Filter interviews by
I appeared for an interview in Aug 2024.
BMS stands for Building Management System and SLD stands for Single Line Diagram.
BMS is a computer-based control system that manages and monitors a building's mechanical and electrical equipment.
SLD is a diagram that shows how electrical components are connected in a system.
BMS and SLD are important tools for efficient building operation and maintenance.
Top trending discussions
I applied via Referral and was interviewed before Nov 2020. There was 1 interview round.
BMS system stands for Building Management System. It is a computer-based control system that monitors and manages various building functions.
BMS system is used to control and monitor HVAC (Heating, Ventilation, and Air Conditioning) systems in buildings.
It can also manage lighting, security, fire alarms, and other building systems.
BMS systems use sensors, controllers, and software to collect data and make adjustments t...
A BMS system is a centralized control system that monitors and manages various building systems.
BMS stands for Building Management System.
It integrates and controls various systems like HVAC, lighting, security, and fire safety.
It collects data from sensors and devices to monitor and optimize building performance.
BMS systems can automate processes, schedule maintenance, and provide real-time alerts.
Examples of BMS syst...
LMS stands for Load Management System in BMS which helps in managing the power consumption of the building.
LMS is a software-based system that monitors and controls the power consumption of a building.
It helps in optimizing the energy usage and reducing the energy costs.
LMS can be integrated with other systems in BMS such as HVAC, lighting, and security systems.
It can also provide real-time data on energy consumption a...
I applied via Naukri.com and was interviewed in Apr 2022. There were 2 interview rounds.
What is the responsibility you have to do and how to handle crucial situation.
I applied via Referral and was interviewed in Apr 2022. There were 3 interview rounds.
I applied via Approached by Company
I applied via Referral and was interviewed before Oct 2020. There were 4 interview rounds.
Power factor is the ratio of real power to apparent power in an AC circuit.
It is a measure of how efficiently electrical power is being used.
It ranges from 0 to 1, with 1 being the most efficient.
A low power factor can result in higher energy costs and equipment damage.
Capacitors can be used to improve power factor.
Example: A motor with a power factor of 0.8 requires 1.25 times more current than a motor with a power fa
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There was 1 interview round.
Specific power consumption is the amount of power consumed per unit of output.
It is a measure of energy efficiency.
It is calculated by dividing the power consumed by the output produced.
It is commonly used in industries to optimize energy usage.
Examples include kWh/ton in cement production and kWh/kg in textile manufacturing.
I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Oct 2021. There was 1 interview round.
I applied via Walk-in and was interviewed in Dec 2021. There was 1 interview round.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Technical Supervisor
18
salaries
| ₹1.9 L/yr - ₹3.6 L/yr |
Electrical Supervisor
11
salaries
| ₹1.8 L/yr - ₹2.4 L/yr |
Supervisor
7
salaries
| ₹2 L/yr - ₹4 L/yr |
Electrician
7
salaries
| ₹2.3 L/yr - ₹2.5 L/yr |
HR Executive
6
salaries
| ₹2 L/yr - ₹3.8 L/yr |
Sodexo
ISS Facility Services
Compass Group Support Services
BVG India