user image Manohar Jadli

posted on 16 May 2018

I applied via Approached by Company and was interviewed before May 2017. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Question relating to my previous companies work experiences were asked.
  • Q2. How would one start processing an order for a Machinery manufacturing ?
  • Ans. 

    To start processing an order for machinery manufacturing, one must follow a series of steps.

    • Review the order details and specifications

    • Check the availability of raw materials and components

    • Create a production plan and schedule

    • Assign tasks to the production team

    • Procure any necessary additional materials

    • Start the manufacturing process

    • Perform quality checks at various stages

    • Assemble and test the machinery

    • Package and prepa...

  • Answered by AI

Interview Preparation Tips

General Tips: My vast experience helped me get this job. Besides the company needed a person badly to manage manufacturing. This position was vacant for a long long time. seems no one was willing to join Kambert.
Seems all candidates were well updated on M/s. Kambert Mcy status and terrible work conditions.
I was requested to maintain long term association with Kambert.
Mt advice to job seekers is ......never ever join this Organization. This is a terribly managed, No Vision mgt organization.
Joining Kambert would mean a definite 100% end to your career plans & growth.
You become worthless and loose all your skills very soon ....Do not ever think of trying this environment.
A big bad experience of my life. This experience of 2 Years with Kambert has ruined my life despite all the hard work and improvements given to the organisation over these 2 years.
Skills: Communication, Presentation Skills, Decision Making Skills
Duration: <1 week

Production Manager Interview Questions asked at other Companies

Q1. Production, Maintenance, Quality and Safety. Out of four, tell me the most important and least important thing for you and why?
View answer (10)

Interview questions from similar companies

Shift Incharge Interview Questions & Answers

Thermax Limited user image Kunal Chhatthuprasad Chauhan

posted on 10 Feb 2025

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Aug 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. Boiler Related questions such as efficiency, Maintenance schedule, Chemicals used in boiler water and O&M
  • Q2. Compressor Maintenance and operation related. Parameters readings.
Round 2 - One-on-one 

(2 Questions)

  • Q1. Technical,Manpower Handling and safety rules.
  • Q2. Shift Scheduling, Report Making and sending to higher authorities.

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical knowledge is must but lost probable what you have mentioned in your resume, you must know them very well.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What processes are you involved in at your company?
  • Q2. How do you manage your workload when faced with a large volume of tasks?
Round 2 - HR 

(1 Question)

  • Q1. What are your salary expectations for this position?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. What are the dimensions of a standard brick?
  • Q2. What is the water-cement ratio?
  • Q3. What is the heat of hydration?
  • Q4. What is curing?
  • Q5. What is footing and foundation?
  • Q6. What is one way slab and two way slab?

Interview Preparation Tips

Topics to prepare for Kirloskar Brothers Civil Site Engineer interview:
  • Hr Fresher
Interview preparation tips for other job seekers - Civil engineering is a significant contribution that is essential for our lives.
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
No response
Round 1 - HR 

(3 Questions)

  • Q1. Telle about yourself
  • Q2. Please tell us end to end process your handling in current company
  • Q3. Why you want to join our company
Round 2 - One-on-one 

(1 Question)

  • Q1. Again same questions
Round 3 - One-on-one 

(1 Question)

  • Q1. Many questions related to my profile

Interview Preparation Tips

Interview preparation tips for other job seekers - Most of the time they are ask you to come down to company & give interviews..for every round they are taking on different day. After completing all rounds alost 2-3 months no mail no message....I had to ask them about feedback so many times then at last got confirmation that position is on hold.
Interview experience
3
Average
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - Assignment 

My degree and
Degree related question

Round 2 - HR 

(1 Question)

  • Q1. Self intro CV checking
Round 3 - One-on-one 

(3 Questions)

  • Q1. Self introduction family background
  • Q2. Degree related question cat industry question
  • Q3. Company related question

Interview Preparation Tips

Interview preparation tips for other job seekers - Safety work safety quality best quality learning system learning
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Dec 2024. There were 2 interview rounds.

Round 1 - Technical 

(5 Questions)

  • Q1. What is the process for installing solar panels, and what are the methods to test their functionality?
  • Q2. How much type quality test in solar system
  • Q3. Installation teat
  • Q4. Trench dept test
  • Q5. Sand bedding test
Round 2 - Case Study 

Diploma in electrical engineering

Interview Preparation Tips

Interview preparation tips for other job seekers - Ensure work quality according to the specifications in the drawing while maintaining effective cost control.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I was interviewed before Feb 2024.

Round 1 - Case Study 

12 th paas . but no diploma only experience

Round 2 - Technical 

(2 Questions)

  • Q1. My work wood technical
  • Q2. Main bahut imandar hu main woodpeter maker ke kam ko bahut acche lagn se kam karta hun
Round 3 - Technical 

(1 Question)

  • Q1. My work technical

Interview Preparation Tips

Interview preparation tips for other job seekers - For job. wood pattern maker. 13 years experience. 12 th paas *****
ph. XXXXX district Saharanpur state Uttar Pradesh .my work center fugal pump impeller rotary walv jaw plate barring hosing etc with corbox
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Kone instlater (TA) mod job
  • Q2. I m intrest in job work exprance is Abal abal
  • Q3. Thes is a smart elavoter and the way safety from clound
  • Q4. I m 5 year exprance and I plajer my work
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - HR 

(2 Questions)

  • Q1. Relevant questions from stream
  • Q2. Question from your resume
Round 2 - One-on-one 

(2 Questions)

  • Q1. Interaction with Head of Department,they ask few questions and also try to know about your knowledge and availability.
  • Q2. Test your technical skills

Tell us how to improve this page.

Interview Questions from Similar Companies

Thermax Limited Interview Questions
4.2
 • 243 Interviews
Cummins Interview Questions
4.3
 • 230 Interviews
John Deere Interview Questions
4.1
 • 227 Interviews
Caterpillar Inc Interview Questions
4.2
 • 178 Interviews
KONE Interview Questions
4.2
 • 100 Interviews
Hitachi Interview Questions
4.0
 • 82 Interviews
Atlas Copco Interview Questions
4.2
 • 78 Interviews
View all

Kambert Machinery Reviews and Ratings

based on 6 reviews

2.9/5

Rating in categories

1.2

Skill development

2.9

Work-life balance

2.1

Salary

2.8

Job security

2.0

Company culture

2.0

Promotions

2.9

Work satisfaction

Explore 6 Reviews and Ratings
Sales & Service Executive
4 salaries
unlock blur

₹3.6 L/yr - ₹5.8 L/yr

Production & Planning Engineer
4 salaries
unlock blur

₹2.2 L/yr - ₹4.3 L/yr

Production Planner
3 salaries
unlock blur

₹2 L/yr - ₹3.5 L/yr

Production Planning Control Engineer
3 salaries
unlock blur

₹7 L/yr - ₹7 L/yr

Explore more salaries
Compare Kambert Machinery with

John Deere

4.1
Compare

Thermax Limited

4.2
Compare

Cummins

4.3
Compare

Tractors and Farm Equipment

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview