Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Kirloskar Pneumatic Team. If you also belong to the team, you can get access from here

Kirloskar Pneumatic Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Kirloskar Pneumatic Assistant Manager Sales & Service Interview Questions, Process, and Tips

Updated 26 Jan 2023

Kirloskar Pneumatic Assistant Manager Sales & Service Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(21 Questions)

  • Q1. Tell us about your family background and education background followed by current work profile, roles and responsibilities.
  • Q2. Commissioning and installation procedure of screw air compressor
  • Ans. 

    Commissioning and installation of screw air compressor involves several steps.

    • Inspect the site and ensure proper foundation and ventilation

    • Check electrical connections and ensure proper grounding

    • Install air and oil piping and connect to the compressor

    • Fill the oil and coolant and check for leaks

    • Start the compressor and check for proper operation

    • Adjust the pressure and perform a load test

    • Train the operators on proper usa...

  • Answered by AI
  • Q3. What are the recommendations and activities has to be done in pre commissioning visit?
  • Ans. 

    Pre-commissioning visit requires thorough planning and execution to ensure smooth commissioning of the project.

    • Review project specifications and requirements

    • Inspect equipment and systems for compliance

    • Verify installation and alignment of equipment

    • Perform functional testing of equipment and systems

    • Ensure safety measures are in place

    • Train personnel on equipment operation and maintenance

    • Prepare commissioning report

  • Answered by AI
  • Q4. Check points before fist start of air compressor
  • Ans. 

    Before starting an air compressor, certain checkpoints need to be followed.

    • Check the oil level and add if necessary

    • Check the air filter and clean or replace if necessary

    • Check the belts and tighten if necessary

    • Check the drain valve and ensure it is closed

    • Check the pressure relief valve and ensure it is working properly

    • Check the electrical connections and ensure they are secure

    • Check the hoses and fittings for any leaks o

  • Answered by AI
  • Q5. Check points if you face high temperature alarm in compressor
  • Ans. 

    Check oil level, condenser cleanliness, refrigerant charge, and fan operation.

    • Check the oil level in the compressor.

    • Ensure the condenser is clean and free of debris.

    • Check the refrigerant charge to ensure it is at the correct level.

    • Verify that the fan is operating properly.

    • Inspect the compressor for any signs of damage or wear.

  • Answered by AI
  • Q6. Check point if you face high pressure alarm in compressor
  • Ans. 

    Check oil level, check for leaks, check for clogged filters, check for overheating

    • Check the oil level in the compressor

    • Check for any leaks in the system

    • Check for clogged filters that may be restricting airflow

    • Check for overheating of the compressor

    • Inspect the pressure relief valve

    • Check the pressure switch settings

    • Inspect the cooling system

    • Check the drive belt tension and condition

  • Answered by AI
  • Q7. Check point if you face high current alarm in compressor
  • Ans. 

    Check for the cause of high current and take necessary actions to prevent damage to the compressor.

    • Check for any blockages in the suction or discharge lines

    • Check for any leaks in the system

    • Check for proper lubrication of the compressor

    • Check for proper voltage and amperage of the electrical supply

    • Check for any mechanical issues with the compressor

    • Take necessary actions to prevent damage to the compressor

  • Answered by AI
  • Q8. How you manager your inventory and what is inventory turn?
  • Ans. 

    Inventory management involves tracking and controlling the flow of goods to ensure optimal levels and minimize costs.

    • Inventory management involves monitoring stock levels, tracking sales and demand patterns, and placing orders to replenish inventory.

    • Effective inventory management helps prevent stockouts and overstocking, reducing costs and improving customer satisfaction.

    • Inventory turn, also known as inventory turnover...

  • Answered by AI
  • Q9. How you plan your inventory for machine installed across India?
  • Ans. 

    I plan inventory based on demand forecasting, lead time, and safety stock.

    • Analyze historical sales data and market trends to forecast demand

    • Consider lead time for procurement and delivery of machines

    • Maintain safety stock to avoid stockouts and meet unexpected demand

    • Collaborate with sales team to understand customer requirements and plan inventory accordingly

    • Use inventory management software to track inventory levels an...

  • Answered by AI
  • Q10. If we give Kirloskar airend to assemble in different make of machine then tell us is it possible and if yes or no, justify your answer.
  • Ans. 

    Yes, it is possible to assemble Kirloskar airend in different make of machine with certain modifications.

    • Modifications may be required to fit the airend properly in the machine.

    • The performance of the machine may be affected by the compatibility of the airend.

    • The warranty of the machine may be voided if the airend is not recommended by the manufacturer.

    • Examples of compatible machines include those from Atlas Copco, Inge

  • Answered by AI
  • Q11. How VFD works in in compressor and on references to take to work VFD smoothly?
  • Ans. 

    VFD stands for Variable Frequency Drive and it is used in compressors to control the speed of the motor and optimize energy consumption.

    • VFD controls the frequency and voltage supplied to the motor, allowing it to operate at different speeds.

    • By adjusting the speed of the motor, VFD can match the compressor's output to the demand, resulting in energy savings.

    • VFD can also provide soft start and stop functions, reducing me...

  • Answered by AI
  • Q12. What is CSI and you calculate the same?
  • Ans. 

    CSI stands for Customer Satisfaction Index. It is a measure of how satisfied customers are with a product or service.

    • CSI is a metric used to assess customer satisfaction.

    • It helps businesses understand how well they are meeting customer expectations.

    • CSI can be calculated by conducting surveys or using feedback forms.

    • The formula for calculating CSI is: (Number of satisfied customers / Total number of customers) x 100.

    • For...

  • Answered by AI
  • Q13. What do you look yourself in next 5 years?
  • Ans. 

    In the next 5 years, I see myself progressing in my career as an Assistant Manager Sales & Service.

    • Continuing to excel in my current role and taking on additional responsibilities

    • Developing strong leadership skills and mentoring junior team members

    • Expanding my knowledge and expertise in sales and service management

    • Working towards achieving higher sales targets and customer satisfaction

    • Building strong relationships with...

  • Answered by AI
  • Q14. If your boss is technically weak then will take his place and responsibility?
  • Ans. 

    Yes, I would take his place and responsibility if my boss is technically weak.

    • I believe in taking initiative and stepping up when needed.

    • I would assess the situation and identify areas where my boss needs support.

    • I would offer my assistance and take on additional responsibilities to ensure smooth operations.

    • I would communicate with my boss and offer guidance or training if necessary.

    • I would strive to maintain a positiv...

  • Answered by AI
  • Q15. How much gap you maintain between airend and housing and screw elements?
  • Ans. 

    The gap between the airend and housing and screw elements should be minimal to ensure efficient operation.

    • The gap is typically maintained within a few micrometers to prevent air leakage.

    • A smaller gap ensures better compression and reduces energy losses.

    • Proper alignment and precision manufacturing are crucial to achieve the desired gap.

    • Examples of gap specifications can vary depending on the specific compressor model an...

  • Answered by AI
  • Q16. Have you handled SPM and for what purpose we use the same?
  • Ans. 

    Yes, I have handled SPM (Sales Performance Management).

    • SPM is used to track and manage the performance of sales teams.

    • It helps in setting sales targets, monitoring progress, and incentivizing sales representatives.

    • SPM software provides tools for sales forecasting, territory management, and commission calculations.

    • By using SPM, organizations can improve sales effectiveness and drive revenue growth.

    • Example: I have used S...

  • Answered by AI
  • Q17. What do you do during AMC service of air compressor?
  • Ans. 

    During AMC service of air compressor, we perform routine maintenance and inspections to ensure optimal performance and prevent breakdowns.

    • Check and replace air filters

    • Inspect and clean cooling system

    • Check and adjust belts and pulleys

    • Inspect and replace worn out parts

    • Check and adjust oil levels

    • Perform performance tests

    • Provide necessary repairs and replacements

    • Ensure compliance with safety regulations

  • Answered by AI
  • Q18. What is warranty management and what do you do in warranty support?
  • Ans. 

    Warranty management involves handling customer claims for repairs or replacements of products covered under warranty.

    • Maintaining records of warranty claims and repairs

    • Coordinating with service centers for repairs or replacements

    • Communicating with customers regarding the status of their claims

    • Ensuring compliance with warranty policies and procedures

    • Analyzing warranty data to identify trends and areas for improvement

  • Answered by AI
  • Q19. What is your target spares sales and service for current year?
  • Ans. 

    My target for spares sales and service for the current year is to increase it by 15% compared to the previous year.

    • My target is to increase spares sales and service by 15% compared to the previous year

    • I plan to achieve this by implementing targeted marketing strategies and improving customer service

    • I will also focus on building strong relationships with existing customers and expanding our customer base

    • For example, I w...

