Filter interviews by
Be the first one to contribute and help others!
I applied via Naukri.com and was interviewed before Jul 2022. There were 2 interview rounds.
Inventory management involves overseeing the flow of goods from manufacturers to warehouses to retail outlets.
Implementing a reliable inventory management system to track stock levels and reorder when necessary
Categorizing inventory into types such as raw materials, work-in-progress, and finished goods
Utilizing forecasting techniques to predict demand and prevent overstocking or stockouts
Regularly conducting physical i...
I applied via LinkedIn and was interviewed in May 2024. There was 1 interview round.
Experienced business analyst with a background in data analysis and process improvement.
Over 5 years of experience in analyzing business processes and identifying areas for improvement
Skilled in data analysis tools such as Excel, SQL, and Tableau
Strong communication and problem-solving skills
Led a project to streamline inventory management processes, resulting in a 20% reduction in costs
I was interviewed before Feb 2024.
The seven quality control tools are essential for process improvement and problem-solving in engineering.
Check sheet: Used to collect and analyze data in a systematic way, such as tracking defects in a manufacturing process.
Pareto chart: Helps identify the most significant factors contributing to a problem by displaying them in descending order of frequency or impact.
Cause-and-effect diagram (Fishbone diagram): Visuali...
Autonomous maintenance is a key pillar of Total Productive Maintenance (TPM) and involves seven steps to empower operators to take care of their equipment.
Step 1: Initial Cleaning - Operators clean the equipment and surrounding area to identify abnormalities.
Step 2: Eliminate Sources of Contamination - Remove dirt, dust, and debris that can lead to breakdowns.
Step 3: General Inspection - Operators visually inspect the ...
OEE calculations involve Availability, Performance, and Quality factors to measure equipment efficiency.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Possible Production.
Calculate Quality by dividing Good Units Produced by Total Units Started.
Implementing lean practices is mandatory for organizations to improve efficiency, reduce waste, and increase productivity.
Lean practices help organizations identify and eliminate waste in processes, leading to cost savings and improved efficiency.
By implementing lean practices, organizations can improve quality control and reduce defects in products or services.
Lean practices promote continuous improvement and empower ...
Downstream team members can be motivated through recognition, clear communication, opportunities for growth, and fostering a positive work environment.
Provide recognition for their hard work and achievements
Communicate clearly about goals, expectations, and feedback
Offer opportunities for growth and development, such as training or mentorship programs
Create a positive work environment through team-building activities a
Pareto analysis is a technique used to identify the most important factors contributing to a problem or situation.
Pareto analysis is based on the Pareto Principle, also known as the 80/20 rule, which states that roughly 80% of effects come from 20% of causes.
It involves identifying and prioritizing the factors that have the most significant impact on a particular outcome.
By focusing on addressing the most critical fact...
A Gemba walk is a Lean management technique where managers go to the actual workplace to observe operations and engage with employees.
Gemba walks involve observing processes, asking questions, and identifying opportunities for improvement.
Managers should focus on understanding the work being done and the challenges faced by employees.
Gemba walks help in building relationships with employees and fostering a culture of c...
Steps involved in performing safety risk assessments
Identify hazards and potential risks
Assess the likelihood and severity of each risk
Implement control measures to mitigate risks
Monitor and review the effectiveness of control measures
Document findings and recommendations
Communicate risks to relevant stakeholders
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement.
It involves autonomous maintenance, planned maintenance, and focused improvement activities.
TPM aims to improve overall equipment effectiveness (OEE) by reducing downtime, improving quality, and ...
I applied via Instahyre and was interviewed before Oct 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Oct 2022. There were 2 interview rounds.
PH is a measure of acidity or alkalinity of a solution. Normality and molarity are units of concentration in chemistry.
PH stands for potential of hydrogen and measures the acidity or alkalinity of a solution on a scale of 0 to 14.
Normality is a measure of concentration in chemistry, representing the number of equivalents of a substance per liter of solution.
Molarity is another measure of concentration, representing the...
I applied via Job Fair and was interviewed in Mar 2023. There were 2 interview rounds.
The out of specifications deviation handling procedure involves identifying, documenting, investigating, and resolving any deviations from specifications in software.
Identify the deviation from specifications in the software
Document the deviation with details such as date, time, and nature of the deviation
Investigate the root cause of the deviation
Implement corrective actions to resolve the deviation and prevent recurr...
Admixtures are substances added to concrete to enhance its properties. They can be classified into different types.
Water-reducing admixtures: reduce the amount of water needed for a given concrete mix
Retarding admixtures: delay the setting time of concrete
Accelerating admixtures: speed up the setting time of concrete
Air-entraining admixtures: introduce tiny air bubbles to improve workability and durability
Superplastici...
Mineral admixtures have several disadvantages in construction.
Mineral admixtures can affect the workability of concrete, making it more difficult to handle and place.
They may increase the setting time of concrete, leading to delays in construction.
Some mineral admixtures, such as fly ash, can have a negative impact on the strength and durability of concrete.
Mineral admixtures may introduce variability in concrete prope...
The water cement ratio is affected by the addition of admixture.
The water cement ratio is the ratio of the weight of water to the weight of cement in a concrete mix.
When an admixture is added, it can change the properties of the concrete mix, including the water cement ratio.
Some admixtures, such as water-reducing admixtures, can decrease the water cement ratio by allowing for a lower water content while maintaining wo...
I am based in [location].
I am currently based in [location].
My current location is [location].
I am located in [location].
I was interviewed before Jul 2016.
I was interviewed in Sep 2017.
posted on 9 Jul 2021
based on 15 reviews
Rating in categories
Sales Officer
13
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Analyst
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Sales Coordinator
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Accountant
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Supervisor
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Namaste India Foods
Bhagwati Products
Recipharm Pharmaservices
Patil Group