Filter interviews by
posted on 17 Dec 2019
I applied via Recruitment Consultant and was interviewed before Dec 2018. There were 5 interview rounds.
To increase first pass yield in polymer processing, focus on process optimization, quality control, and employee training.
Optimize process parameters such as temperature, pressure, and cooling rate
Implement quality control measures to detect and eliminate defects early in the process
Train employees on proper handling of equipment and materials
Regularly maintain and calibrate machinery to ensure consistent performance
An...
Top trending discussions
posted on 22 Dec 2020
I applied via Recruitment Consultant and was interviewed before Dec 2019. There were 3 interview rounds.
Refrigeration cycle is a process of removing heat from a space or substance and transferring it to another space or substance.
Refrigeration cycle is a thermodynamic cycle that involves the transfer of heat from a low-temperature region to a high-temperature region.
It consists of four main components: compressor, condenser, expansion valve, and evaporator.
The refrigerant is compressed by the compressor and then condense...
Assistant Manager
102
salaries
| ₹5 L/yr - ₹10.8 L/yr |
Senior Officer
57
salaries
| ₹4.3 L/yr - ₹8.5 L/yr |
Deputy Manager
44
salaries
| ₹8 L/yr - ₹14.5 L/yr |
Production Supervisor
36
salaries
| ₹1.2 L/yr - ₹5.1 L/yr |
Manager
30
salaries
| ₹12 L/yr - ₹22 L/yr |
PIX Transmissions
Gates
Continental Contitech
Rubber King Tyres