I applied via Referral and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Details asked about current working company, location, designation, work experience, nature of work, team handling capacity, expected CTC and required work location.
Round 2 - Technical 

(1 Question)

  • Q1. Details asked about previous work experience, nature of project handled, scope of work, technical details in Water treatment plant, intake, elevated reservoirs. Rate analysis, some typical rates for constr...

Interview Preparation Tips

Interview preparation tips for other job seekers - Very nice company with discipline. You love to work in this company as it's having its unique values.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Basic and regular questions customary to the department
  • Q2. Customary and basic level questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and convey your knowledge and skill very briefly to show what you bring to the table

I applied via Approached by Company and was interviewed before Nov 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Basics about your past experience and metro related questions.
  • Q2. Metro related questions.
  • Q3. Tell me about yourself.?
  • Q4. EXPLAIN THE PILE TIME CYCLE?
  • Ans. 

    The pile time cycle is the time taken to complete a single pile driving operation.

    • It involves the driving of a pile into the ground using a pile driver.

    • The cycle includes lifting the hammer, dropping it onto the pile, and raising it again.

    • Factors affecting the cycle include the size and weight of the hammer, soil conditions, and the length of the pile.

    • The cycle time can be reduced by using a hydraulic hammer or pre-aug...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Mainly designation and salary related.

Interview Preparation Tips

Topics to prepare for KEC International Manager interview:
  • Just past experience
Interview preparation tips for other job seekers - All the very best . It is growing infra company . So experience is more important

I applied via Other and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About your work profile, previous experiences, learnings and mitigations, technical assessments...etc

Interview Preparation Tips

Interview preparation tips for other job seekers - I have one very specific advice to everyone. Be honest to your self while facing the interviewer. Never ever try to bluff because someone who is sitting in front of you carries more experiences.

The expertise you carry should reflect in your resume. Hence your Cv should be your reflection with detailed but not lengthy info.

Sometimes you crack it sometimes you don't, but everytime you come out more prepared and more confident. Because interview always teaches you about your strengths and area of improvement.

Manager Interview Questions & Answers

KEC International user image MuthuKumar Lakshmanan

posted on 14 Dec 2021

I applied via Recruitment Consultant and was interviewed before Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load calculation of Transformer
  • Ans. 

    Load calculation of Transformer

    • Load calculation involves determining the amount of power required by the load

    • Transformer rating should be higher than the calculated load

    • Load calculation takes into account factors such as power factor, efficiency, and voltage regulation

    • Formula for load calculation: Load (kVA) = Voltage (V) x Current (A) x Power Factor

    • Example: If the load is 100 kW with a power factor of 0.8 and a voltag...

  • Answered by AI
  • Q2. Voltage Drop calculation

Interview Preparation Tips

Interview preparation tips for other job seekers - Good. Learned good exposure from interview panel

I applied via Approached by Company and was interviewed before Aug 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. El Signalling system working
  • Ans. 

    The El Signalling system is a railway signalling system used in Europe.

    • The system uses a combination of track circuits and signals to control train movements.

    • It was first introduced in the early 20th century and has since been updated and modernized.

    • The system is used in countries such as France, Spain, and Italy.

    • It allows for efficient and safe train operations on busy railway lines.

    • The system has faced some criticism

  • Answered by AI
  • Q2. Telecom system in Indian railways
  • Ans. 

    Indian Railways has a modern telecom system for efficient communication and safety.

    • Telecom system includes GSM-R, Wi-Fi, and CCTV surveillance.

    • GSM-R enables communication between train drivers and control centers.

    • Wi-Fi is available for passengers in select trains and stations.

    • CCTV surveillance ensures safety and security of passengers and railway property.

    • Indian Railways is also implementing a Train Collision Avoidance

  • Answered by AI

Interview Preparation Tips

Topics to prepare for KEC International Manager interview:
  • Signalling
Interview preparation tips for other job seekers - Positive attitude, domain knowledge, HR,

I applied via Recruitment Consultant and was interviewed in Oct 2019. There were 5 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. 1.Techinical questions about bridge construction,prestressed,cantilever,concrete,SAP,shuttering
  • Q2. 2.Site planning
  • Q3. 3. Why we hire you

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was technical & for manager role this is OK

Kalpataru Projects International Interview FAQs

How many rounds are there in Kalpataru Projects International Manager interview?
Kalpataru Projects International interview process usually has 2 rounds. The most common rounds in the Kalpataru Projects International interview process are HR and Technical.
How to prepare for Kalpataru Projects International Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Kalpataru Projects International. The most common topics and skills that interviewers at Kalpataru Projects International expect are Cost Control, Project Management, Cash Flow, MS Project and Project Planning.

Tell us how to improve this page.

Kalpataru Projects International Manager Salary
based on 285 salaries
₹6.2 L/yr - ₹24 L/yr
8% less than the average Manager Salary in India
View more details

Kalpataru Projects International Manager Reviews and Ratings

based on 68 reviews

4.1/5

Rating in categories

3.7

Skill development

3.7

Work-life balance

3.7

Salary

4.0

Job security

3.7

Company culture

3.4

Promotions

3.5

Work satisfaction

Explore 68 Reviews and Ratings
Deputy Manager
599 salaries
unlock blur

₹5.1 L/yr - ₹17.1 L/yr

Senior Engineer
553 salaries
unlock blur

₹3.4 L/yr - ₹10.6 L/yr

Assistant Manager
534 salaries
unlock blur

₹3.8 L/yr - ₹14 L/yr

Manager
285 salaries
unlock blur

₹6.2 L/yr - ₹24 L/yr

Civil Engineer
252 salaries
unlock blur

₹2 L/yr - ₹7.5 L/yr

Explore more salaries
Compare Kalpataru Projects International with

Sterlite Power

4.0
Compare

Adani Transmission

3.7
Compare

Power Grid Corporation of India

4.4
Compare

Tata Power

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview