Filter interviews by
Our organization is a leading retail chain with over 100 stores nationwide.
We offer a wide range of products including clothing, electronics, and home goods.
Our focus is on providing excellent customer service and a seamless shopping experience.
We have a strong commitment to sustainability and ethical business practices.
Our company culture values teamwork, innovation, and continuous improvement.
We prioritize employee d...
Top trending discussions
I was interviewed before Jan 2024.
Community Immersion Round.
posted on 14 Sep 2024
I applied via Company Website and was interviewed in Aug 2024. There were 2 interview rounds.
Gear box replacement work
Before starting erection activities, it is important to check for safety hazards, proper equipment, and necessary permits.
Ensure all safety hazards are identified and addressed
Check that all necessary equipment is in working order
Verify that all required permits and approvals are obtained
Inspect the site for any potential obstacles or obstructions
The selection of a crane depends on factors such as weight capacity, reach, height, and terrain.
Consider the weight capacity of the crane to ensure it can lift the required loads.
Evaluate the reach and height of the crane to determine if it can access the work area effectively.
Take into account the terrain where the crane will be operating to choose the appropriate type (e.g. rough terrain crane, crawler crane).
Load angle factor is a term used in engineering to describe the angle at which a load is applied to a structure.
Load angle factor is important in determining the stress and strain on a structure.
It is typically calculated by taking the cosine of the angle at which the load is applied.
For example, if a load is applied at a 45 degree angle, the load angle factor would be cos(45) = 0.707.
Sling angle factor refers to the angle at which a sling is attached to a load, affecting the load's stability and the force exerted on the sling.
Sling angle factor is calculated by dividing the actual load weight by the weight of the load being lifted.
A smaller sling angle increases the force on the sling and decreases its capacity.
A larger sling angle reduces the force on the sling and increases its capacity.
Proper ca...
Safe load lifting percentage refers to the maximum weight a person can safely lift based on their capabilities.
Safe load lifting percentage is typically calculated as a percentage of a person's maximum lifting capacity.
Factors such as age, gender, fitness level, and previous injuries can affect safe load lifting percentage.
It is important for employees to be trained on proper lifting techniques to prevent injuries.
For ...
HIRA stands for Hazard Identification and Risk Assessment. It is a process used to identify potential hazards and analyze the associated risks in a workplace.
HIRA involves identifying hazards that could cause harm, assessing the risks associated with those hazards, and implementing control measures to mitigate the risks.
Examples of hazards include chemical exposure, machinery malfunctions, and ergonomic issues.
The goal...
MCB is a miniature circuit breaker, ELCB is an earth leakage circuit breaker, and RCCB is a residual current circuit breaker.
MCB is used to protect electrical circuits from overloads and short circuits.
ELCB is used to detect earth faults and disconnect the power supply to prevent electric shocks.
RCCB is used to detect residual current imbalances and disconnect the circuit to prevent electric shocks.
MCB and RCCB are com...
To check the Crane girder Camber, measurements can be taken using a straight edge or laser level.
Use a straight edge to measure the camber of the crane girder by placing it along the length of the girder and checking for any deviations from a straight line.
Alternatively, a laser level can be used to project a straight line along the length of the girder and measure any deviations from this line.
Regular inspections shou...
Luffing jib moves vertically to change the angle of the hook, while fly jib extends horizontally to increase reach.
Luffing jib is used to change the angle of the hook without moving the crane itself.
Fly jib extends horizontally to increase the reach of the crane.
Luffing jib moves vertically, while fly jib moves horizontally.
Luffing jib is commonly used in high-rise construction projects, while fly jib is used for reach...
posted on 5 Apr 2024
I applied via Campus Placement and was interviewed in Mar 2024. There were 4 interview rounds.
Aptitude + Core + Psychology Test
Trending topics , abstract topics, Anything.
I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.
Sheet piles are commonly used in damp and flood-prone areas to provide structural support and prevent water infiltration.
Sheet piles are driven into the ground to create a barrier against water seepage.
They are often made of steel or vinyl and are interlocked to form a continuous wall.
Sheet piles can be used in cofferdams, seawalls, and flood protection systems.
They are effective in preventing soil erosion and protecti...
Grade of concrete refers to the strength of the concrete mix design.
Grade of concrete is denoted by the ratio of cement to sand to aggregate.
Common grades of concrete include M10, M15, M20, etc.
Higher grade concrete has higher strength and durability.
For example, M20 concrete has a compressive strength of 20 MPa.
I applied via Approached by Company and was interviewed in Jun 2024. There were 3 interview rounds.
General questions related to job profile
MTTR stands for Mean Time To Repair and MTBF stands for Mean Time Between Failures.
MTTR is the average time taken to repair a failed component or system.
MTBF is the average time between failures of a component or system.
MTTR is calculated as total downtime divided by the number of failures.
MTBF is calculated as total uptime divided by the number of failures.
MTTR is usually measured in hours or minutes, while MTBF is me...
Balancing an impeller involves adjusting the weight distribution to minimize vibration and improve performance.
Identify the heavy spots on the impeller
Add or remove material to balance the impeller
Use a balancing machine to check the balance
Repeat the process until the impeller is properly balanced
I applied via Naukri.com and was interviewed in Nov 2023. There was 1 interview round.
posted on 27 Apr 2024
I was interviewed before Apr 2023.
Debate on multiple topics
Come out with a conclusion and solutions to a problem
based on 28 reviews
Rating in categories
Junior Engineer
1.2k
salaries
| ₹2.2 L/yr - ₹5.7 L/yr |
Associate Manager
1.1k
salaries
| ₹5.3 L/yr - ₹15.2 L/yr |
Executive Engineer
686
salaries
| ₹4 L/yr - ₹10.5 L/yr |
Assistant Engineer
627
salaries
| ₹3.2 L/yr - ₹7 L/yr |
Manager
405
salaries
| ₹8 L/yr - ₹23.2 L/yr |
Tata Steel
JSW Steel
Steel Authority Of India
ArcelorMittal Nippon Steel