Filter interviews by
I applied via Walk-in and was interviewed before Jul 2021. There were 4 interview rounds.
General quotations on manufacfung
Top trending discussions
I applied via Times Job and was interviewed before Dec 2020. There were 3 interview rounds.
Takt time is the rate at which a product must be produced to meet customer demand. Cycle time is the time it takes to complete one cycle of a process.
Takt time is calculated by dividing the available production time by the customer demand.
Cycle time is the time it takes to complete one unit of a product.
Cycle time can be used to identify bottlenecks in the production process.
Reducing cycle time can increase productivit...
Line balancing is the process of optimizing workloads across an assembly line to improve efficiency and productivity.
Identify the tasks required to complete the assembly process
Determine the cycle time for each task
Calculate the total available work time
Allocate tasks to workstations based on cycle time and available work time
Adjust the allocation to minimize idle time and maximize efficiency
I applied via Company Website and was interviewed in Jul 2024. There were 2 interview rounds.
Solved a production line bottleneck by implementing a new scheduling system
Identified bottleneck in production line causing delays
Researched and proposed new scheduling system to optimize workflow
Collaborated with team to implement new system and monitor results
I have a strong background in CAD software, problem-solving skills, and experience in process improvement.
Proficient in CAD software such as SolidWorks and AutoCAD
Strong problem-solving skills to troubleshoot manufacturing issues
Experience in process improvement to increase efficiency and reduce waste
My strength is attention to detail and problem-solving skills. My weakness is sometimes taking on too much work at once.
Strength: Attention to detail - I always ensure that every aspect of a project is thoroughly examined and executed correctly
Strength: Problem-solving skills - I am able to think creatively and find solutions to complex problems efficiently
Weakness: Taking on too much work - I have a tendency to overco...
I worked in a team on a project to improve production efficiency by implementing new automation technology.
Collaborated with team members to identify areas for improvement
Researched and evaluated different automation technologies
Worked together to develop a plan for implementation
Divided tasks among team members based on strengths and expertise
Regularly communicated progress and challenges to ensure project stayed on t
I was interviewed before Feb 2024.
I applied via Naukri.com and was interviewed in Jun 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.
Validation process ensures that a product meets the requirements and specifications set by the customer.
Validation process involves testing and analyzing a product to ensure it meets the desired specifications.
It is a crucial step in the manufacturing process to ensure quality and compliance.
Validation can include various tests such as performance testing, durability testing, and reliability testing.
Validation process ...
My role in the PD cycle involves designing, testing, and optimizing manufacturing processes to improve efficiency and quality.
Designing new manufacturing processes
Testing and evaluating the effectiveness of these processes
Optimizing existing processes to improve efficiency and quality
Collaborating with cross-functional teams to implement changes
Analyzing data to identify areas for improvement
I applied via Recruitment Consultant and was interviewed in Jul 2021. There was 1 interview round.
I have the necessary skills, experience, and passion to excel in this role.
I have a strong background in manufacturing engineering with a proven track record of success.
I am highly skilled in process optimization, cost reduction, and quality improvement.
I have experience in implementing lean manufacturing principles and driving continuous improvement initiatives.
I am a team player and have excellent communication and p...
I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 3 interview rounds.
based on 1 interview
Interview experience
Assistant Manager
116
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
67
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Sales Manager
46
salaries
| ₹0 L/yr - ₹0 L/yr |
Applications Engineer
41
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Design Engineer
29
salaries
| ₹0 L/yr - ₹0 L/yr |
Sandvik Asia
Kobe Steel
Sumitomo Electric Industries
Mitsubishi Materials