The code used for measurements in civil engineering is typically the International System of Units (SI).
International System of Units (SI) is commonly used for measurements in civil engineering.
SI units include meters for length, kilograms for mass, and seconds for time.
Other codes may be used for specific applications, such as US customary units in the United States.
Accuracy and precision in measurements are crucial f
Approximately 500 to 600 bricks are required for 1 cubic meter of brick masonry work.
The number of bricks required can vary based on the size and type of bricks used.
Standard size bricks (190mm x 90mm x 90mm) typically require around 500 bricks per cubic meter.
Larger or smaller bricks will require more or fewer bricks respectively.
It is important to account for wastage and cutting of bricks during construction.
My expected salary is based on my experience, qualifications, and the industry standard for Civil Site Engineers.
My expected salary is in line with industry standards for Civil Site Engineers
I have considered my level of experience and qualifications when determining my expected salary
I am open to negotiation based on the specific responsibilities and benefits offered by the employer
I applied via Company Website and was interviewed in May 2024. There was 1 interview round.
I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.
I applied via Referral and was interviewed before Dec 2021. There were 2 interview rounds.
I applied via Internshala and was interviewed in Oct 2023. There were 2 interview rounds.
WHAT ARE YOUR STRENGTH IN TERMS OF DESIGNIG?
I applied via Referral and was interviewed before Jul 2023. There was 1 interview round.
Different stages in construction include planning, design, pre-construction, construction, and post-construction phases.
Planning stage involves setting project goals, determining budget, and obtaining necessary permits.
Design stage includes creating blueprints, selecting materials, and finalizing plans.
Pre-construction phase involves site preparation, mobilizing resources, and scheduling.
Construction stage is where act...
I applied via Naukri.com
Product costing for new parts
Determine the cost of raw materials and labor required for production
Include overhead costs such as rent, utilities, and equipment maintenance
Consider any additional costs such as shipping or packaging
Compare the cost to market prices to ensure profitability
Regularly review and adjust costing as needed
Zero based costing is a method of cost accounting that involves starting from scratch and justifying every expense.
Zero-based costing requires a thorough analysis of all costs associated with a new part
It involves starting from a zero base and justifying every expense
This method is useful for identifying unnecessary costs and improving efficiency
Example: A company wants to introduce a new product line and uses zero-bas...
I applied via LinkedIn and was interviewed in Oct 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in Sep 2023. There were 3 interview rounds.
About your positive attitude
based on 4 interviews
Interview experience
based on 33 reviews
Rating in categories
Site Engineer
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Architect
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Architect
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Architect
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Civil Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Morphogenesis
Mindspace Architects
Design Forum International
Studio Lotus