Kevadiya Construction Project Manager Interview Questions and Answers

Updated 13 Jun 2024

Kevadiya Construction Project Manager Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What process of SBR
  • Ans. 

    SBR stands for Schedule Baseline Review, a process in project management to review and approve the project schedule.

    • SBR is typically conducted after the project schedule has been developed and before the project execution phase begins.

    • During SBR, stakeholders review the schedule to ensure it is realistic, achievable, and aligns with project objectives.

    • Any necessary adjustments or revisions to the schedule may be made d...

  • Answered by AI
Round 2 - One-on-one 

(1 Question)

  • Q1. What type of difficulty in the site monitoring
  • Ans. 

    Difficulty in site monitoring can arise due to various factors such as access restrictions, technical issues, and environmental challenges.

    • Access restrictions - Limited access to certain areas of the site can make monitoring difficult.

    • Technical issues - Malfunctioning equipment or software can hinder monitoring efforts.

    • Environmental challenges - Extreme weather conditions or natural disasters can impact site monitoring...

  • Answered by AI

Skills evaluated in this interview

Interview questions from similar companies

I applied via Naukri.com and was interviewed before May 2020. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. About planning scheduling costing budgeting of water supply projects
  • Q2. How soon can you join
  • Ans. 

    I can join within two weeks.

    • I am currently serving a two-week notice period at my current job.

    • I have already completed all necessary paperwork and background checks.

    • I am ready to start as soon as possible.

    • I can adjust my start date based on the company's requirements.

  • Answered by AI
  • Q3. Process of recruitment is too lengthy
  • Q4. Three rounds conducted
  • Q5. Why did you left last company
  • Ans. 

    I left my last company to pursue new opportunities and challenges.

    • Seeking growth and advancement in my career

    • Looking for a company with a better cultural fit

    • Wanting to broaden my skill set

    • Desire for a higher level of responsibility

    • Company downsizing or restructuring

  • Answered by AI
  • Q6. Relation with previous bosses

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer very clearly honestly and politly
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

It was just a aptitude test

Round 2 - Technical 

(2 Questions)

  • Q1. Basic regarding professional area
  • Q2. Project worked at and experienced
  • Ans. 

    Managed a team to implement a new customer relationship management system

    • Led a team of 5 employees to successfully implement a new CRM system

    • Coordinated with IT department to ensure smooth integration of the system

    • Provided training to staff on how to use the new system effectively

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why i want to join the firm
  • Ans. 

    I want to join the firm because of its strong reputation, opportunities for growth, and alignment with my career goals.

    • Strong reputation in the industry

    • Opportunities for career growth and development

    • Alignment with my career goals and values

  • Answered by AI
  • Q2. Salary discussions

I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical questions, and previous company experience
Round 3 - One-on-one 

(7 Questions)

  • Q1. Technical questions, previous company experience
  • Q2. Concrete grade, site management
  • Q3. Site execution questions
  • Q4. Shuttering , reinforcement questions
  • Q5. Concrete grades ,qty taken
  • Q6. Finishing works Tiles ,granite plastering
  • Q7. Block work and finishing works

Interview Preparation Tips

Interview preparation tips for other job seekers - Improve technical knowledge and site management

I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Equipment layout details
  • Q2. Plot plan details and man and material movement path

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge on piping system, thickness calculations and materials are required

Equipment layout preparation as per oisd 118 and plot plan knowledge required.

I applied via Naukri.com and was interviewed in Jan 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Previous Project experience. Execution plan, Job responsibility, Technical for Electrical SLD, Chiller SLD, Functional test for all MEP items.

Interview Preparation Tips

Interview preparation tips for other job seekers - Try to give correct answer, What you have mentioned in your CV the same question will be raise from Technical Board...

Interview Questionnaire 

3 Questions

  • Q1. Tell me about your experience and ur self like education etc
  • Q2. What do you work in your profile.
  • Q3. Can you handle RVNL project
  • Ans. 

    Yes, I have experience in handling RVNL projects.

    • I have previously managed a similar railway project

    • I am familiar with the processes and regulations involved

    • I have a strong team to support me

    • I am confident in my ability to deliver the project on time and within budget

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. If your Experience person , mostly they ask your past experience work related question , If Fresher they ask theoretical question

I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Basics of fabrication and Erection methods
  • Q2. Regarding Safety
  • Q3. Resources management
  • Q4. Project planning

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Cool and prepared for all technical

I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. It asks your old experience based questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview Basicaly depends on your Luck. What he asked, if you answere, then you are selected, and not answering then you are rejected.

Kevadiya Construction Interview FAQs

How many rounds are there in Kevadiya Construction Project Manager interview?
Kevadiya Construction interview process usually has 2 rounds. The most common rounds in the Kevadiya Construction interview process are Technical and One-on-one Round.
What are the top questions asked in Kevadiya Construction Project Manager interview?

Some of the top questions asked at the Kevadiya Construction Project Manager interview -

  1. What type of difficulty in the site monitor...read more
  2. What process of ...read more

Tell us how to improve this page.

Kevadiya Construction Project Manager Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
Kevadiya Construction Project Manager Salary
based on 4 salaries
₹10 L/yr - ₹10.2 L/yr
42% less than the average Project Manager Salary in India
View more details
Civil Engineer
7 salaries
unlock blur

₹3 L/yr - ₹4.2 L/yr

Project Manager
4 salaries
unlock blur

₹10 L/yr - ₹10.2 L/yr

Site Engineer
4 salaries
unlock blur

₹1.9 L/yr - ₹5 L/yr

Civil Site Engineer
4 salaries
unlock blur

₹1.9 L/yr - ₹3 L/yr

Project Engineer
3 salaries
unlock blur

₹4.4 L/yr - ₹10 L/yr

Explore more salaries
Compare Kevadiya Construction with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview