I applied via Naukri.com and was interviewed before Jul 2022. There were 5 interview rounds.
Various questions related to sale. How to close a deal. What are the process involved. What is value selling. Difference between marketing and sales
I applied via Referral and was interviewed before Jun 2022. There were 3 interview rounds.
Top trending discussions
Reasoning and mental awareness
Like SSC test if you read the test prep. Books you can crack it
posted on 13 Apr 2024
I applied via Naukri.com and was interviewed before Apr 2023. There were 3 interview rounds.
MBA presentation and course knowledge
There are various types of engines used in construction equipment.
Diesel engines are commonly used in construction equipment due to their high torque and fuel efficiency.
Gasoline engines are also used in smaller construction equipment.
Electric engines are becoming more popular for their low noise and zero emissions.
Hybrid engines combine the benefits of both diesel and electric engines.
Some construction equipment may a...
I was interviewed before May 2016.
I have strong leadership and communication skills that are better suited for a non-technical role.
I excel in managing teams and resolving conflicts
I have a knack for strategic planning and decision-making
I enjoy interacting with customers and providing excellent service
posted on 25 Oct 2017
I was interviewed before Oct 2016.
Turbine erection alignment and commissioning procedure involves the process of aligning and commissioning a turbine for optimal performance.
Turbine erection alignment involves ensuring the turbine is properly aligned with the foundation and other components.
Commissioning procedure includes testing and verifying the functionality of the turbine.
Alignment is typically done using laser alignment tools to ensure precise po...
The turbine erection sequence refers to the specific order in which the components of a turbine are assembled and installed.
The foundation is prepared and the anchor bolts are installed.
The base frame is positioned and aligned with the anchor bolts.
The turbine tower sections are lifted and assembled on top of the base frame.
The nacelle, which houses the turbine's generator and other components, is installed on top of t...
based on 3 interviews
2 Interview rounds
based on 5 reviews
Rating in categories
Corporate Trainer
227
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Corporate Trainer
50
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
47
salaries
| ₹0 L/yr - ₹0 L/yr |
Customer Success Manager
27
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Inside Sales Manager
26
salaries
| ₹0 L/yr - ₹0 L/yr |
NIIT
Manipal ProLearn
Edureka
Simplilearn