I appeared for an interview in Feb 2022.

Round 1 - Technical 

(2 Questions)

  • Q1. What reason of pin hole in sanitary ware products.
  • Ans. 

    Pin holes in sanitary ware products can be caused by various reasons.

    • Presence of impurities in the raw materials used for manufacturing

    • Inadequate mixing of raw materials

    • Improper firing temperature or duration

    • Poor glaze quality

    • Inadequate cleaning of molds

    • Inadequate drying time

    • Inadequate pressure during casting

    • Presence of air bubbles in the casting material

    • Poor quality control measures

    • Environmental factors such as humidi

  • Answered by AI
  • Q2. Howmany typs of crack
  • Ans. 

    There are several types of cracks that can occur in materials.

    • Fatigue cracks

    • Corrosion cracks

    • Thermal fatigue cracks

    • Brittle cracks

    • Overload cracks

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - 1- line cerculation, slow presure
2-many typs of crack

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Process parameters
  • Q2. Manufacturing process cement
Round 3 - Technical 

(2 Questions)

  • Q1. CCR OPERATION in cement plant
  • Ans. 

    CCR operation in a cement plant involves monitoring and controlling the process parameters to ensure efficient production.

    • CCR stands for Central Control Room, where operators monitor and control the entire cement production process.

    • Operators in the CCR are responsible for adjusting process parameters such as kiln feed, fuel consumption, and raw material composition.

    • Efficient CCR operation is crucial for maintaining qua...

  • Answered by AI
  • Q2. Plant optimization in cement plant
  • Ans. 

    Plant optimization in cement plant involves improving efficiency, reducing costs, and maximizing output.

    • Implementing advanced process control systems to optimize production

    • Regularly monitoring equipment performance and conducting maintenance to prevent breakdowns

    • Utilizing alternative fuels and raw materials to reduce energy consumption

    • Optimizing the use of additives to improve cement quality and reduce clinker usage

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Nov 2024. There were 2 interview rounds.

Round 1 - Technical 

(5 Questions)

  • Q1. Manufacturing process
  • Q2. What is raw material
  • Ans. 

    Raw material is the basic material used in the production of goods.

    • Raw material is the primary substance or component used to manufacture products.

    • It can be natural resources like wood, metal, or minerals.

    • It can also be processed materials like chemicals or plastics.

    • Raw materials are transformed into finished products through manufacturing processes.

  • Answered by AI
  • Q3. What is clinker
  • Ans. 

    Clinker is a nodular material produced during the cement manufacturing process.

    • Clinker is a key ingredient in the production of cement.

    • It is formed by heating limestone, clay, and other materials in a kiln.

    • The cooled clinker is then ground into a fine powder to produce cement.

    • The quality of clinker greatly affects the quality of the final cement product.

  • Answered by AI
  • Q4. What is packing plant kapisity
  • Ans. 

    Packing plant capacity refers to the maximum amount of products that can be processed and packaged in a plant within a specific time frame.

    • Packing plant capacity is usually measured in units per hour or units per day.

    • It is important for production engineers to optimize the packing plant capacity to meet demand and maximize efficiency.

    • Factors that can affect packing plant capacity include equipment efficiency, productio

  • Answered by AI
  • Q5. What is coal mill kapisity
  • Ans. 

    Coal mill capacity refers to the maximum amount of coal that can be processed by the mill in a given time period.

    • Coal mill capacity is typically measured in tons per hour or tons per day.

    • It is important for production engineers to optimize coal mill capacity to meet production demands.

    • Factors affecting coal mill capacity include the type of coal, moisture content, and mill design.

    • Increasing coal mill capacity can invol...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. What is ball mill
  • Ans. 

    A ball mill is a type of grinder used to grind and blend materials for use in mineral dressing processes, paints, pyrotechnics, ceramics, and selective laser sintering.

    • Consists of a hollow cylindrical shell rotating about its axis

    • The axis of the shell may be horizontal or at a small angle to the horizontal

    • The grinding media is the balls, which may be made of steel, stainless steel, ceramic, or rubber

    • The inner surface o...

  • Answered by AI
  • Q2. What is raw mill
  • Ans. 

    Raw mill is a machine used in cement production to grind raw materials into a fine powder before being used in the kiln.

    • Raw mill is used in the cement industry to grind raw materials like limestone, clay, and iron ore into a fine powder.

    • The powdered raw materials are then blended and heated in a kiln to form clinker, which is the intermediate product in cement production.

    • Common types of raw mills include ball mills, ro...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Dalmia Bharat Cement Production Engineer interview:
  • Production Engineering
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. How you beneficial to our organisation ?
  • Q2. What is your previous company achievement?
Round 3 - HR 

(2 Questions)

  • Q1. Why you switch your current organisation?
  • Q2. What is your acceptance salary
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Basics about cement industry
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - Training 

(1 Question)

  • Q1. Good training provided and course designed as per plant requirements.
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jul 2022. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. About Kiln Operations
  • Q2. About VRM Operations
Round 2 - HR 

(2 Questions)

  • Q1. What's ur Expectations
  • Q2. When u will Join

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't Come to Dalmia,Ariyalur..When u Come u Will Feel Hard....Worst Management,Worst Work Culture
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Types of cement
  • Ans. 

    Types of cement include Portland cement, white cement, rapid hardening cement, and low heat cement.

    • Portland cement is the most common type used in construction

    • White cement is used for architectural purposes

    • Rapid hardening cement sets quickly

    • Low heat cement generates less heat during hydration

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Salary Negotiations

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Company but if you have to join then please wait till 2026.

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. What problem are faced during my career in previous company
  • Q2. Why i am will to change my present job after a longtime
  • Q3. How will i mange manpower

Interview Preparation Tips

Interview preparation tips for other job seekers - stick to your experince if anyone worked with dedication then they will crack interview

I appeared for an interview in Jun 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Technical and automation related question
  • Q2. Based on work related

Interview Preparation Tips

Interview preparation tips for other job seekers - Confidence, technical knowledge, and most important part is self interview .

Jaquar Interview FAQs

How many rounds are there in Jaquar Production Engineer interview for experienced candidates?
Jaquar interview process for experienced candidates usually has 1 rounds. The most common rounds in the Jaquar interview process for experienced candidates are Technical.
What are the top questions asked in Jaquar Production Engineer interview for experienced candidates?

Some of the top questions asked at the Jaquar Production Engineer interview for experienced candidates -

  1. What reason of pin hole in sanitary ware produc...read more
  2. Howmany typs of cr...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

ACC Interview Questions
3.9
 • 195 Interviews
Shree Cement Interview Questions
3.8
 • 160 Interviews
Infra.Market Interview Questions
4.2
 • 124 Interviews
JSW Cement Interview Questions
4.1
 • 105 Interviews
Nuvoco Vistas Interview Questions
4.1
 • 98 Interviews
Kohler Interview Questions
3.6
 • 56 Interviews
Wonder Cement Interview Questions
4.2
 • 50 Interviews
Ashirvad Pipes Interview Questions
4.0
 • 48 Interviews
View all
Jaquar Production Engineer Salary
based on 16 salaries
₹3.1 L/yr - ₹8.2 L/yr
57% more than the average Production Engineer Salary in India
View more details

Jaquar Production Engineer Reviews and Ratings

based on 3 reviews

3.8/5

Rating in categories

2.2

Skill development

2.9

Work-life balance

3.4

Salary

4.4

Job security

2.5

Company culture

3.0

Promotions

2.5

Work satisfaction

Explore 3 Reviews and Ratings
Area Sales Manager
442 salaries
unlock blur

₹5.5 L/yr - ₹14.6 L/yr

Assistant Manager
339 salaries
unlock blur

₹6 L/yr - ₹16.5 L/yr

Senior Officer
171 salaries
unlock blur

₹4.5 L/yr - ₹9.7 L/yr

Deputy Manager
156 salaries
unlock blur

₹8 L/yr - ₹20.2 L/yr

Area Service Incharge
86 salaries
unlock blur

₹4.1 L/yr - ₹9.5 L/yr

Explore more salaries
Compare Jaquar with

ACC

3.9
Compare

Shree Cement

3.8
Compare

Dalmia Bharat Cement

4.0
Compare

Nuvoco Vistas

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview