Q1. What to do if concrete cube fail? (You will know after 28 days of casting. What to do?)
If concrete cube fails after 28 days of casting, investigate the cause and take corrective measures.
Investigate the cause of failure
Check if the mix design was correct
Check if the curing was done properly
Take corrective measures to prevent future failures
Re-cast the concrete cube for further testing
Q2. Tell me about PEB components and its function
PEB components are pre-engineered building components that are manufactured off-site and assembled on-site.
PEB components include primary framing, secondary framing, roof and wall panels, and accessories.
Primary framing consists of columns, rafters, and beams that support the weight of the building.
Secondary framing includes purlins, girts, and eave struts that provide additional support for the roof and walls.
Roof and wall panels are the outermost layer of the building and p...read more
Q3. Which cement is better.? And why?
The best cement depends on the specific project requirements and conditions.
Portland cement is commonly used for general construction purposes.
White cement is used for decorative purposes.
Rapid hardening cement is used for quick construction projects.
Low heat cement is used for massive concrete structures.
Blast furnace slag cement is used for marine structures and road construction.
The choice of cement should be based on factors such as strength, durability, setting time, and...read more
Q4. Types of steel used in PEB structure.
PEB structures use various types of steel depending on the requirements.
Primary framing members are made of hot rolled I-sections or built-up sections.
Secondary framing members are made of cold formed C or Z sections.
Roof and wall panels are made of galvanized steel sheets.
Bolts and nuts are made of high strength carbon steel.
Tension members are made of high strength steel cables or rods.
Examples of steel grades used are ASTM A36, ASTM A572, and ASTM A588.
Q5. Material Testing on site.
Material testing on site is crucial for ensuring quality and safety of construction projects.
Various tests are conducted on materials like concrete, steel, and soil to ensure they meet the required standards.
Tests include compressive strength, tensile strength, and moisture content.
Testing equipment like slump cones, compression machines, and moisture meters are used on site.
Results of material testing are recorded and analyzed to ensure compliance with project specifications...read more
Q6. What is Civil Engineer can do?
Civil Engineers design, build, and maintain infrastructure projects such as roads, bridges, buildings, and water systems.
Design and plan infrastructure projects
Ensure projects meet safety and environmental regulations
Manage construction and maintenance of projects
Collaborate with architects, contractors, and other professionals
Use computer-aided design (CAD) software to create plans and blueprints
Perform site investigations and surveys
Estimate project costs and timelines
Speci...read more