i
Livio Building Systems
Filter interviews by
I applied via Naukri.com and was interviewed in Apr 2023. There were 4 interview rounds.
I have extensive accounting experience in various industries.
I have worked as a staff accountant for a manufacturing company for 3 years.
I have also worked as a financial analyst for a healthcare organization for 2 years.
I am proficient in using accounting software such as QuickBooks and SAP.
I have experience in preparing financial statements, managing accounts payable and receivable, and conducting audits.
I am knowled
I applied via Naukri.com and was interviewed in Nov 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Nov 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.
Types of drawing include architectural, structural, mechanical, electrical, and plumbing drawings.
Architectural drawings show the layout and design of a building.
Structural drawings detail the framework and support systems of a structure.
Mechanical drawings depict machinery and equipment.
Electrical drawings illustrate the electrical systems in a building.
Plumbing drawings show the piping and plumbing fixtures in a buil
Livio Building Systems interview questions for popular designations
I applied via Referral and was interviewed in Feb 2022. There were 3 interview rounds.
Productivity of manpower refers to the amount of work done by a person in a given time period.
Productivity can be measured in terms of output per hour, day, or week.
Factors that affect productivity include skill level, motivation, and working conditions.
Improving productivity can lead to increased efficiency and profitability.
For example, a construction worker may be able to lay 100 bricks per hour, while a software de...
I applied via Referral and was interviewed before Jun 2022. There were 3 interview rounds.
Weld material deposit can be calculated by determining the volume of the weld bead and multiplying it by the density of the material.
Calculate the volume of the weld bead by measuring the length, width, and height of the weld.
Multiply the volume by the density of the material to get the weld material deposit.
For example, if the weld bead has a volume of 10 cubic inches and the material density is 0.3 lb/in^3, the weld
ASTM codes commonly referred for raw materials include ASTM A36, ASTM A53, ASTM A106, etc.
ASTM A36 is a standard specification for carbon structural steel
ASTM A53 is a standard specification for pipe, steel, black and hot-dipped, zinc-coated, welded and seamless
ASTM A106 is a standard specification for seamless carbon steel pipe for high-temperature service
The weight of materials can be calculated by multiplying the volume of the material by its density.
Calculate the volume of the material (length x width x height)
Determine the density of the material (usually in kg/m^3)
Multiply the volume by the density to get the weight
Example: Weight of a 1m x 1m x 1m block of concrete with density 2400 kg/m^3 = 1m^3 x 2400 kg/m^3 = 2400 kg
I applied via Campus Placement and was interviewed before Aug 2020. There were 6 interview rounds.
Data cleaning best practices
Remove duplicate records
Handle missing values
Standardize data formats
Correct inconsistent data
Validate data integrity
Remove outliers
Normalize data
Handle data inconsistencies
Ensure data accuracy
Logistic regression is a statistical method used to analyze and model the relationship between a categorical dependent variable and one or more independent variables.
It is a type of regression analysis used for predicting the probability of a categorical outcome
It is commonly used in binary classification problems
It uses a logistic function to model the relationship between the independent variables and the dependent v...
I applied via Naukri.com and was interviewed before Oct 2020. There were 6 interview rounds.
I appeared for an interview in Feb 2025, where I was asked the following questions.
based on 9 interviews
Interview experience
based on 60 reviews
Rating in categories
BIM Engineer
13
salaries
| ₹4.2 L/yr - ₹10 L/yr |
Project Engineer
7
salaries
| ₹8 L/yr - ₹11 L/yr |
Procurement and Contracts Engineer
7
salaries
| ₹6.5 L/yr - ₹11.5 L/yr |
Project Manager
6
salaries
| ₹8.2 L/yr - ₹12 L/yr |
Project Coordinator
6
salaries
| ₹6.5 L/yr - ₹8.5 L/yr |
Bahwan Engineering
Eversendai
Descon Engineering
GS Engineering & Construction