i
Uppteam
Filter interviews by
Basic question is ask in aptitude round
One topic is given in gd round there you have to speak at least 15 minutes
I applied via Job Fair and was interviewed in Mar 2022. There was 1 interview round.
Google Maps can be used in Civil 3D to import satellite imagery and terrain data.
Open Civil 3D and create a new drawing
Go to the 'Insert' tab and select 'Data Sources'
Select 'Add' and choose 'Google Maps'
Enter your Google account credentials and select the area you want to import
Adjust the settings and click 'Import'
The satellite imagery and terrain data will be added to your drawing
Top trending discussions
I was interviewed in Dec 2024.
posted on 21 Jan 2025
My current CTC is $80,000 per year.
My current CTC is $80,000 per year.
I am currently earning $80,000 annually.
My current salary is $80,000 per year.
posted on 26 Sep 2024
Measurement of job product is crucial for ensuring quality and accuracy in the bending shop.
Accurate measurement ensures precise bending of materials
Use of tools such as calipers, rulers, and protractors for measurement
Regular calibration of measurement tools to maintain accuracy
I applied via Recruitment Consulltant and was interviewed in Jun 2024. There was 1 interview round.
Safety is the state of being protected from harm, danger, or injury.
Safety involves identifying and minimizing risks in the workplace or environment.
It includes following safety protocols and procedures to prevent accidents.
Safety also involves providing proper training and equipment to ensure protection.
Examples: wearing personal protective equipment, following fire safety protocols, conducting safety inspections.
Risk assessment is the process of identifying, analyzing, and evaluating potential risks in order to determine the best course of action to minimize or eliminate them.
Identifying potential hazards and risks in the workplace or environment
Analyzing the likelihood and severity of each risk
Evaluating the level of risk and determining appropriate control measures
Implementing control measures to reduce or eliminate the iden...
Supply Chain Management (SCM) involves the coordination and management of all activities involved in sourcing, procurement, production, and logistics.
Involves planning, implementing, and controlling the flow of goods and services from point of origin to point of consumption
Includes activities such as sourcing raw materials, manufacturing products, and distributing finished goods
Focuses on optimizing processes to minimi...
A mock drill is a simulated emergency exercise conducted to test the preparedness and response of individuals and organizations.
Mock drills are conducted to practice emergency procedures without the actual risk or consequences.
They help identify strengths and weaknesses in emergency response plans.
Mock drills can involve scenarios like fire drills, earthquake drills, active shooter drills, etc.
Participants are expected...
An emergency plan is a set of procedures and guidelines to follow in case of a crisis or disaster.
Emergency plans outline specific actions to take during emergencies
They include evacuation procedures, communication protocols, and emergency contacts
Emergency plans are tailored to specific types of emergencies, such as fires, natural disasters, or medical emergencies
posted on 23 Sep 2024
I applied via Naukri.com and was interviewed in Aug 2024. There were 2 interview rounds.
Quantity surveying is a process of estimating the cost of construction projects by calculating the quantities of materials and labor required.
Quantity surveying involves measuring and estimating the quantities of materials, labor, and equipment needed for a construction project.
It also includes preparing cost estimates, budgets, and bills of quantities for the project.
Methods of quantity surveying include traditional m...
posted on 12 Sep 2024
BOQ specifications for interior fit out projects include detailed breakdown of materials, quantities, and costs.
BOQ (Bill of Quantities) should include detailed list of materials required for the project
Quantities of each material should be specified to ensure accurate costing
Costs should be broken down for each item to provide transparency in pricing
BOQ should be prepared based on the project design and specifications
...
I applied via Referral and was interviewed in Jul 2024. There were 2 interview rounds.
Electrical cad design
Architect
11
salaries
| ₹3.5 L/yr - ₹7 L/yr |
Mechanical Engg. Design
9
salaries
| ₹3.5 L/yr - ₹9 L/yr |
Electrical Design Engineer
7
salaries
| ₹2.6 L/yr - ₹5.9 L/yr |
Architectural Designer
6
salaries
| ₹3.3 L/yr - ₹7.5 L/yr |
BIM Modeller
5
salaries
| ₹3.6 L/yr - ₹5.8 L/yr |
Accenture
IBM
Deloitte
TCS