Upload Button Icon Add office photos

Filter interviews by

Clear (1)

Listenlights Project Engineer Interview Questions and Answers

Updated 10 Jun 2023

Listenlights Project Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed in May 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(1 Question)

  • Q1. Tell me about yourself
Round 3 - Technical 

(1 Question)

  • Q1. What is Chilled Water System
  • Ans. 

    A chilled water system is a HVAC system that uses chilled water to cool and dehumidify air in buildings.

    • Chilled water is circulated through pipes to air handling units or fan coil units to cool the air.

    • Chilled water is typically produced by a chiller, which is a refrigeration machine.

    • Chilled water systems are commonly used in large commercial buildings, hospitals, and industrial facilities.

    • Chilled water systems are ene...

  • Answered by AI
Round 4 - One-on-one 

(1 Question)

  • Q1. Are you willing to relocate to site

Interview Preparation Tips

Interview preparation tips for other job seekers - Be genuine and confiedent

Interview questions from similar companies

I applied via Campus Placement and was interviewed before Apr 2019. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. What is your key achievement ? Either your study or professional
  • Q2. What you think about company ?
  • Q3. Where you see yourself in company ?
  • Q4. Why we select you?

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't panic or hesitate or stress
Opportunities never ends

I applied via Naukri.com and was interviewed in Nov 2018. There were 5 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. In this Round Bajaj Deputy manager asking questions regarding my experiance in which i gain. Actually my Experience is in Rural Electification so that question best on it. I want share questions.
  • Q2. 1)What is servey in R.E. 2)Write DTR structure with BOQ. 3)if i give you a unelectified habitation then How to electified it and Burn a bulb on a consumer.
  • Ans. 

    Survey in R.E. refers to the process of collecting data and information about a specific area or site.

    • Survey in R.E. involves measuring and mapping the land, identifying boundaries, and assessing topography.

    • It helps in understanding the existing conditions of the site and is crucial for planning and designing construction projects.

    • Survey techniques include using GPS, total stations, and other instruments to gather accu...

  • Answered by AI
  • Q3. 4)what is sag and how to minimize it. 5)if a consumer having distance between pole and his house is 5mtr then how much cable you provide him for connection. 6)write Bill of materials of service connection
  • Ans. 

    Sag is the vertical distance between a conductor's position when it is in tension and its position when it is in a relaxed state.

    • Sag is caused by the weight of the conductor and environmental factors such as temperature and wind.

    • To minimize sag, conductors can be made of materials with higher tensile strength, or additional support structures like suspension insulators can be used.

    • Sag can also be minimized by increasin...

  • Answered by AI
  • Q4. 7)How to billing 1 km line.
  • Ans. 

    Billing for a 1 km line involves calculating the cost based on the length of the line and any additional factors.

    • Determine the cost per unit length of the line

    • Multiply the cost per unit length by the length of the line to calculate the total billing amount

    • Consider any additional factors that may affect the billing, such as taxes or fees

    • Provide a detailed breakdown of the billing to the client, including the cost per un

  • Answered by AI
  • Q5. 1)In this round only salary discussion.

Interview Preparation Tips

Round: Project manager interview on job location
Experience: 1)How to Earth a HT line .
2)Phase difference between Conductors.


General Tips: I advice all the Interviee during interview time take confidence on self. And reminder on mind that what we done from starting till now.



Skills: Computer knowledge, Body Language, Leadership, Presentation Skills, Decision Making Skills
Duration: 1-4 weeks

I applied via Naukri.com and was interviewed before Apr 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About circuit breaker, transformer.
  • Q2. Single line diagrams, layout, substation calculation.

Interview Preparation Tips

Interview preparation tips for other job seekers - Please go through substation calculation and equipment.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Core de concepts
Round 2 - HR 

(1 Question)

  • Q1. Salary negotiation
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all Resume tips
Round 2 - HR 

(4 Questions)

  • Q1. Tell us about your self?
  • Ans. 

    I am a highly experienced Senior Engineer with expertise in various engineering disciplines.

    • Over 10 years of experience in engineering roles

    • Strong knowledge of mechanical, electrical, and software engineering

    • Proven track record of successfully leading and managing engineering projects

    • Proficient in using CAD software and other engineering tools

    • Excellent problem-solving and analytical skills

    • Effective communication and co...

  • Answered by AI
  • Q2. Tell us your current roll profile
  • Ans. 

    I am currently working as a Senior Engineer in a software development company.

    • Leading a team of engineers in developing and maintaining software applications

    • Designing and implementing software solutions to meet client requirements

    • Collaborating with cross-functional teams to ensure successful project delivery

    • Providing technical guidance and mentorship to junior engineers

    • Participating in code reviews and ensuring code qu...

  • Answered by AI
  • Q3. Why are you change
  • Q4. Current and expected CTC
Round 3 - Technical 

(1 Question)

  • Q1. Basic technical questions releted to roll profile.

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. GD&T QUESTION? Technical question?
  • Q2. GD&T- Geometric dimensioning & Tolerancing

Interview Preparation Tips

Interview preparation tips for other job seekers - Very through with technical knowledge.
Good knowledge of practical.
Confidence will add advantage.

I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. How to protect electrical panel in one words
  • Ans. 

    Insulation

    • Insulate the panel

    • Use protective covers

    • Ensure proper grounding

    • Regular maintenance

  • Answered by AI
  • Q2. What is the process of ug cable laying and its creteria
  • Ans. 

    UG cable laying process involves trenching, cable pulling, jointing, and testing.

    • Trenching is done to create a path for the cable and ensure proper depth

    • Cable pulling involves laying the cable in the trench and securing it with clamps

    • Jointing is done to connect two cables together using connectors and insulators

    • Testing is done to ensure the cable is properly installed and functioning

    • Criteria for UG cable laying include...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep calm during interview and answer each question one by one and try to answering in short when need then explain brief.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. All questions are related to the fieldwork.
Round 3 - HR 

(1 Question)

  • Q1. Discuss about the previous company and their working projects, CTC and working cultures etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident about your field work and management.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Technical background
Round 2 - HR 

(1 Question)

  • Q1. HRBP round personalities
Round 3 - One-on-one 

(1 Question)

  • Q1. Technical + psychological
Contribute & help others!
anonymous
You can choose to be anonymous

Listenlights Interview FAQs

How many rounds are there in Listenlights Project Engineer interview?
Listenlights interview process usually has 4 rounds. The most common rounds in the Listenlights interview process are Resume Shortlist, HR and Technical.
How to prepare for Listenlights Project Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Listenlights. The most common topics and skills that interviewers at Listenlights expect are Project Coordination, Project Engineering, Project Execution and Project Scheduling.

Recently Viewed

INTERVIEWS

Morningstar

No Interviews

INTERVIEWS

Listenlights

No Interviews

INTERVIEWS

Listenlights

No Interviews

INTERVIEWS

Tietoevry

No Interviews

LIST OF COMPANIES

Jyoti Structures

Locations

INTERVIEWS

Jyoti Structures

No Interviews

INTERVIEWS

Tietoevry

No Interviews

INTERVIEWS

Jyoti Structures

No Interviews

INTERVIEWS

Tietoevry

No Interviews

SALARIES

Listenlights

Tell us how to improve this page.

Listenlights Project Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Listenlights Project Engineer Salary
based on 90 salaries
₹3 L/yr - ₹8.3 L/yr
At par with the average Project Engineer Salary in India
View more details

Listenlights Project Engineer Reviews and Ratings

based on 16 reviews

4.4/5

Rating in categories

4.3

Skill development

3.7

Work-life balance

4.1

Salary

4.2

Job security

4.3

Company culture

3.7

Promotions

4.0

Work satisfaction

Explore 16 Reviews and Ratings
Project Engineer
90 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Project Engineer
41 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

EHS Officer
37 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Salesforce Developer
27 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Electrical Project Engineer
27 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Listenlights with

SYSKA LED Lights

2.9
Compare

Havells

4.0
Compare

Signify

3.5
Compare

Wipro Consumer Care & Lighting

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview