Upload Button Icon Add office photos

Filter interviews by

Hindusthan Urban Infrastructure Interview Questions and Answers

Updated 9 Jul 2024

Hindusthan Urban Infrastructure Interview Experiences

1 interview found

DGM Interview Questions & Answers

user image Anonymous

posted on 9 Jul 2024

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jul 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. What are blocked ITC
  • Ans. 

    Blocked Input Tax Credit (ITC) refers to the situation where a taxpayer is unable to claim credit for the taxes paid on inputs due to certain restrictions or non-compliance.

    • Blocked ITC can occur when the supplier has not paid the tax collected to the government.

    • ITC on certain goods or services like motor vehicles, food and beverages, etc., may be blocked under GST regulations.

    • Non-compliance with GST rules or incorrect ...

  • Answered by AI
  • Q2. If HO is in another state and branch is local, whether IGST or local GST will be charged
  • Ans. 

    IGST will be charged if the supply is between two different states, otherwise local GST will be charged.

    • IGST will be charged if the supply is inter-state (between two different states)

    • Local GST will be charged if the supply is intra-state (within the same state)

    • The place of supply rules under GST determine whether IGST or local GST is applicable

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. Can you handle consolidation
  • Ans. 

    Yes, I have experience in handling consolidation in previous roles.

    • I have successfully managed the consolidation of financial statements for multiple entities in my current role.

    • I am familiar with the process of consolidating data from various departments to create comprehensive reports.

    • I have experience in streamlining consolidation processes to improve efficiency and accuracy.

    • I have worked with cross-functional teams...

  • Answered by AI
  • Q2. What are your next 5 year plans

Interview Preparation Tips

Interview preparation tips for other job seekers - Be clear about everything. If you don't know reply of any question then clearly say...I am sorry. I am not aware about it but I would learn it once I will work on this. I am a great learner.

DGM Interview Questions asked at other Companies

Q1. How on can take care of Real world usage during product development?
View answer (1)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. About your current job profile
  • Q2. Types of tender portal worked upon
Round 2 - HR 

(2 Questions)

  • Q1. About current company ctc and notice period
  • Q2. Expect ctc

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical knowledge of product shall be beneficial to Crack interview.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. 1)Wire droing 2)copper scale 3)dai testing 4) wire brackage problems 5)air presher 6)job chang 1.420.to 1.80mm
  • Q2. My first plant meta copper & alloy Ltd goa.i was working in dap line degrising aneling & pickling ato line 100 mitter zig zag acomlatter.& That is copper plant 2004 to 2012 I was working

Interview Preparation Tips

Interview preparation tips for other job seekers - My shuteble jobs mins I like and injoying job
All employee shud be heppy they I was working is my challenge I wish to good this trip off job offering me...
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at Prestige Institute of Management and Research, Indore and was interviewed in Jul 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

The first company conducted an aptitude test where logical thinking was required, and one needs to have the ability to think critically in order to be selected.

Round 2 - One-on-one 

(5 Questions)

  • Q1. Can you tell me about yourself?
  • Q2. Tell me some marketing strategies?
  • Q3. Who was our influencer or target audiences?
  • Q4. What strategies do you use to generate leads?
  • Q5. Any questions?
Round 3 - HR 

(4 Questions)

  • Q1. Can you tell me about yourself?
  • Q2. Can you provide details about your background?
  • Q3. What is your expected duration of employment with our company?
  • Q4. Are you willing to relocate anywhere in India?

Interview Preparation Tips

Interview preparation tips for other job seekers - First, create a well-structured plan for what and how you will speak. Then, while speaking, try not to get nervous and always maintain good verbal and non-verbal communication. Don't forget your etiquette; arrive at the interview well-groomed and dressed in appropriate formal attire, including a blazer. Keep your communication skills sharp, as this is crucial. Avoid avoiding eye contact with the HR representative and refrain from telling any lies. Always engage with empathy and emotion, as this tends to attract positive attention. Provide concise answers, because the more you meander, the more confused you may become.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at Bannari Amman Institute of Technology, Sathyamangalam and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. Tell me about yourself
  • Q2. 2 or 3 questions related to subjects like strength of materials and thermodynamics
  • Q3. Family Background

Interview Preparation Tips

Topics to prepare for Swelect Energy Systems Graduate Trainee interview:
  • Maintenance
  • Production
  • Quality Control
  • Purchase Management
Interview preparation tips for other job seekers - They asked from the resume mostly, so Know about the things what you put in the resume before the interview.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - HR 

(2 Questions)

  • Q1. Work experience?
  • Q2. Educational and work details details?
Round 2 - Technical 

(2 Questions)

  • Q1. Civil engineering related questions
  • Q2. Assignment for costing and Estimation
  • Ans. 

    Costing and estimation assignment for Senior Engineer position

    • Understand the scope of the project and gather all relevant information

    • Break down the project into smaller tasks and estimate the time and cost for each task

    • Consider factors such as materials, labor, equipment, and overhead costs

    • Use historical data or industry benchmarks to validate your estimates

    • Provide a detailed cost breakdown and justification for your e

  • Answered by AI
Round 3 - Aptitude Test 

Computer software skills

Round 4 - Assignment 

Estimation & costing related work

Round 5 - HR 

(2 Questions)

  • Q1. Documents check
  • Q2. Salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Need a proper knowledge about your profile and proper documentation for further process
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in May 2024. There were 3 interview rounds.

Round 1 - HR 

(3 Questions)

  • Q1. Are you working in transformer industry.
  • Q2. Have you done engineering.
  • Ans. 

    Yes, I have a degree in engineering.

    • I have a Bachelor's degree in Mechanical Engineering from XYZ University.

    • I have worked as a project engineer for ABC Company for 3 years.

    • I have experience in designing and implementing engineering solutions.

    • I am familiar with CAD software and have completed several engineering projects successfully.

  • Answered by AI
  • Q3. Are you ready to change your job from current organisation
Round 2 - Technical 

(4 Questions)

  • Q1. What is transformer
  • Ans. 

    A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.

    • Transformers are commonly used to step up or step down voltage in electrical power distribution systems.

    • They consist of two coils of wire, known as the primary and secondary coils, wrapped around a core made of ferromagnetic material.

    • The primary coil is connected to the input voltage sou...

  • Answered by AI
  • Q2. Working principle of transformer
  • Ans. 

    A transformer is a device that transfers electrical energy between two or more circuits through electromagnetic induction.

    • Transformers work on the principle of electromagnetic induction

    • They have two coils - primary and secondary, which are magnetically coupled

    • The primary coil is connected to a source of alternating current, creating a changing magnetic field

    • This changing magnetic field induces a voltage in the secondar...

  • Answered by AI
  • Q3. Type of transformer winding
  • Ans. 

    Transformer windings can be classified as concentric or sandwich windings.

    • Concentric windings have all the windings placed on the same limb of the core.

    • Sandwich windings have windings placed on different limbs of the core.

    • Concentric windings are easier to manufacture and have better cooling.

    • Sandwich windings are more compact and have better short-circuit strength.

    • Examples: Concentric winding - distribution transformers

  • Answered by AI
  • Q4. What is the most important points during winding
  • Ans. 

    The most important points during winding include tension control, proper alignment, and consistent winding patterns.

    • Maintaining proper tension control to prevent breakage or stretching of the material

    • Ensuring proper alignment of the material on the winding equipment to avoid uneven winding

    • Following consistent winding patterns to create uniform and neat rolls of material

  • Answered by AI
Round 3 - HR 

(3 Questions)

  • Q1. Have you ready to join at BBL
  • Q2. Have you got your all required documents
  • Ans. 

    Yes, I have all the required documents for the position of Assistant Manager.

    • I have my resume, cover letter, references, and any certifications or licenses needed for the role.

    • I also have my identification documents such as driver's license or passport.

    • I am prepared to provide any additional documents requested during the interview process.

  • Answered by AI
  • