Grades of cement refer to the strength of cement. There are different grades of cement used for different purposes.
The most commonly used grades of cement are 33, 43, and 53.
The number in the grade represents the compressive strength of cement in megapascals (MPa) after 28 days of setting.
Grade 33 cement is used for plastering and finishing works, while grade 43 and 53 are used for construction purposes.
Higher grade ce...
Answers to questions related to concrete engineering
Characteristic compressive strength of concrete is the strength of concrete at 28 days of curing
To design concrete mix of grade M30, use a mix proportion of 1:1.5:3 of cement, sand, and aggregate respectively
Overlap in column reinforcement is provided at least 50 times the diameter of the bar to ensure continuity of reinforcement
TBM stands for Tunnel Boring Machine, u
Top trending discussions
I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.
Waterproofing work & Gypsum work processing
posted on 5 Nov 2024
I applied via Naukri.com and was interviewed before Nov 2023. There were 2 interview rounds.
Building finishing involves several steps such as painting, flooring, and installation of fixtures.
Prepare the surface by sanding and priming before painting.
Choose the type of flooring material (e.g. tiles, hardwood, laminate) and install it.
Install fixtures such as lighting, plumbing, and cabinetry.
Finish with trim work and touch-ups for a polished look.
I applied via Company Website and was interviewed in Jan 2023. There were 2 interview rounds.
Interior change in drawing refers to modifying the internal elements of a design or blueprint.
Identify the specific elements that need to be changed
Consider the impact of the changes on the overall design
Update the drawing with the new interior layout
Ensure that the changes align with the project requirements
I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.
Waterproofing work & Gypsum work processing
posted on 5 Nov 2024
I applied via Naukri.com and was interviewed before Nov 2023. There were 2 interview rounds.
Building finishing involves several steps such as painting, flooring, and installation of fixtures.
Prepare the surface by sanding and priming before painting.
Choose the type of flooring material (e.g. tiles, hardwood, laminate) and install it.
Install fixtures such as lighting, plumbing, and cabinetry.
Finish with trim work and touch-ups for a polished look.
I applied via Company Website and was interviewed in Jan 2023. There were 2 interview rounds.
Interior change in drawing refers to modifying the internal elements of a design or blueprint.
Identify the specific elements that need to be changed
Consider the impact of the changes on the overall design
Update the drawing with the new interior layout
Ensure that the changes align with the project requirements
based on 1 review
Rating in categories
Site Engineer
7
salaries
| ₹3 L/yr - ₹3.6 L/yr |
Executive Accountant
6
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Civil Site Engineer
6
salaries
| ₹3 L/yr - ₹4 L/yr |
Purchase Engineer
5
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Project Incharge
5
salaries
| ₹9 L/yr - ₹12 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Reliance Infrastructure