Filter interviews by
I appeared for an interview in Sep 2021.
Top trending discussions
posted on 19 Mar 2024
I applied via Company Website and was interviewed before Mar 2023. There were 2 interview rounds.
Consists of 10 questions
Consists of 20 questions
posted on 28 Mar 2024
posted on 28 Mar 2024
SDLC stands for Software Development Life Cycle, which is a process used by software development teams to design, develop, and test high-quality software.
SDLC consists of several phases including planning, analysis, design, implementation, testing, and maintenance.
Each phase has its own set of activities and deliverables to ensure the software meets the requirements and quality standards.
Examples of SDLC models include...
CAN protocol is a communication standard used in automotive and industrial applications.
CAN protocol stands for Controller Area Network
It is a message-based protocol used for communication between electronic control units (ECUs)
CAN protocol allows for high-speed communication and real-time data transmission
It is commonly used in automotive applications for functions such as engine control, transmission control, and bod...
posted on 16 Jan 2021
posted on 2 Mar 2024
I applied via Newspaper Ad
posted on 19 Jul 2024
posted on 1 Apr 2022
I applied via Newspaper Ad and was interviewed before Apr 2021. There was 1 interview round.
posted on 25 Nov 2023
I applied via Job Fair and was interviewed in Oct 2023. There were 3 interview rounds.
based on 1 review
Rating in categories
Station Controller
67
salaries
| ₹2.5 L/yr - ₹6 L/yr |
Station Controller Train Operator
48
salaries
| ₹2.8 L/yr - ₹5.5 L/yr |
Rolling Stock Maintainer
43
salaries
| ₹2.8 L/yr - ₹4.5 L/yr |
Rolling Stock Engineer
38
salaries
| ₹2.6 L/yr - ₹5.2 L/yr |
Train Operator
33
salaries
| ₹2.4 L/yr - ₹4 L/yr |
Bombardier Transportation
Indira Gandhi International Airport
Indian Railway Catering and Tourism
Hyva