Filter interviews by
Clear (1)
I applied via Company Website and was interviewed in Sep 2023. There were 3 interview rounds.
Objective reasoning, maths and general knowledge questions.
All students have submitted their documents.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Jan 2024. There was 1 interview round.
Marketing old company was a traditional marketing firm that focused on traditional advertising methods.
The company primarily used print media such as newspapers and magazines for advertising.
They also relied on television and radio commercials to reach a wider audience.
Direct mail campaigns were a common strategy employed by the company.
They organized events and trade shows to promote their products or services.
The com...
I applied via Recruitment Consultant and was interviewed before Sep 2019. There was 1 interview round.
Implement access control, surveillance systems, and security policies to minimize security personnel.
Install access control systems to restrict unauthorized entry
Deploy surveillance systems to monitor activities
Implement security policies to ensure compliance
Train employees on security awareness and emergency response
Conduct regular security audits to identify vulnerabilities
Effective material management in a factory involves proper planning, procurement, storage, and distribution of materials.
Develop a comprehensive material management plan
Ensure timely procurement of raw materials
Implement an efficient storage system
Establish a streamlined distribution process
Regularly monitor inventory levels and adjust accordingly
Returnable and non-returnable stores require different management strategies.
Returnable stores require a system for tracking returned items and restocking them appropriately.
Non-returnable stores require careful inventory management to avoid overstocking and waste.
Consider offering incentives for customers to return items, such as discounts on future purchases.
Train staff on proper handling and processing of returns.
Re...
During a strike against the factory, managing requires effective communication, contingency planning, and prioritizing employee safety.
Communicate regularly with employees to keep them informed and address concerns
Develop contingency plans to minimize disruption to operations and customer service
Prioritize employee safety and well-being, including providing security measures if necessary
Consider negotiating with the st...
To manage and control theft, philferage, vandalism and stobages, one can implement security measures and conduct regular inspections.
Implement security measures such as CCTV cameras, security guards, and access control systems.
Conduct regular inspections to identify any potential security breaches and take necessary actions.
Train employees on security protocols and encourage them to report any suspicious activity.
Maint...
There are 5 classes of fire and each requires a specific type of extinguisher.
Class A fires involve ordinary combustibles like wood, paper, and cloth. Water or foam extinguishers are used.
Class B fires involve flammable liquids like gasoline and oil. Carbon dioxide or dry chemical extinguishers are used.
Class C fires involve electrical equipment. Carbon dioxide or dry chemical extinguishers are used.
Class D fires invol...
PASS procedures are used during firefighting to ensure safety of firefighters.
PASS stands for Pull, Aim, Squeeze, Sweep.
Pull the pin to activate the extinguisher.
Aim the nozzle at the base of the fire.
Squeeze the handle to release the extinguishing agent.
Sweep the nozzle from side to side to cover the area of the fire.
PASS is also used as a distress signal if a firefighter becomes trapped or lost.
The firefighter activa...
Yes, behaviour based safety involves identifying and addressing unsafe behaviours to prevent accidents.
Encourage employees to report unsafe behaviours
Provide training on safe behaviours and consequences of unsafe behaviours
Implement a reward system for safe behaviours
Conduct regular safety audits to identify areas for improvement
Examples: wearing PPE, following proper lifting techniques, reporting near misses
posted on 19 Jan 2022
I applied via Naukri.com and was interviewed in Jul 2021. There was 1 interview round.
Land acquisition process is the legal process of acquiring land for public or private use.
Identifying the land to be acquired
Negotiating with landowners or acquiring through eminent domain
Determining fair compensation for the land
Obtaining necessary permits and approvals
Transferring ownership of the land
Examples include acquiring land for building roads, schools, or shopping centers
I applied via Referral and was interviewed before Apr 2021. There were 3 interview rounds.
Per MW cost with rational refers to the cost of generating one megawatt of electricity with a logical and reasonable approach.
Per MW cost with rational is calculated by taking into account all the expenses incurred in generating one megawatt of electricity.
This includes the cost of fuel, maintenance, labor, and other operational expenses.
The cost can vary depending on the type of power plant, fuel source, and location.
...
I applied via Recruitment Consulltant and was interviewed in Jan 2022. There was 1 interview round.
posted on 25 Sep 2023
I applied via Naukri.com and was interviewed in Mar 2023. There were 2 interview rounds.
Find closest element and sort array of strings
Iterate through the array to find the closest element to a given target
Use a custom comparator function to sort the array based on distance from target
Handle edge cases like empty array or multiple closest elements
Different types of components in React include functional components, class components, and higher-order components.
Functional components are simple functions that take props as input and return JSX elements.
Class components are ES6 classes that extend React.Component and have a render method.
Higher-order components are functions that take a component as input and return a new component with additional functionality.
Ex...
posted on 10 Jan 2025
Key aspects of turbine protection include overspeed protection, vibration monitoring, temperature monitoring, and lube oil system protection.
Overspeed protection is crucial to prevent catastrophic failure in case of excessive turbine speed.
Vibration monitoring helps detect any abnormal vibrations that could indicate potential issues with the turbine.
Temperature monitoring ensures that the turbine operates within safe t...
I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.
DFIG generator stands for Doubly Fed Induction Generator, used in wind turbines for variable speed operation.
DFIG generator is a type of induction generator used in wind turbines.
It allows for variable speed operation, improving efficiency and power quality.
DFIG generator has two sets of windings - stator windings connected directly to the grid and rotor windings connected through a converter.
The converter controls the...
Synchronous generators produce power at a constant frequency, while asynchronous generators do not require synchronization with the grid frequency.
Synchronous generators have a fixed magnetic field and produce power at a constant frequency.
Asynchronous generators do not need to be synchronized with the grid frequency and can operate at variable speeds.
Synchronous generators are typically used in power plants, while asy...
I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.
Critical path is the longest path in a project schedule, representing the shortest time in which the project can be completed.
Critical path is the sequence of tasks that determines the total duration of a project.
It is the longest path through the project network diagram, with zero float or slack.
Any delay in tasks on the critical path will directly impact the project's completion date.
Identifying the critical path hel...
based on 2 interviews
Interview experience
based on 1 review
Rating in categories
Area Sales Manager
50
salaries
| ₹0 L/yr - ₹0 L/yr |
Area Service Manager
28
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
25
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
23
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Service Engineer
22
salaries
| ₹0 L/yr - ₹0 L/yr |
Suzlon Group
Adani Green Energy
Azure Power
ReNew