  • Answered by AI
  • Q20. What do you want from Kirloskar and why you want to join Kirloskar?
  • Ans. 

    I want growth opportunities, a supportive work environment, and to contribute to Kirloskar's success.

    • I want growth opportunities to enhance my skills and advance my career.

    • I want a supportive work environment where I can collaborate with a talented team.

    • I want to contribute to Kirloskar's success by utilizing my sales and service expertise.

    • I want to work for a reputable company like Kirloskar that values customer satis...

  • Answered by AI
  • Q21. What are the power calculation in air compressor?
  • Ans. 

    Power calculation in air compressors involves determining the input power and the output power.

    • The input power is the electrical power required to run the air compressor.

    • The output power is the mechanical power produced by the air compressor.

    • The power calculation can be done using the formula: Power = Pressure x Flow Rate / Efficiency.

    • Pressure is measured in pounds per square inch (psi) or bar.

    • Flow rate is measured in ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If you are going for service related interview better prepare yourself with theoretical concepts and practical applications.

Interview questions from similar companies

I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Maintenance phylosophy
  • Ans. Depends on equipment running hour, criticality, availability and standby.
  • Answered Anonymously

Interview Preparation Tips

Topics to prepare for Thermax Limited Senior Engineer interview:
  • Boe
  • Energy manager
Interview preparation tips for other job seekers - Be confidential and technically strong.

I applied via Naukri.com and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. They just asked basics que. related to job profile.. seeking confidence..

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident.... should have basic knowledge of process. and knowledege of work and items.. and their costing and commercial terms.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. How many your experience
  • Ans. 

    I have over 8 years of experience in software engineering, specializing in full-stack development and team leadership.

    • Led a team of 5 engineers in developing a scalable e-commerce platform, resulting in a 30% increase in sales.

    • Implemented CI/CD pipelines that reduced deployment time by 50%, enhancing team productivity.

    • Worked on a healthcare application that improved patient data management, ensuring compliance with HIP

  • Answered by AI
  • Q2. What is your responsibility at site kindly tell us
  • Ans. 

    As a Senior Engineer on-site, I oversee project execution, ensure safety compliance, and mentor junior engineers.

    • Project Management: Oversee daily operations and ensure project milestones are met, e.g., coordinating with contractors.

    • Safety Compliance: Implement safety protocols and conduct regular safety audits to minimize risks, e.g., ensuring PPE usage.

    • Technical Guidance: Provide technical support and solutions to en...

  • Answered by AI
  • Q3. What is the process of alignment
  • Ans. 

    Alignment is the process of adjusting components to achieve optimal performance and coherence in systems or teams.

    • In engineering, alignment ensures that mechanical parts fit together correctly, e.g., aligning gears in a machine.

    • In project management, team alignment involves ensuring all members understand and work towards the same goals.

    • In software development, code alignment refers to maintaining consistent coding sta...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Thermax is a good company no dough
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Tell me about yourself ?
  • Q2. About your work experience?

Interview Preparation Tips

Interview preparation tips for other job seekers - Confidence , good energy level

Interview Questionnaire 

6 Questions

  • Q1. Drum level transmitter
  • Q2. Boiler interlocking
  • Q3. Vibration sensors
  • Q4. Turbine parameters and interlocking
  • Q5. DCS tag assigning process
  • Ans. 

    DCS tag assigning process involves assigning unique names to process variables for monitoring and control.

    • DCS tag assigning process is crucial for efficient process control and monitoring.

    • Each tag represents a process variable and is assigned a unique name for easy identification.

    • Tags can be assigned manually or automatically based on the process requirements.

    • Tag naming conventions should be consistent and follow indus...

  • Answered by AI
  • Q6. Smart positioners like Simens Sipart 02

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be confident don't nervous

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

Achievements in previous experience

Round 3 - Technical 

(2 Questions)

  • Q1. Technically full worthful
  • Q2. What is ur chievements in ur previous experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Life time job based on management
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in May 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. Which are the equipment used in steam turbine? And their principal and working and troubleshooting?
  • Ans. 

    Equipment used in steam turbine include turbine blades, nozzles, casing, rotor, bearings, and governor.

    • Turbine blades: convert steam energy into mechanical energy

    • Nozzles: control the flow of steam into the turbine

    • Casing: contains and directs the steam flow through the turbine

    • Rotor: connected to the turbine blades and rotates to generate power

    • Bearings: support the rotor and reduce friction

    • Governor: regulates the speed o

  • Answered by AI
  • Q2. Tell us about the Woodward 505 ?
  • Ans. 

    Woodward 505 is a versatile control system used in industrial applications.

    • The Woodward 505 is a widely used control system in industries such as power generation, oil and gas, and marine.

    • It offers advanced features like PID control, sequencing, and communication capabilities.

    • The Woodward 505 is known for its reliability and robustness in harsh operating environments.

    • It can be easily integrated with various types of se

  • Answered by AI
  • Q3. Explain the structure of the Honeywell DCS ?
  • Ans. 

    The Honeywell DCS (Distributed Control System) is a modular system consisting of controllers, I/O modules, and operator stations.

    • Consists of controllers, I/O modules, and operator stations

    • Uses a network to communicate between components

    • Allows for centralized control and monitoring of processes

    • Supports various communication protocols such as Modbus, OPC, etc.

    • Example: Honeywell Experion PKS

  • Answered by AI
  • Q4. What is PID and How does it work ?
  • Ans. 

    PID stands for Proportional-Integral-Derivative, a control loop feedback mechanism used in engineering.

    • PID is a control algorithm that calculates an error value as the difference between a desired setpoint and a measured process variable.

    • Proportional (P) control responds to the current error value.

    • Integral (I) control accumulates past errors to correct the present error.

    • Derivative (D) control predicts future errors bas...

  • Answered by AI
  • Q5. How to assign new chennal in Honeywell DCS ?
  • Ans. 

    To assign a new channel in Honeywell DCS, you need to access the configuration software and follow the steps to add the channel.

    • Access the Honeywell DCS configuration software

    • Navigate to the channel configuration section

    • Add a new channel by specifying the channel number, type, and other relevant parameters

    • Save the changes and verify the new channel is successfully assigned

  • Answered by AI
  • Q6. Tell the interlock and permissive of boiler and turbine?
  • Ans. 

    Interlocks and permissives are safety mechanisms in place to prevent unsafe operation of boiler and turbine systems.

    • Interlocks prevent certain actions from taking place unless specific conditions are met

    • Permissives allow certain actions to take place only if specific conditions are met

    • Example of interlock: Boiler feed pump interlock prevents the boiler from starting unless the feed pump is running

    • Example of permissive:...

  • Answered by AI

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Basic aptitude from rs agrawal book is sufficient

Round 2 - Technical 

(1 Question)

  • Q1. There were basic questions from SOM and mechanics
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Why do you want to change the job?
  • Q2. Where do you want to see yourself in next 5 years?

Kirloskar Pneumatic Interview FAQs

How many rounds are there in Kirloskar Pneumatic Assistant Manager Sales & Service interview?
Kirloskar Pneumatic interview process usually has 2 rounds. The most common rounds in the Kirloskar Pneumatic interview process are Resume Shortlist and Technical.
What are the top questions asked in Kirloskar Pneumatic Assistant Manager Sales & Service interview?

Some of the top questions asked at the Kirloskar Pneumatic Assistant Manager Sales & Service interview -

  1. If we give Kirloskar airend to assemble in different make of machine then tell ...read more
  2. How VFD works in in compressor and on references to take to work VFD smooth...read more
  3. How much gap you maintain between airend and housing and screw elemen...read more

Tell us how to improve this page.

Kirloskar Pneumatic Assistant Manager Sales & Service Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Thermax Limited Interview Questions
4.1
 • 260 Interviews
ABB Interview Questions
4.1
 • 242 Interviews
Timken Interview Questions
4.0
 • 48 Interviews
Lohia Group Interview Questions
3.7
 • 45 Interviews
View all
Assistant Manager
197 salaries
unlock blur

₹5.5 L/yr - ₹14 L/yr

Senior Engineer
158 salaries
unlock blur

₹3.1 L/yr - ₹10 L/yr

Production Engineer
85 salaries
unlock blur

₹2.1 L/yr - ₹4.5 L/yr

Manager
81 salaries
unlock blur

₹7.3 L/yr - ₹17.5 L/yr

Service Engineer
52 salaries
unlock blur

₹2 L/yr - ₹5 L/yr

Explore more salaries
Compare Kirloskar Pneumatic with

Thermax Limited

4.1
Compare

ABB

4.1
Compare

Isgec Heavy Engineering

3.8
Compare

Kirloskar Oil Engines

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview