i
J&F
Filter interviews by
Clear (1)
I was interviewed in Jan 2022.
Top trending discussions
I applied via Job Portal and was interviewed before Jun 2020. There was 1 interview round.
I applied via Campus Placement and was interviewed before Aug 2022. There were 3 interview rounds.
Quantative aptitude /verbal and logical reasoning
I applied via Approached by Company and was interviewed before Jan 2023. There was 1 interview round.
I am highly skilled in draughting and 3D modelling.
I have extensive experience in using CAD software for draughting and 3D modelling.
I am proficient in creating detailed technical drawings and 3D models.
I have successfully completed several projects involving complex draughting and 3D modelling tasks.
I am knowledgeable about industry standards and best practices in draughting and 3D modelling.
I continuously update my s...
posted on 29 Aug 2024
I applied via Naukri.com
Technical questions about the Revit and MEP
Base plate design involves determining the size, thickness, and material of the plate to support the structural load.
Consider the load requirements and dimensions of the column being supported
Calculate the required thickness and size of the base plate based on the load
Select a suitable material for the base plate, such as steel or concrete
Ensure proper anchorage and connection details for the base plate
A base plate connection is a structural element used to connect a steel column to a concrete foundation.
Base plate connections are typically used in steel structures to transfer loads from the column to the foundation.
The base plate is usually welded to the bottom of the column and anchored to the concrete foundation using anchor bolts.
The base plate connection design must consider factors such as load transfer, bendin...
Dual case in finding R value in EQ refers to considering both the worst-case scenario and the best-case scenario.
Dual case involves analyzing the structure's response to both maximum and minimum loads.
It helps in determining the range of possible outcomes for the structure.
For example, in seismic design, dual case analysis considers both the maximum and minimum seismic forces that the structure may experience.
The amount of material used in cubic meters can be calculated by multiplying the length, width, and height of the object.
Calculate the volume of the object by multiplying the length, width, and height in meters.
The formula for calculating volume is: Volume = Length x Width x Height
For example, if a rectangular prism has dimensions of 2m x 3m x 4m, the volume would be 2m x 3m x 4m = 24 cubic meters.
based on 1 interview
Interview experience
based on 9 reviews
Rating in categories
Design Engineer
57
salaries
| ₹0 L/yr - ₹0 L/yr |
BIM Modeller
15
salaries
| ₹0 L/yr - ₹0 L/yr |
Tekla Modeller
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Structural Draftsman
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Quantity Surveyor
6
salaries
| ₹0 L/yr - ₹0 L/yr |
L&T Construction
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company