Upload Button Icon Add office photos

Filter interviews by

Lakshmi Infrastructure & Developers Interview Questions and Answers

Updated 13 Jun 2024

Lakshmi Infrastructure & Developers Interview Experiences

Popular Designations

3 interviews found

Assistant Manager Interview Questions & Answers

user image GOTTIPARTHI SONU KUMAR

posted on 13 Jun 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Regarding your previous work profiles
  • Q2. Regarding strong Technical background
Round 2 - HR 

(2 Questions)

  • Q1. Regarding your previous experience certificates.
  • Q2. Regarding your Payslips & Bank statements

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical round is very hard. Directly GM & MD will ask questions deeply regarding Technically

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (89)

Senior Foremen Interview Questions & Answers

user image PILLI BRAHMAM

posted on 3 Jun 2023

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
No response

I applied via Walk-in and was interviewed in May 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

What is the best performance in mechanical and engineering in mechanical functions are why i control best performance in production.

Round 3 - Technical 

(7 Questions)

  • Q1. Spares milaga and why to purchase less money mater.
  • Ans. 

    It is important to have spare parts in stock to avoid downtime and ensure smooth operations. Purchasing lower cost materials can help save money without compromising quality.

    • Having spares on hand reduces downtime in case of equipment failure.

    • Purchasing less expensive materials can help save money without sacrificing quality.

    • Regularly reviewing and updating spare parts inventory can help optimize costs and efficiency.

    • Co...

  • Answered by AI
  • Q2. Which item is maintained by hole mechanism.means mechanisms depand on which item
  • Ans. 

    The item maintained by hole mechanism is the drill bit.

    • Drill bit is maintained by the hole mechanism

    • The hole mechanism depends on the drill bit for drilling operations

    • Proper maintenance of the drill bit is essential for the effective functioning of the hole mechanism

  • Answered by AI
  • Q3. Work progress and maintenance
  • Q4. Man power control and requirements
  • Ans. 

    Man power control and requirements involve managing the number of workers needed for a project and ensuring they have the necessary skills.

    • Assess project scope and timeline to determine manpower needs

    • Recruit and hire qualified workers

    • Provide training and development opportunities for employees

    • Monitor and adjust staffing levels as needed

    • Utilize technology and automation to optimize workforce efficiency

  • Answered by AI
  • Q5. HSD is how to save conjunction
  • Ans. 

    HSD stands for High Speed Data, which is a method used to save conjunctions in a database.

    • HSD is a technique used to efficiently store and retrieve conjunctions in a database

    • It involves optimizing the storage and retrieval process for conjunctions

    • Examples of HSD techniques include indexing, compression, and caching

  • Answered by AI
  • Q6. Vechicls services
  • Q7. Maintenance in garage
  • Ans. 

    Maintenance in garage involves regular inspections, repairs, and upkeep of vehicles and equipment.

    • Regularly inspect vehicles for any signs of wear and tear

    • Perform routine maintenance tasks such as oil changes and tire rotations

    • Repair any issues promptly to prevent further damage

    • Keep garage clean and organized to improve efficiency

    • Train staff on proper maintenance procedures to ensure safety and quality work

    • Examples: Ch...

  • Answered by AI
Round 4 - Target to work 

(1 Question)

  • Q1. Feeld to check work

Senior Foremen Interview Questions asked at other Companies

Q1. Which item is maintained by hole mechanism.means mechanisms depand on which item
View answer (1)

Senior Surveyor Interview Questions & Answers

user image vadlamudi alluraiah

posted on 14 Feb 2024

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2023. There were 3 interview rounds.

Round 1 - Group Discussion 

In this gd we improved in confidence

Round 2 - Coding Test 

Experienced in this type of exams in performance

Round 3 - Aptitude Test 

Know the technical knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Senior Surveyor Interview Questions asked at other Companies

Q1. What is the difference of true north and magnetic north ?
View answer (1)

Jobs at Lakshmi Infrastructure & Developers

View all

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. The will ask you to technical
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
No response

I applied via Naukri.com and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. RCC Mivon shuttering experience?
  • Ans. 

    RCC Mivon shuttering experience involves using reinforced concrete construction techniques for formwork and scaffolding.

    • Experience in setting up formwork and scaffolding for reinforced concrete structures

    • Knowledge of RCC Mivon shuttering techniques and materials

    • Ability to interpret construction drawings and plans for RCC Mivon shuttering

    • Experience in coordinating with construction teams and contractors for RCC Mivon sh

  • Answered by AI
  • Q2. Finishing work experience?
  • Q3. Yes , I have. I told them about my job profile. They asked me 4- 5 questions related to work , which I answered well. But not recieved any response later.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepare for negotiation in salary structure.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Fundamentals of the functional knowledge
Round 3 - Technical 

(1 Question)

  • Q1. Fundamentals of functional knowledge
Round 4 - HR 

(1 Question)

  • Q1. Expectations of salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Project lifecycle
  • Q2. Project delivery

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical competence will be checked
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - One-on-one 

(1 Question)

  • Q1. Work experience
Round 2 - One-on-one 

(1 Question)

  • Q1. How to Handel the customer
  • Ans. 

    Handling customers involves active listening, empathy, problem-solving, and building relationships.

    • Listen actively to understand the customer's needs and concerns.

    • Show empathy and understanding towards the customer's situation.

    • Provide solutions to address the customer's issues or requirements.

    • Build rapport and trust with the customer to create a positive relationship.

    • Handle objections calmly and professionally.

    • Follow u...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Joining date and salary discussion
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Reason for leaving previous company
  • Ans. 

    Seeking new challenges and growth opportunities

    • Desire for career advancement

    • Looking for a more challenging role

    • Seeking new learning opportunities

    • Company restructuring led to changes in job responsibilities

  • Answered by AI
  • Q2. Required skills related questions
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - HR 

(2 Questions)

  • Q1. Professional details
  • Q2. Job continuation
Round 2 - Technical 

(2 Questions)

  • Q1. Excel and formulas
  • Q2. Formulas
Round 3 - One-on-one 

(1 Question)

  • Q1. Professional regards

Lakshmi Infrastructure & Developers Interview FAQs

How many rounds are there in Lakshmi Infrastructure & Developers interview?
Lakshmi Infrastructure & Developers interview process usually has 3 rounds. The most common rounds in the Lakshmi Infrastructure & Developers interview process are Group Discussion, Technical and Resume Shortlist.
How to prepare for Lakshmi Infrastructure & Developers interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Lakshmi Infrastructure & Developers. The most common topics and skills that interviewers at Lakshmi Infrastructure & Developers expect are Accounting, SQL Server, Audit Management, Auditing and Balance Sheet Review.
What are the top questions asked in Lakshmi Infrastructure & Developers interview?

Some of the top questions asked at the Lakshmi Infrastructure & Developers interview -

  1. Which item is maintained by hole mechanism.means mechanisms depand on which i...read more
  2. Spares milaga and why to purchase less money mat...read more
  3. HSD is how to save conjunct...read more

Tell us how to improve this page.

Lakshmi Infrastructure & Developers Interview Process

based on 3 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

Novel Office Interview Questions
4.1
 • 63 Interviews
Omaxe Interview Questions
4.1
 • 36 Interviews
DEC Infra Interview Questions
3.7
 • 24 Interviews
DRA Homes Interview Questions
4.6
 • 23 Interviews
Runwal Group Interview Questions
3.8
 • 21 Interviews
Arkade Group Interview Questions
4.3
 • 20 Interviews
N.K. Realtors Interview Questions
4.2
 • 19 Interviews
View all

Lakshmi Infrastructure & Developers Reviews and Ratings

based on 47 reviews

4.1/5

Rating in categories

3.9

Skill development

4.0

Work-life balance

3.5

Salary

4.0

Job security

3.7

Company culture

3.3

Promotions

3.8

Work satisfaction

Explore 47 Reviews and Ratings
Senior Engineer - Highways

Kota,

Jaipur

+2

6-11 Yrs

Not Disclosed

Senior Engineer - Structures

Kota,

Jaipur

+2

6-11 Yrs

Not Disclosed

Construction Manager - Highways

Kota,

Jaipur

+2

10-12 Yrs

₹ 8.4-8.2 LPA

Explore more jobs
Store Incharge
9 salaries
unlock blur

₹5.2 L/yr - ₹6.6 L/yr

Civil Site Engineer
8 salaries
unlock blur

₹1.1 L/yr - ₹4.5 L/yr

Senior Engineer
6 salaries
unlock blur

₹4.5 L/yr - ₹7.2 L/yr

Construction Management
6 salaries
unlock blur

₹8.2 L/yr - ₹12 L/yr

Mechanical Engineer
6 salaries
unlock blur

₹2.4 L/yr - ₹3.8 L/yr

Explore more salaries
Compare Lakshmi Infrastructure & Developers with

Omaxe

4.1
Compare

Runwal Group

3.8
Compare

Mahindra Lifespace Developers

4.1
Compare

Realty Assistant

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview