I applied via Walk-in and was interviewed before Mar 2022. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Aug 2024. There was 1 interview round.
Hydrostatic testing is a common method used to test the integrity of DI and HDPE pipes by pressurizing them with water.
Hydrostatic testing involves filling the pipe with water and pressurizing it to a specified level to check for leaks or weaknesses.
DI (Ductile Iron) pipes are typically tested at 1.5 times their working pressure, while HDPE (High-Density Polyethylene) pipes are tested at 1.25 times their working pressu...
Top trending discussions
posted on 11 Feb 2025
I was interviewed in Aug 2024.
I applied via Recruitment Consulltant and was interviewed in Jul 2024. There was 1 interview round.
To ensure successful delivery from project conception to execution, I would focus on clear communication, detailed planning, proactive problem-solving, and regular monitoring.
Establish clear project goals and objectives
Create a detailed project plan with timelines and milestones
Regularly communicate with stakeholders to ensure alignment and address any issues
Proactively identify and address potential risks and challeng...
I have over 5 years of technical experience in project management, construction, and engineering design.
Managed multiple construction projects from initiation to completion
Proficient in AutoCAD and other design software
Experience in creating project schedules and budgets
Knowledge of construction materials and methods
Collaborated with cross-functional teams to ensure project success
posted on 8 Jul 2024
Pump head is calculated by adding the static head, friction head, and velocity head.
Calculate the static head by measuring the vertical distance between the pump centerline and the highest point of the system.
Calculate the friction head by considering the pipe length, diameter, roughness, and flow rate.
Calculate the velocity head by using the formula: V^2 / (2g), where V is the velocity of the fluid and g is the accele...
To operate the fire alarm system, follow these steps: activate the alarm, evacuate the building, and wait for emergency responders.
Activate the fire alarm by pulling the nearest alarm pull station or pressing the alarm button.
Evacuate the building immediately using the nearest exit and do not use elevators.
Wait for emergency responders to arrive and provide them with any relevant information about the situation.
posted on 10 Jun 2024
Easy , kust want consistency and willingness to trelocate far off places
I would ensure proper planning, communication, and use of technology to effectively manage work in remote locations.
Establish clear communication channels with team members and stakeholders
Utilize project management tools for tracking progress and deadlines
Implement regular check-ins and updates to ensure everyone is on the same page
Consider logistics and transportation challenges when planning work schedules
Leverage t...
I applied via Job Portal and was interviewed in Nov 2021. There were 3 interview rounds.
The amount of miller required for transporting 500 cum concrete depends on various factors.
The type of miller being used
The distance the concrete needs to be transported
The size of the project
The time frame for completing the project
The availability of resources
The budget allocated for the project
posted on 25 May 2022
I applied via Walk-in and was interviewed before May 2021. There were 3 interview rounds.
based on 3 interviews
Interview experience
based on 38 reviews
Rating in categories
Deputy Manager
568
salaries
| ₹5 L/yr - ₹17.3 L/yr |
Senior Engineer
552
salaries
| ₹3.4 L/yr - ₹10.6 L/yr |
Assistant Manager
542
salaries
| ₹3.8 L/yr - ₹16 L/yr |
Civil Engineer
252
salaries
| ₹2 L/yr - ₹7.5 L/yr |
Manager
243
salaries
| ₹6.2 L/yr - ₹24 L/yr |
Sterlite Power
Adani Transmission
Power Grid Corporation of India
Tata Power