Add office photos
Employer?
Claim Account for FREE

House of Hiranandani

4.4
based on 83 Reviews
Filter interviews by

Allied Digital Services Interview Questions and Answers

Updated 22 May 2024

Q1. How a high rise tower is different from regular building apart from its safety and foundation ?

Ans.

High rise towers differ from regular buildings in terms of structural design, materials used, utilities, and maintenance requirements.

  • Structural design of high rise towers must account for factors like wind loads, seismic activity, and building sway.

  • Materials used in high rise towers are typically stronger and more durable to support the weight and height of the building.

  • Utilities in high rise towers, such as elevators, HVAC systems, and fire protection, are more complex and ...read more

Add your answer

Q2. Why did you use SCB instead of AAC block, What's the strength of SCB ?

Ans.

SCB was chosen over AAC block due to its higher strength and durability.

  • SCB has a compressive strength of around 5-7 MPa, which is higher than AAC block.

  • SCB is more durable and resistant to fire compared to AAC block.

  • SCB is a cost-effective option for construction projects requiring high strength and durability.

Add your answer

Q3. What was the last grade of concrete you used, what was the cement content in that ?

Ans.

I last used M25 grade concrete with a cement content of 300 kg/m3.

  • Last used M25 grade concrete

  • Cement content was 300 kg/m3

Add your answer

Q4. What makes an observation different from a NCR ?, What is the process of NCR ? How to close a NCR ?

Ans.

Observation vs NCR, NCR process, closing NCR

  • Observation is a general comment or feedback, while NCR is a non-conformance report indicating a deviation from standards

  • NCR process involves documenting the issue, investigating root cause, implementing corrective actions, and verifying effectiveness

  • Closing a NCR requires verifying that corrective actions have been implemented and are effective, updating records, and obtaining approval from relevant parties

Add your answer
Discover Allied Digital Services interview dos and don'ts from real experiences

Q5. What do you check after receiving a material ?

Ans.

After receiving a material, I check for quality, quantity, documentation, and compliance with specifications.

  • Check for quality by inspecting for defects or damage

  • Verify quantity matches the order

  • Review documentation such as certificates of analysis or test reports

  • Ensure compliance with specifications and standards

  • Perform visual inspection and measurements

Add your answer

Q6. Reinforcement steel rate?

Add your answer

Q7. Cement plaster coefficient?

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

3.7
 • 6.1k Interview Questions
3.4
 • 775 Interview Questions
4.2
 • 157 Interview Questions
3.9
 • 152 Interview Questions
3.8
 • 143 Interview Questions
3.9
 • 132 Interview Questions
View all
Top House of Hiranandani Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter