Filter interviews by
I applied via Naukri.com and was interviewed before Nov 2020. There were 3 interview rounds.
Top trending discussions
I applied via Referral and was interviewed in Mar 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Mar 2022. There were 3 interview rounds.
Listing WBS in MSP
Making MSP model
I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jun 2022. There was 1 interview round.
I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.
The joining period and percentage of salary hike are important factors to consider when accepting a new job offer.
The joining period should be negotiated based on the candidate's current commitments and the urgency of the role.
The percentage of salary hike should be competitive with industry standards and reflective of the candidate's experience and skills.
It is important to consider the overall compensation package, i...
Density of common construction materials varies, with cement around 1440 kg/m3, steel around 7850 kg/m3, fine aggregate around 1600-1750 kg/m3, and coarse aggregate around 1200-1750 kg/m3.
Cement density: 1440 kg/m3
Steel density: 7850 kg/m3
Fine aggregate density: 1600-1750 kg/m3
Coarse aggregate density: 1200-1750 kg/m3
The weight of the cube used to check the strength of concrete is typically 15 cm x 15 cm x 15 cm and weighs around 29 kg.
Standard size of cube for testing concrete strength is 15 cm x 15 cm x 15 cm
Weight of the cube is usually around 29 kg
The cube is made of concrete from the same batch being tested
The ratio of cement mortar for outer and inner wall plastering varies depending on the type of wall and desired finish.
The ratio of cement mortar for outer wall plastering is usually 1:4 (1 part cement to 4 parts sand).
The ratio of cement mortar for inner wall plastering is typically 1:6 (1 part cement to 6 parts sand).
However, the ratio can vary based on factors such as the type of wall surface, desired finish, and lo...
My goal is to become a proficient Site Engineer by gaining experience, knowledge, and skills in the field.
Continuously seek opportunities to learn and improve technical skills
Work on various projects to gain practical experience
Seek mentorship from experienced engineers
Stay updated with industry trends and technologies
Obtain relevant certifications to enhance credibility
Set specific career milestones to track progress
I envision myself as a Senior Site Engineer leading projects and mentoring junior engineers.
Leading and managing multiple projects simultaneously
Mentoring and training junior engineers
Implementing innovative technologies and practices
Collaborating with cross-functional teams for successful project delivery
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
The painting quantity and type of paint depend on the project requirements and specifications.
The painting quantity is determined by the surface area to be painted and the number of coats required.
The type of paint depends on factors such as the surface material, desired finish, and environmental conditions.
Common types of paint include acrylic, latex, oil-based, and epoxy paints.
The quantity and type of paint may vary...
Bar bending schedule is a document that provides details about the reinforcement steel bars used in a construction project.
Bar bending schedule (BBS) is prepared by a structural engineer or a detailer.
It includes information about the size, shape, and quantity of reinforcement bars required for each structural element.
BBS helps in estimating the amount of steel required, ordering materials, and ensuring proper placemen...
Block work quantity can be calculated by measuring the dimensions of the blocks and the area to be covered.
Measure the length, width, and height of the blocks
Calculate the volume of each block by multiplying the length, width, and height
Determine the area to be covered by measuring the length and height of the wall
Divide the area by the volume of each block to get the quantity needed
Consider adding extra blocks for was
I will sell property by highlighting its unique features and benefits, and by creating a sense of urgency in potential buyers.
Identify the unique selling points of the property
Highlight the benefits of owning the property
Create a sense of urgency in potential buyers
Use effective marketing strategies to reach a wider audience
Provide excellent customer service to potential buyers
Negotiate effectively with potential buyer
based on 1 review
Rating in categories
Assistant Manager
43
salaries
| ₹5.7 L/yr - ₹14 L/yr |
Senior Project Engineer
17
salaries
| ₹5.3 L/yr - ₹8.6 L/yr |
Senior Manager
9
salaries
| ₹10 L/yr - ₹19.8 L/yr |
Senior Executive
8
salaries
| ₹4.9 L/yr - ₹6.4 L/yr |
Senior Engineer
7
salaries
| ₹5.5 L/yr - ₹9 L/yr |
Realty Assistant
Kunal Structure
Omkar Realtors and Developers Group
HM Group