Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by JM Aluminium Team. If you also belong to the team, you can get access from here

JM Aluminium Verified Tick

Compare button icon Compare button icon Compare
4.5

based on 28 Reviews

Filter interviews by

JM Aluminium Electrical Engineer Interview Questions and Answers

Updated 20 Aug 2024

JM Aluminium Electrical Engineer Interview Experiences

1 interview found

Electrical Engineer Interview Questions & Answers

user image Sanket Musmade

posted on 20 Aug 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Plc deep Knowledge
  • Q2. Overall electrical

Interview questions from similar companies

I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Theynasked about previous experience
  • Q2. Basic question about panel installation, cable tray work, cable laying, Glanding and termination, earthing system

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare what you mentined in resume.
Question all based of your resume.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(7 Questions)

  • Q1. What is the process of earthing?
  • Ans. 

    Earthing is the process of connecting electrical equipment or installations to the earth to prevent electric shock and protect against electrical faults.

    • Earthing involves creating a connection between the electrical system and the earth.

    • It is done by burying a metal conductor, such as a copper rod, in the ground.

    • The metal conductor is connected to the electrical system using a wire or cable.

    • Earthing provides a path for...

  • Answered by AI
  • Q2. Which type of DGs used at your Site
  • Ans. 

    The type of DGs used at our site are diesel generators.

    • Diesel generators are commonly used as backup power sources in various industries.

    • They are reliable and can provide a continuous power supply during electrical outages.

    • DGs are often used in remote locations or areas with unreliable grid power.

    • They require regular maintenance and fuel supply to operate efficiently.

    • Examples of DGs used at our site include Cummins, Ca

  • Answered by AI
  • Q3. What is the difference between LT and HT line?
  • Ans. 

    LT line refers to Low Tension line while HT line refers to High Tension line.

    • LT line carries low voltage and is used for domestic and small-scale commercial purposes.

    • HT line carries high voltage and is used for industrial and large-scale commercial purposes.

    • LT line voltage is typically up to 440 volts, while HT line voltage is above 440 volts.

    • LT lines are usually overhead lines, while HT lines can be both overhead and ...

  • Answered by AI
  • Q4. Which type of Circuit Breakers you used at Site?
  • Ans. 

    We used different types of circuit breakers at the site depending on the specific requirements.

    • We used air circuit breakers (ACBs) for low voltage applications.

    • For medium voltage applications, we used vacuum circuit breakers (VCBs) or oil circuit breakers (OCBs).

    • In high voltage installations, we used sulfur hexafluoride (SF6) circuit breakers.

    • For specialized applications like generator protection, we used differential ...

  • Answered by AI
  • Q5. How big transformers you used at site
  • Ans. 

    The size of transformers used at the site varied depending on the specific requirements of the project.

    • Transformers used at the site were of different sizes based on the power demand of the electrical system.

    • For smaller projects, transformers with a capacity of around 100 kVA were used.

    • For medium-sized projects, transformers with a capacity ranging from 250 kVA to 500 kVA were used.

    • For larger projects, transformers wit...

  • Answered by AI
  • Q6. Which type of Batching Plant you used at Site
  • Ans. 

    We used a stationary type batching plant at the site.

    • We used a stationary type batching plant for our construction project.

    • The stationary batching plant had a higher production capacity compared to mobile plants.

    • It was equipped with multiple storage bins for different types of aggregates.

    • The plant had a conveyor belt system to transfer the aggregates to the mixer.

    • We used this type of batching plant because it provided

  • Answered by AI
  • Q7. At which project you are working

Interview Preparation Tips

Interview preparation tips for other job seekers - It dipends on the interviewer which type of questions he will ask.
But one thing important be confident while interview
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Questions about Transformer, motors,plc and starters and power factor etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and and give proper answer if you know. Be prepared for interviews.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About yourself, how many years are you experienced, about salary and other general questions.
Round 3 - Technical 

(2 Questions)

  • Q1. It's depend on experience and post where we applied.
  • Q2. About your past experience nothing more.

Interview Preparation Tips

Interview preparation tips for other job seekers - They paid high salary if you are coming from MNC and other reputed company this will your weak point and fell down.

I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Theynasked about previous experience
  • Q2. Basic question about panel installation, cable tray work, cable laying, Glanding and termination, earthing system

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare what you mentined in resume.
Question all based of your resume.

I applied via Recruitment Consultant and was interviewed in Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Electrical related

Interview Preparation Tips

Interview preparation tips for other job seekers - Cable gland tramination how cable maggring panels related drawings asked electrical equipment installation

JM Aluminium Interview FAQs

How many rounds are there in JM Aluminium Electrical Engineer interview?
JM Aluminium interview process usually has 1 rounds. The most common rounds in the JM Aluminium interview process are Technical.
What are the top questions asked in JM Aluminium Electrical Engineer interview?

Some of the top questions asked at the JM Aluminium Electrical Engineer interview -

  1. Plc deep Knowle...read more
  2. Overall electri...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 JM Aluminium interview
Referral
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Vedanta Limited Interview Questions
3.8
 • 44 Interviews
Hindustan Zinc Interview Questions
3.9
 • 42 Interviews
J&F Interview Questions
3.8
 • 29 Interviews
Eversendai Interview Questions
3.9
 • 27 Interviews
J K Fenner Interview Questions
3.9
 • 26 Interviews
View all
VMC Machine Operator
3 salaries
unlock blur

₹4 L/yr - ₹4 L/yr

Explore more salaries
Compare JM Aluminium with

Hindalco Industries

4.2
Compare

Vedanta Limited

3.8
Compare

Nalco

4.1
Compare

Hindustan Zinc

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview