Filter interviews by
I applied via Naukri.com and was interviewed before Oct 2022. There were 4 interview rounds.
Problem and route cause
I applied via Naukri.com and was interviewed in Jun 2023. There was 1 interview round.
Parameters of costing refer to the factors that influence the cost of a product or service.
Parameters can include materials, labor, overhead, and profit margin.
Other factors like transportation costs, taxes, and market demand can also impact costing.
Understanding and analyzing these parameters is crucial for accurate pricing and cost control.
For example, in manufacturing, the cost of raw materials and labor are key par
posted on 9 Oct 2023
I applied via Referral and was interviewed before Oct 2022. There was 1 interview round.
posted on 1 Apr 2024
I applied via Recruitment Consulltant and was interviewed in Oct 2023. There were 2 interview rounds.
Identify root cause, analyze impact, propose solutions, test solutions, implement changes
Identify the root cause of the random problem by analyzing existing parameters
Analyze the impact of the problem on the system or project
Propose potential solutions to address the random problem
Test the proposed solutions to ensure effectiveness
Implement changes based on the tested solutions
Monitor the system to ensure the random pr
When sudden rejection goes higher how you handle situation
I applied via Approached by Company and was interviewed in Jun 2022. There were 3 interview rounds.
Routine work responsibilities include performing regular tasks and duties as part of the job.
Routine work responsibilities involve completing daily, weekly, or monthly tasks
These tasks are typically outlined in job descriptions or standard operating procedures
Examples of routine work responsibilities may include data entry, report generation, equipment maintenance, etc.
I am a senior engineer with expertise in [specific field]. I have [number] years of experience in [industry/technology].
Expertise in [specific field]
Years of experience in [industry/technology]
Accomplishments or projects related to [specific field/technology]
Skills or certifications relevant to the position
Passion for continuous learning and professional development
Implemented a new software system that improved efficiency and reduced costs by 20%.
Implemented a new software system
Improved efficiency
Reduced costs by 20%
My salary expectations are negotiable and dependent on the overall compensation package offered.
I am open to discussing salary expectations based on the responsibilities and requirements of the position
I am looking for a fair and competitive compensation package
I am willing to consider other benefits such as healthcare, retirement plans, and vacation time
I am interested in opportunities for growth and advancement withi
posted on 7 Nov 2023
I applied via Referral and was interviewed in Oct 2023. There were 3 interview rounds.
I applied via Recruitment Consultant
QMS stands for Quality Management System and TPM stands for Total Productive Maintenance System.
QMS is a set of policies, processes, and procedures required for planning and execution of quality control.
TPM is a maintenance program that aims to maximize equipment effectiveness and minimize downtime.
QMS focuses on meeting customer requirements and improving customer satisfaction.
TPM focuses on improving equipment reliab...
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
The 7QC tools are a set of quality control tools used in process improvement. There are 7 tools in total.
The 7QC tools are: Pareto Chart, Cause and Effect Diagram, Check Sheet, Histogram, Scatter Diagram, Control Chart, and Flowchart.
These tools are used to identify, analyze, and solve quality-related problems in various processes.
Each tool serves a specific purpose, such as identifying the most significant issues (Par...
MSA stands for Measurement System Analysis. There are two types of MSA studies: Attribute Agreement Analysis and Variable Gauge R&R Study.
MSA is a method used to assess the measurement system's capability to provide accurate and reliable data.
Attribute Agreement Analysis is used when the measurement system classifies items into categories.
Variable Gauge R&R Study is used when the measurement system provides numerical m...
MSA study criteria refers to the guidelines and requirements for conducting a Measurement System Analysis.
MSA study criteria outline the steps and procedures for evaluating the measurement system used in a process.
It includes criteria for selecting appropriate measurement tools and techniques.
The criteria define the acceptable levels of accuracy, precision, linearity, and stability for the measurement system.
It also in...
based on 10 reviews
Rating in categories
OET
368
salaries
| ₹1.5 L/yr - ₹3 L/yr |
Trainee Operating Engineer
361
salaries
| ₹1.5 L/yr - ₹3 L/yr |
Senior Engineer
231
salaries
| ₹2.5 L/yr - ₹9 L/yr |
Assistant Manager
199
salaries
| ₹4.5 L/yr - ₹11.5 L/yr |
Diploma Trainee Engineer
168
salaries
| ₹1.6 L/yr - ₹3.2 L/yr |
Delphi TVS
Motherson Automotive Technologies and Engineering
Belrise Industries
Faurecia