information.
Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.
Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.
Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.
BOD is a ...
A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.
Monitors voltage levels in electrical systems
Triggers alarm or protective action if voltage exceeds or falls below set threshold
Used to protect equipment from damage due to voltage fluctuations
WTP plant works on the principle of physical and chemical processes to remove impurities from water.
Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.
Coagulation involves adding chemicals to water to make impurities clump together.
Flocculation helps in forming larger particles called floc for easier removal.
Sedimentation allows the floc to sett...
I provide daily and monthly reports on project progress, issues, and key metrics to track performance.
Daily reports include updates on tasks completed, challenges faced, and plans for the next day.
Monthly reports summarize overall progress, budget status, and any potential risks or delays.
Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...
posted on 2 Dec 2024
based on 1 interview
Interview experience
Associate Manager
388
salaries
| ₹5.4 L/yr - ₹13 L/yr |
Deputy Manager
322
salaries
| ₹6.5 L/yr - ₹18 L/yr |
Manager
221
salaries
| ₹9 L/yr - ₹24 L/yr |
Sales Executive
219
salaries
| ₹2 L/yr - ₹11 L/yr |
Senior Executive
206
salaries
| ₹3.9 L/yr - ₹9.5 L/yr |
JLL
CBRE
NoBroker
Cushman & Wakefield