Upload Button Icon Add office photos

Filter interviews by

Linde India Senior Electrician Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

Interview experience
5
 Excellent
Difficulty level
 -
Duration
 -
Result
 -

2 Interview Rounds

1

Resume Shortlist Round

Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
2

Technical Round (3 Questions)

  • Q1. Preventive Maintenance of All Kinds of H.V & LV Breakers, Motors, Voltage Up To 33 KV & 11 KV & 6.6.KV /2400 KW ,Transformer(15.75KV /230 KV ), Corrective Maint...read more
  • Q2. Preventive Maintenance of All Kinds of H.V & LV Breakers, Motors, Voltage Up To 33 KV & 11 KV & 6.6.KV /2400 KW ,Transformer(15.75KV /230 KV ), Corrective Maint...read more
  • Q3. Preventive Maintenance of All Kinds of H.V & LV Breakers, Motors, Voltage Up To 33 KV & 11 KV & 6.6.KV /2400 KW ,Transformer(15.75KV /230 KV ), Corrective Maint...read more

Interview Preparation Tips

Interview preparation tips for other job seekers - Preventive Maintenance of All Kinds of H.V & LV Breakers, Motors, Voltage Up To 33 KV & 11
KV & 6.6.KV /2400 KW ,Transformer(15.75KV /230 KV ), Corrective Maintenance of HV/MV /LV
Switches gears,VCB,ACB,MOCB,SF6 Breakers, Breaker cubicle, earthling Switches ,Generator
earthling Switch ETC. Testing and calibration of all kinds of protections Relay of High Voltage and
low Voltage Motors, Transformers ,Generator like Under Voltage Relay , locked Rotor Relay
,Differential Relay , Negative Phase Sequence Relay , Over current/Thermal Over Current Relay ,
Bucholz Relay , DGPT Relay ETC. Transformer Oil BDV Test, Thermal Scanning , Earth fault and
Prediction Test of Equipment .Termination of high Voltage Motors , Cable Errection , Installation of
Motors, and Trial/Load Test. Transformer Oil Extracting ,Testing (BDV), Oil Filtration .
Equipments Of Oil & Gas Plant , Chlorine Plant, co2 plant
Maintenance of battery Banks , UPS for auxiliary Start UP and Control Voltage call safe supply.
EQUIPMENT UNDER RESPONSIBILITIES :
 MV MOTORS UPTO 2400 KW / 3 PHASE / 6600V / 60HZ
 LV MOTORS UPTO 125 KW / 3PHANSE / 380V / 60HZ
 RECTIFIER FOR CL2 PLANT CELL 3000 AMP / 380/60HZ / 120V DC
 TRANSFORMERS 15.75 KV / 230 KV – 150MVA
 TRANSFORMERS 15.75 KV / 6.6KV – 80 MVA
 TRANSFORMERS 6.6KV / 380V – 800KVA
 BATTERY BANKS 2000 AMP
 INVERTER / CHARGER 2000 AMP  SWITCH GEARS MV 6.6 KV / 3500 AMP SWITCH
Interview experience
5
 Excellent
Difficulty level
 Easy
Duration
 Less than 2 weeks
Result
Selected  Selected

2 Interview Rounds

1

Resume Shortlist Round

Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
2

HR Round (2 Questions)

  • Q1. Assigned for the Construction, Commissioning and Operation works related to tunnel system
  • Q2. Work includes Loop checking, testing, commissioning, functional test and trouble shooting of LV Switch gear. MCC, Motors, VFD

Interview Preparation Tips

Interview preparation tips for other job seekers - trouble shooting of LV Switch gear. MCC, Motors, VFD, PLC, BMS system, FIRE ALARM and LIGHTING system Installation.

I applied via Recruitment Consultant and was interviewed in May 2021.

3 Interview Rounds

Interview Questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Whatever we mentioned in cv. We want know first details.because they are asked question following our cv.

Interview Questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Half hour taking my self. Education technical details

1 Interview Round

Interview Questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Any time

Interview Questions

  • Q1. 10th pass and iti pass electrician 2015 to 2017 and 2018 1 year experience and 2018 to 2019 apprenticeship and 1 month madina gulf country shutdown View Answers (2)

Interview Preparation Tips

Interview preparation tips for other job seekers - Transformer, ups, light etc

I was interviewed in Oct 2019.

Interview Questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Electrical Technician

Tell us how to improve this page.

Interview Questions from Similar Companies

Air Liquide Interview Questions
3.8
 • 22 Interviews
Madina Group Interview Questions
4.6
 • 22 Interviews
Kent plc Interview Questions
4.5
 • 19 Interviews
NBTC GROUP Interview Questions
3.6
 • 18 Interviews
Airproducts Interview Questions
4.0
 • 14 Interviews
Honeywell Uop Interview Questions
3.6
 • 14 Interviews
Valmet Interview Questions
4.0
 • 14 Interviews
View all

Linde India Senior Electrician Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-Life balance

5.0

Salary & Benefits

2.0

Job Security

5.0

Company culture

5.0

Promotions/Appraisal

5.0

Work Satisfaction

Explore 1 Review and Rating
Principal Engineer
127 salaries
unlock blur

₹10 L/yr - ₹22.5 L/yr

Senior Executive Engineer
105 salaries
unlock blur

₹6 L/yr - ₹17 L/yr

Associate Manager
90 salaries
unlock blur

₹5.9 L/yr - ₹18 L/yr

Senior Principal Engineer
90 salaries
unlock blur

₹12.5 L/yr - ₹28 L/yr

Senior Engineer
78 salaries
unlock blur

₹5.2 L/yr - ₹13 L/yr

Explore more salaries
Compare Linde India with

Airproducts

4.0
Compare

Praxair

4.1
Compare

Air Liquide

3.8
Compare

Taiyo Nippon Sanso Corporation

2.5
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview