Filter interviews by
I applied via Job Fair and was interviewed before Aug 2023. There was 1 interview round.
The new part approval process involves thorough evaluation and testing before implementation.
Establish clear criteria for approving new parts
Conduct thorough testing to ensure quality and compatibility
Involve cross-functional teams in the approval process
Document all steps and decisions made during the approval process
Top trending discussions
I applied via Approached by Company and was interviewed before Apr 2022. There were 2 interview rounds.
Bed coil leakages in AFBC boiler
Interlocks in a boiler turbine are safety mechanisms that prevent unsafe conditions and protect equipment.
Interlocks ensure proper sequencing of operations in the boiler turbine
They prevent unsafe conditions such as overpressure, low water level, or flame failure
Examples of interlocks include low water level shutdown, high steam pressure trip, and flame failure detection
Interlocks help protect equipment from damage and
posted on 27 Aug 2023
I applied via Recruitment Consulltant and was interviewed in Jul 2023. There were 3 interview rounds.
As on production planning control
Implementing lean manufacturing principles, optimizing production processes, and reducing material waste can help save company wastage.
Implement lean manufacturing principles to reduce waste in production processes
Optimize production schedules to minimize downtime and maximize efficiency
Reduce material waste by implementing recycling and reusing strategies
Regularly review and analyze production data to identify areas o...
posted on 10 Feb 2023
I applied via Approached by Company and was interviewed in Aug 2022. There were 2 interview rounds.
The code of fabrication and installation involves a sequence of steps from fabrication to dispatch and erection at the site.
The code of fabrication and installation outlines the standards and procedures for the entire process.
The fabrication sequence involves cutting, welding, and assembling the components according to the design specifications.
The final dispatch involves packaging and transportation of the fabricated ...
I was interviewed before Feb 2023.
I applied via Approached by Company and was interviewed before Apr 2022. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Mar 2023. There was 1 interview round.
posted on 26 Jun 2021
Design Engineer
9
salaries
| ₹2 L/yr - ₹6.8 L/yr |
Quality Engineer
8
salaries
| ₹2.6 L/yr - ₹4.2 L/yr |
Quality Assurance
5
salaries
| ₹3 L/yr - ₹6.5 L/yr |
Senior Quality Engineer
4
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Purchase Engineer
4
salaries
| ₹3.8 L/yr - ₹7.5 L/yr |
Bharat Forge
Samvardhana Motherson Group
Sundaram Clayton
Rane Group