Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by KEC International Team. If you also belong to the team, you can get access from here

KEC International Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

KEC International Analyst Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. What is the procedure for the welding of different materials
  • Ans. 

    The procedure for welding different materials involves selecting the appropriate welding method, preparing the materials, and ensuring proper joint design and welding parameters.

    • Identify the materials to be welded and determine the compatibility of their properties.

    • Select the appropriate welding method based on the materials and desired joint strength.

    • Prepare the materials by cleaning, removing any contaminants, and en...

  • Answered by AI

I applied via Other and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Pure technical questions are asked.
  • Q2. Power transmission in transit mixer & operation of batching plant.
  • Ans. 

    Power transmission & operation of batching plant in transit mixer is crucial for efficient concrete mixing.

    • Power transmission in transit mixer is done through a hydraulic motor which is connected to the mixer drum.

    • The batching plant is responsible for mixing the ingredients in the right proportion and delivering it to the transit mixer.

    • The operation of the batching plant involves loading the ingredients into the hopper...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Clear about basic concepts & technical specifications of equipment

Interview Questionnaire 

1 Question

  • Q1. Tell us about your self

Interview Preparation Tips

Interview preparation tips for other job seekers - It was average not hard and not easy
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. What was your experience like during the one-on-one interview with HR?
  • Ans. 

    The one-on-one interview with HR was professional and informative.

    • The HR representative was friendly and welcoming

    • The questions asked were relevant to the position and my experience

    • I was given a clear overview of the company culture and expectations

  • Answered by AI
  • Q2. What types of questions will the manager ask?
Round 2 - One-on-one 

(2 Questions)

  • Q1. Can you explain your previous work experience?
  • Ans. 

    I have 5 years of experience as a financial analyst at a Fortune 500 company.

    • Analyzed financial data to provide insights and recommendations

    • Created financial models to forecast future performance

    • Prepared reports for senior management

    • Collaborated with cross-functional teams on budgeting and forecasting

    • Identified cost-saving opportunities and efficiency improvements

  • Answered by AI
  • Q2. Salary negotiable

Interview Preparation Tips

Interview preparation tips for other job seekers - Married women with kid should not join this company

I applied via Naukri.com and was interviewed in Apr 2021. There were 6 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. The questions are all subjective relating to finance
  • Q2. How to raise funding and how to control on spending
  • Ans. 

    To raise funding, create a solid business plan and pitch to investors. To control spending, set a budget and track expenses.

    • Create a detailed business plan that outlines your goals, strategies, and financial projections.

    • Identify potential investors and pitch your business plan to them.

    • Consider alternative funding sources such as crowdfunding or small business loans.

    • Set a budget and track all expenses to ensure you are ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be specific and accurate about your knowledge on the fields you are already worked and keep updated with the areas of the field in which you are working

Manager Interview Questions & Answers

Tata Projects user image Niteenkumar Belkoniker

posted on 24 May 2024

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Background and qualifications
Round 2 - Technical 

(1 Question)

  • Q1. About experience
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Technical questions about Civil Engineering
  • Q2. HR round was tough and grinding

I applied via Recruitment Consulltant and was interviewed in Apr 2021. There were 2 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Basic questions about whatever learned from experience.
  • Q2. Welders progress daily progress rate
  • Ans. 

    The daily progress rate of welders varies based on factors such as experience, type of welding, and complexity of the project.

    • Welders with more experience tend to have a higher daily progress rate.

    • The type of welding being done can also affect the daily progress rate. For example, TIG welding may take longer than MIG welding.

    • The complexity of the project can also impact the daily progress rate. A simple welding project...

  • Answered by AI
  • Q3. Overall project delays , Constraint.
  • Ans. 

    Project delays can be caused by various constraints.

    • Project delays can be caused by resource constraints such as lack of manpower or budget constraints.

    • Technical constraints such as unexpected technical issues or changes in requirements can also cause delays.

    • External constraints such as weather conditions or delays in receiving materials can also impact project timelines.

    • Effective project management can help mitigate t

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Tata Projects Manager interview:
  • Mechanical construction
  • Piping Engineering
  • Project Management
  • Progress
  • Day activity
  • Performance Management
Interview preparation tips for other job seekers - Always be with the job and task as learn everyday some thing
before go out of site.

I applied via Recruitment Consultant and was interviewed in May 2019. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. What are the standards used for plant layout in refineries
  • Ans. 

    Standards for plant layout in refineries ensure safety, efficiency, and compliance with regulations.

    • Plant layout should prioritize safety and minimize the risk of accidents.

    • Efficiency is also important, with consideration given to the flow of materials and equipment.

    • Regulations and industry standards must be followed, such as those set by OSHA and API.

    • Examples of layout considerations include spacing between equipment,...

  • Answered by AI
  • Q2. What is the frequency on visiting Vendor Shops for expediting
  • Ans. 

    The frequency of visiting vendor shops for expediting depends on various factors such as project timelines, vendor reliability, and urgency of the situation.

    • The frequency of visiting vendor shops for expediting can vary from daily visits to weekly or monthly visits.

    • It depends on the project timelines and the urgency of the situation. If a project is running behind schedule, more frequent visits may be required to ensur...

  • Answered by AI
  • Q3. Have You worked in CDU-VDU unit?
  • Q4. What is DCU?
  • Ans. 

    DCU stands for Dublin City University, a university located in Dublin, Ireland.

    • DCU was established in 1980 and has over 17,000 students.

    • It offers a wide range of undergraduate and postgraduate courses in various fields such as business, engineering, science, arts, and humanities.

    • DCU is known for its innovative approach to education and research, and has partnerships with many leading companies and institutions.

    • Some not...

  • Answered by AI
  • Q5. Why it is called delayed?
  • Ans. 

    Delayed is called so because it refers to something that is postponed or occurs after the expected time.

    • The term 'delayed' is used to describe situations where there is a time lag or postponement.

    • It implies that something is not happening immediately or as scheduled.

    • Delays can occur due to various reasons such as technical issues, logistical problems, or unforeseen circumstances.

    • For example, a delayed flight refers to ...

  • Answered by AI
  • Q6. What happens at CDU-VDU?

Interview Preparation Tips

Interview preparation tips for other job seekers - Only one technical interview and final negotiation with HR

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Normal HR related questions.
Round 2 - Technical 

(1 Question)

  • Q1. Technical details of the past projects completed.

Interview Preparation Tips

Interview preparation tips for other job seekers - Better to focus on details of past project completed.

KEC International Interview FAQs

How to prepare for KEC International Analyst interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at KEC International. The most common topics and skills that interviewers at KEC International expect are Budgeting, Cost Control, Financial Control, MIS and Project Funding.

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 757 Interviews
Tata Projects Interview Questions
4.2
 • 450 Interviews
Dilip Buildcon Interview Questions
4.0
 • 146 Interviews
G R Infraprojects Interview Questions
4.1
 • 134 Interviews
AtkinsRealis Interview Questions
3.9
 • 88 Interviews
GMR Group Interview Questions
4.0
 • 84 Interviews
View all
Assistant Manager
658 salaries
unlock blur

₹5.2 L/yr - ₹21.2 L/yr

Senior Engineer
444 salaries
unlock blur

₹4.7 L/yr - ₹14 L/yr

Civil Engineer
221 salaries
unlock blur

₹2.4 L/yr - ₹9 L/yr

Safety Officer
191 salaries
unlock blur

₹1.8 L/yr - ₹8 L/yr

Project Manager
186 salaries
unlock blur

₹9.5 L/yr - ₹40.5 L/yr

Explore more salaries
Compare KEC International with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview