Filter interviews by
I applied via Referral and was interviewed in Jun 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Dec 2023. There were 2 interview rounds.
Yes, I have knowledge of store management and ERP systems.
I have experience in managing inventory, organizing stock, and ensuring timely deliveries.
I am familiar with using ERP systems to track inventory levels, monitor sales trends, and generate reports.
I have successfully implemented an ERP system in a previous role to streamline store operations.
Yes, I have extensive knowledge and experience in store operations within a warehouse setting.
Managed inventory levels to ensure adequate stock for production
Implemented efficient storage and organization systems
Utilized inventory management software to track stock levels and orders
Performed regular audits to maintain accuracy of inventory records
Yes, I have experience in the automation field.
I have worked with automated inventory management systems in my previous role.
I have experience in implementing automated processes to streamline operations.
I have knowledge of using automation tools like RFID technology and barcode scanners.
I have successfully integrated automation solutions to improve efficiency and accuracy.
Yes, I have knowledge of Inventory control and SAP.
I have experience in managing inventory levels to ensure optimal stock levels.
I am proficient in using SAP software for inventory management and tracking.
I have conducted regular audits to reconcile physical inventory with system records.
I have implemented inventory control measures to minimize stock losses and improve efficiency.
posted on 19 Mar 2024
I applied via Company Website and was interviewed before Mar 2023. There were 2 interview rounds.
Consists of 10 questions
Consists of 20 questions
posted on 16 Jan 2021
posted on 28 Mar 2024
posted on 28 Mar 2024
SDLC stands for Software Development Life Cycle, which is a process used by software development teams to design, develop, and test high-quality software.
SDLC consists of several phases including planning, analysis, design, implementation, testing, and maintenance.
Each phase has its own set of activities and deliverables to ensure the software meets the requirements and quality standards.
Examples of SDLC models include...
CAN protocol is a communication standard used in automotive and industrial applications.
CAN protocol stands for Controller Area Network
It is a message-based protocol used for communication between electronic control units (ECUs)
CAN protocol allows for high-speed communication and real-time data transmission
It is commonly used in automotive applications for functions such as engine control, transmission control, and bod...
posted on 23 Nov 2015
SDLC is a process followed by software development teams to design, develop and test high-quality software.
SDLC consists of several phases including planning, analysis, design, development, testing, deployment, and maintenance.
Each phase has its own set of deliverables and objectives.
SDLC models include Waterfall, Agile, and DevOps.
SDLC helps ensure that software is developed efficiently, on time, and within budget.
SDL...
Different software development models
Waterfall model
Agile model
Spiral model
V-model
Iterative model
RAD model
Prototype model
Incremental model
Waterfall model is a linear sequential approach to software development.
Advantages: clear and well-defined stages, easy to understand and manage, suitable for small projects with stable requirements
Disadvantages: inflexible, difficult to make changes once a stage is completed, testing is done only at the end, not suitable for large or complex projects
Stages: requirements gathering, design, implementation, testing, depl...
Agile is an iterative approach to software development that emphasizes flexibility and customer satisfaction.
Agile involves breaking down projects into smaller, more manageable chunks called sprints.
It prioritizes collaboration between developers, customers, and stakeholders.
It allows for changes and adjustments to be made throughout the development process.
It promotes continuous delivery and improvement.
Advantages ove...
Questions about my project, E-R diagram, C/C++ projects, and software development model used.
Explained my project and its E-R diagram
Shared my experience with C/C++ projects
Discussed the software development model used
Provided examples to support my answers
posted on 6 May 2019
I applied via Campus Placement and was interviewed before May 2018. There was 0 interview round.
I appeared for an interview before Aug 2016.
Switchgear is a combination of electrical disconnect switches, fuses, or circuit breakers used to control, protect, and isolate electrical equipment.
Switchgear is a general term for a collection of devices used to control, protect, and isolate electrical equipment.
Circuit breakers are a type of switchgear that automatically interrupts the flow of electric current when a fault is detected.
Switchgear can include disconne...
The interface between transformer and switch gears is the electrical connection and communication between the two components.
The transformer and switch gears are connected through electrical cables or busbars.
The switch gears control the flow of electrical power to and from the transformer.
The switch gears may include circuit breakers, relays, and protective devices.
The interface ensures proper coordination and protect...
The value of IBL of Transformer oil is the Insulating Breakdown Level.
IBL is a measure of the dielectric strength of transformer oil.
It indicates the maximum voltage that the oil can withstand before it breaks down and loses its insulating properties.
The IBL value is important for ensuring the safe and reliable operation of transformers.
Regular testing of transformer oil is necessary to monitor the IBL and detect any p...
I am currently earning $80,000 and I am looking for a salary in the range of $90,000 to $100,000.
My current salary is $80,000.
I am expecting a salary in the range of $90,000 to $100,000.
I am open to negotiation based on the overall compensation package.
Yes, I am ready for re-location.
I am open to moving to a new location for the right opportunity.
I have experience working in different cities and adapting to new environments.
I am willing to relocate to further my career and gain new experiences.
I understand the challenges that come with re-location and I am prepared to face them.
I have a flexible mindset and can easily adjust to new surroundings.
Negotiation is typically done before arrival to finalize terms and conditions.
Negotiations are usually conducted before the candidate arrives to ensure all terms are agreed upon in advance.
It is important to have a clear understanding of the offer and terms before accepting the job.
Discussing and finalizing details beforehand can help avoid misunderstandings or conflicts later on.
Assistant Manager
49
salaries
| ₹4.8 L/yr - ₹13.5 L/yr |
Production Engineer
38
salaries
| ₹2.5 L/yr - ₹5.5 L/yr |
Quality Engineer
29
salaries
| ₹2.4 L/yr - ₹5.5 L/yr |
Graduate Engineer Trainee (Get)
27
salaries
| ₹1.5 L/yr - ₹3.7 L/yr |
Design Engineer
26
salaries
| ₹2.4 L/yr - ₹5.5 L/yr |
Bombardier Transportation
Indira Gandhi International Airport
Indian Railway Catering and Tourism
Linfox Logistics