I applied via Naukri.com and was interviewed in Nov 2021. There was 1 interview round.
The compressor installation and commissioning procedure involves several steps to ensure proper functioning and efficiency.
Prepare the site for installation by ensuring a suitable foundation and proper ventilation.
Position the compressor unit and connect it to the power supply.
Install the necessary piping and connections for air intake and discharge.
Check and adjust the oil level and ensure proper lubrication.
Perform a...
Compressor testing standards ensure the quality and performance of compressors.
Compressor testing standards vary depending on the type of compressor and its intended use.
Some common testing standards include ASME PTC 10 for centrifugal compressors and API 617 for axial and centrifugal compressors.
Testing may include performance testing, vibration testing, and noise testing.
Compressor manufacturers may also have their o...
I will implement a robust inventory management system with real-time tracking and forecasting.
Implement a centralized inventory management system
Track inventory levels in real-time
Forecast demand and adjust inventory levels accordingly
Maintain good relationships with suppliers to ensure timely delivery
Regularly review inventory data to identify trends and make informed decisions
Implement a system for returns and exchan...
Warranty claim procedure is the process of making a claim for repair or replacement of a product covered under warranty.
The customer contacts the manufacturer or seller to initiate the claim process.
The customer provides proof of purchase and details of the issue with the product.
The manufacturer or seller may request additional information or inspection of the product.
If the claim is approved, the manufacturer or sell...
Checkpoints before first start of machine
Inspect machine for any damage or missing parts
Ensure all safety guards and devices are in place and functioning properly
Check oil and fluid levels and fill as necessary
Verify proper electrical connections and grounding
Perform a test run to ensure proper operation
Train operators on safe and proper use of the machine
To check vibration of airend, use a vibration meter at specific points. Standard varies by manufacturer. Allowable vibration value depends on machine type and application.
Use a vibration meter to check vibration of airend
Check vibration at specific points as per manufacturer's instructions
Standard for allowable vibration varies by manufacturer
Allowable vibration value depends on machine type and application
The key elements of airend are rotors, bearings, seals, and housing. The gap between screw elements should be 0.1-0.3mm.
Airend consists of rotors, bearings, seals, and housing.
Rotors are the main components that compress the air.
Bearings support the rotors and reduce friction.
Seals prevent air leakage and maintain efficiency.
Housing encloses the airend and provides structural support.
The gap between screw elements shou
Check refrigerant level, condenser coil, fan motor, and thermostat.
Check refrigerant level and add if necessary.
Clean condenser coil and ensure proper airflow.
Check fan motor for proper functioning.
Check thermostat and adjust if necessary.
The check points to resolve the issue of a compressor tripping with high ampere.
Check the electrical connections for loose or damaged wires
Inspect the compressor motor for any signs of overheating or damage
Verify that the compressor is receiving the correct voltage
Check the refrigerant levels and ensure they are within the specified range
Inspect the condenser coils for any blockages or dirt buildup
Check the compressor'...
Parameters to check during compressor testing
Check the suction and discharge pressure
Check the oil level and quality
Check the motor amperage and voltage
Check for any abnormal noise or vibration
Check the refrigerant charge level
Check the condenser and evaporator coils for cleanliness
Check the compressor's temperature
Check the compressor's oil pressure
Check the compressor's discharge temperature
Top trending discussions
posted on 20 Nov 2021
I applied via Naukri.com and was interviewed in May 2021. There was 1 interview round.
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jul 2021. There were 4 interview rounds.
I applied via Recruitment Consulltant and was interviewed before May 2022. There were 3 interview rounds.
posted on 11 Oct 2020
I applied via Recruitment Consulltant and was interviewed in Oct 2020. There were 5 interview rounds.
posted on 19 Feb 2024
I applied via Referral and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 28 Mar 2024
I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.
The process of erection of duct involves planning, fabrication, transportation, installation, and testing.
Planning involves determining the layout, size, and material of the ducts.
Fabrication includes cutting, bending, and assembling the ducts according to the design.
Transportation is the movement of fabricated ducts to the installation site.
Installation involves positioning and connecting the ducts to the HVAC system.
...
The code followed for the fabrication of steel structure materials is typically based on industry standards and regulations.
The fabrication of steel structures is typically governed by codes such as the American Institute of Steel Construction (AISC) Code of Standard Practice.
Other codes that may be followed include the American Welding Society (AWS) D1.1 Structural Welding Code - Steel.
Fabrication processes must also ...
The erection sequence of a steel structure involves planning and executing the assembly of components in a specific order to ensure safety and stability.
Start by assembling the foundation and anchor bolts.
Next, erect the columns and connect them to the foundation.
Then, install the beams and trusses to form the framework.
After that, add the bracing and diagonal members for stability.
Finally, complete the structure by ad...
posted on 16 Oct 2024
The erection sequence of ESP involves several steps to ensure proper installation and functioning.
1. Prepare the foundation for the ESP unit.
2. Install the support structure for the ESP.
3. Assemble the ESP components such as the casing, electrodes, and rapping system.
4. Connect the necessary electrical and mechanical components.
5. Test the ESP system for proper functioning before commissioning.
6. Commission the ESP sys...
Various ESP materials suppliers include Schlumberger, Baker Hughes, Halliburton, Weatherford, and National Oilwell Varco.
Schlumberger
Baker Hughes
Halliburton
Weatherford
National Oilwell Varco
posted on 2 Dec 2024
I applied via Naukri.com and was interviewed in Jun 2024. There was 1 interview round.
Some of the top questions asked at the Kirloskar Pneumatic Assistant Manager Service interview -
Assistant Manager
197
salaries
| ₹5.5 L/yr - ₹14 L/yr |
Senior Engineer
158
salaries
| ₹3.1 L/yr - ₹10 L/yr |
Production Engineer
85
salaries
| ₹2.1 L/yr - ₹4.5 L/yr |
Manager
81
salaries
| ₹7.3 L/yr - ₹17.5 L/yr |
Service Engineer
52
salaries
| ₹2 L/yr - ₹5 L/yr |
Thermax Limited
ABB
Isgec Heavy Engineering
Kirloskar Oil Engines