I applied via Recruitment Consulltant and was interviewed in Sep 2023. There was 1 interview round.
Being Good Communication skill is Must
I applied via Referral and was interviewed before Apr 2021. There were 3 interview rounds.
Per MW cost with rational refers to the cost of generating one megawatt of electricity with a logical and reasonable approach.
Per MW cost with rational is calculated by taking into account all the expenses incurred in generating one megawatt of electricity.
This includes the cost of fuel, maintenance, labor, and other operational expenses.
The cost can vary depending on the type of power plant, fuel source, and location.
...
I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.
DFIG generator stands for Doubly Fed Induction Generator, used in wind turbines for variable speed operation.
DFIG generator is a type of induction generator used in wind turbines.
It allows for variable speed operation, improving efficiency and power quality.
DFIG generator has two sets of windings - stator windings connected directly to the grid and rotor windings connected through a converter.
The converter controls the...
Synchronous generators produce power at a constant frequency, while asynchronous generators do not require synchronization with the grid frequency.
Synchronous generators have a fixed magnetic field and produce power at a constant frequency.
Asynchronous generators do not need to be synchronized with the grid frequency and can operate at variable speeds.
Synchronous generators are typically used in power plants, while asy...
I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.
Critical path is the longest path in a project schedule, representing the shortest time in which the project can be completed.
Critical path is the sequence of tasks that determines the total duration of a project.
It is the longest path through the project network diagram, with zero float or slack.
Any delay in tasks on the critical path will directly impact the project's completion date.
Identifying the critical path hel...
I applied via Walk-in and was interviewed before Jun 2021. There were 4 interview rounds.
Basic electrical topics. wind energy, solar
Your past experience and project repots
Yes about of renewability energy
I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.
Psychometric test happened online
I applied via Referral and was interviewed before Jul 2021. There were 4 interview rounds.
I applied via Referral and was interviewed in Oct 2024. There was 1 interview round.
Using PSCAD to create a grid-tied wind power plant
Create a new project in PSCAD
Design the wind turbine system with appropriate parameters
Connect the wind turbine system to the grid
Simulate the system to analyze its performance
Optimize the design for maximum efficiency
I applied via Walk-in and was interviewed in May 2023. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
37
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Manager
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
15
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Suzlon Group
Tata Power
Adani Green Energy
Azure Power