Filter interviews by
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
General question
Top trending discussions
posted on 11 May 2018
I applied via Naukri.com and was interviewed before May 2017. There was 1 interview round.
The density of soil in the embankment layer varies depending on the type of soil and compaction methods used.
The density of soil in the embankment layer is typically measured in terms of dry density or wet density.
Dry density refers to the mass of solid soil particles per unit volume of soil, while wet density includes the mass of water as well.
The density of soil in the embankment layer is influenced by factors such a...
posted on 17 Jul 2017
I appeared for an interview before Jul 2016.
posted on 5 Aug 2023
I applied via Approached by Company and was interviewed in Jul 2023. There were 2 interview rounds.
posted on 14 Oct 2023
I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.
Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.
Variations are changes to the original scope, cost, or schedule of a project
Variations must be documented and approved by the relevant parties
The impact of variations on project budget and timeline must be analyzed
Examples of variations include design changes, unforeseen site conditions, and client requests
I appeared for an interview in Apr 2023.
Slump test is a concrete test to measure the consistency and workability of freshly mixed concrete.
It is performed by filling a cone-shaped mold with concrete, then removing the mold and measuring how much the concrete slumps or settles.
The amount of slump indicates the water content and workability of the concrete.
Different types of slumps (true slump, shear slump, collapse slump) can provide insights into the quality...
Soil test Is code 2720
Concrete is a strong and durable building material made from a mixture of cement, sand, gravel, and water.
Made from a mixture of cement, sand, gravel, and water
Used in construction for building foundations, roads, bridges, and more
Can be reinforced with steel bars for added strength
Comes in different forms such as ready-mix concrete and precast concrete
I applied via Approached by Company and was interviewed in Apr 2022. There was 1 interview round.
I applied via LinkedIn and was interviewed in Feb 2022. There were 2 interview rounds.
I am a civil engineer with experience in designing and managing construction projects.
I have a Bachelor's degree in Civil Engineering from XYZ University.
I have worked on various projects including designing bridges, roads, and buildings.
I am skilled in using software such as AutoCAD and Revit for designing.
I have experience in managing construction projects and ensuring they are completed on time and within budget.
I a...
based on 4 reviews
Rating in categories
Civil Site Engineer
29
salaries
| ₹1.5 L/yr - ₹4.8 L/yr |
Quantity Surveyor
17
salaries
| ₹2.2 L/yr - ₹7.5 L/yr |
Planning Engineer
14
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Site Engineer
14
salaries
| ₹1.8 L/yr - ₹4.5 L/yr |
Senior Site Engineer
14
salaries
| ₹3.2 L/yr - ₹5.3 L/yr |
Lea Associates South Asia
McNally Bharat Engineering
R.V.R. PROJECTS
ABCI Infrastructures