Filter interviews by
I applied via Recruitment Consulltant and was interviewed before Jun 2023. There was 1 interview round.
CNC toolings refer to the cutting tools used in CNC machines, with various geometries and types for different applications.
CNC toolings include end mills, drills, reamers, and inserts.
Different geometries such as square, ball nose, and corner radius are used for specific cutting tasks.
Types of CNC toolings include solid carbide, high-speed steel, and indexable inserts.
Proper selection of tooling geometry and type is cr
Top trending discussions
I applied via Company Website and was interviewed in Oct 2021. There was 1 interview round.
Motor and panel switchgear erection in oil and gas field
Experience in installation and maintenance of motor and panel switchgear in oil and gas field
Knowledge of safety regulations and procedures in hazardous environments
Ability to read and interpret technical drawings and schematics
Familiarity with testing and commissioning procedures
Experience in troubleshooting and resolving electrical issues
Examples: installation o...
Date of completion refers to the deadline or expected date of finishing a project or task.
It is important to set a realistic date of completion to ensure timely delivery of projects.
Factors such as available resources, team capacity, and project complexity should be considered when setting the date of completion.
Regular monitoring and tracking of progress can help ensure that the project is on track to meet the date of...
I applied via Campus Placement and was interviewed before Feb 2023. There were 2 interview rounds.
The questions cover topics related to turbochargers, IC engines, engine parts, manufacturing processes, management skills, and interpersonal communication.
Turbocharger is a device that increases the efficiency and power output of an engine by forcing extra air into the combustion chamber.
IC engine works on the principle of internal combustion where fuel is burned inside the engine to produce power.
CI engine stands for ...
I applied via Naukri.com
Prepare for topics on current events, government regulations, corporate trends
Prepare for Management case study on complex problems, strategic issues
I applied via Campus Placement
I applied via Recruitment Consultant and was interviewed in Aug 2020. There were 5 interview rounds.
I was interviewed before Feb 2021.
I applied via Naukri.com and was interviewed before Jan 2021. There was 1 interview round.
Parts planning technique involves efficient management of inventory to ensure availability of required parts.
Parts planning involves forecasting demand and determining optimal inventory levels.
Techniques like ABC analysis, Just-in-Time (JIT) inventory, and Economic Order Quantity (EOQ) are commonly used.
ABC analysis categorizes parts based on their importance and usage frequency.
JIT inventory aims to minimize inventory...
based on 1 interview
Interview experience
Assistant Manager
116
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
67
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Sales Manager
46
salaries
| ₹0 L/yr - ₹0 L/yr |
Applications Engineer
41
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Design Engineer
29
salaries
| ₹0 L/yr - ₹0 L/yr |
Sandvik Asia
Kobe Steel
Sumitomo Electric Industries
Mitsubishi Materials