Upload Button Icon Add office photos

Filter interviews by

KVK Energy and Infrastructure Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Feb 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Explain your work profile.
Round 3 - Technical 

(1 Question)

  • Q1. Second round with plant head.
Round 4 - HR 

(1 Question)

  • Q1. Salary discussion.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About Self Introduction
Round 3 - Technical 

(3 Questions)

  • Q1. About Pipeline related codes
  • Q2. Ndt related codes & criteria
  • Q3. Tlp related standards

Interview Preparation Tips

Interview preparation tips for other job seekers - Be through with codes and standards of every process like welding,RT,Coating, Testing,Tlp etc.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. GI/MDPE Related Question
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Aptitude ,logical reasoning and quant aptitude

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Design tinyurl system design

Interview Questionnaire 

1 Question

  • Q1. Case study regarding water base plant

Interview Preparation Tips

Interview preparation tips for other job seekers - Go thoroughly in the case study part. They will check how your brain work
Round 1 - One-on-one 

(2 Questions)

  • Q1. What is your name and designation
  • Q2. Where are you from and
Round 2 - One-on-one 

(1 Question)

  • Q1. Who is the ceo of abc

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and rock the interview with good communication skills.do not stumble on ypur answers

I applied via LinkedIn and was interviewed in Mar 2021. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. How did u help to your new organization?
  • Q2. I will do my level best for which I really motivated for new position.

Interview Preparation Tips

Interview preparation tips for other job seekers - Confident as u are are experience with your work and do hard work.

I applied via Company Website and was interviewed in Jun 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. How to find bearings details from bearing number.
  • Ans. 

    To find bearing details from bearing number, refer to bearing catalogs or manufacturer's website.

    • Refer to bearing catalogs or manufacturer's website for detailed information

    • Search for the bearing number on the manufacturer's website to find specifications, dimensions, load ratings, and other details

    • Consult the bearing catalog to understand the type of bearing, its construction, and its applications

    • Contact the manufactu...

  • Answered by AI
  • Q2. How to coal yard management ?
  • Ans. 

    Coal yard management involves efficient handling, storage, and transportation of coal.

    • Ensure proper storage and handling of coal to prevent contamination and loss

    • Implement safety measures to prevent accidents and injuries

    • Regularly inspect and maintain equipment to ensure smooth operations

    • Monitor coal inventory and plan for timely replenishment

    • Coordinate with suppliers and transporters for timely delivery of coal

    • Impleme...

  • Answered by AI
  • Q3. How to calculate SCC
  • Ans. 

    SCC stands for Social Cost of Carbon and is calculated by estimating the economic damages caused by each ton of carbon dioxide emissions.

    • SCC is calculated by estimating the economic damages caused by each ton of carbon dioxide emissions

    • It takes into account the long-term effects of climate change on agriculture, health, property damage, and other factors

    • The SCC value is used to determine the cost-effectiveness of polic...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - * just answer cool mind & just look over the coal handling consumption.

Skills evaluated in this interview

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Package discussion and accommodation discussion
Round 3 - Technical 

(2 Questions)

  • Q1. Where are you work and your present company.
  • Q2. Operation department in NGSL at jharsuguda site

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare good resume where you are work.
Minimum 20 points mentioned.

Tell us how to improve this page.

KVK Energy and Infrastructure Reviews and Ratings

based on 22 reviews

3.1/5

Rating in categories

3.1

Skill development

3.6

Work-life balance

2.3

Salary

3.3

Job security

2.9

Company culture

2.1

Promotions

2.7

Work satisfaction

Explore 22 Reviews and Ratings
Manager
4 salaries
unlock blur

₹6.1 L/yr - ₹10.6 L/yr

Deputy Manager
4 salaries
unlock blur

₹7 L/yr - ₹14.2 L/yr

Electrical Engineer
4 salaries
unlock blur

₹2.5 L/yr - ₹3.8 L/yr

Accounts & Finance Manager
4 salaries
unlock blur

₹4.8 L/yr - ₹6.6 L/yr

Control Room Engineer
4 salaries
unlock blur

₹6 L/yr - ₹6 L/yr

Explore more salaries
Compare KVK Energy and Infrastructure with

McNally Bharat Engineering

4.1
Compare

ABCI Infrastructures

3.4
Compare

Sterling Oil Exploration & Energy Production

3.6
Compare

Kuwait National Petroleum Company

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview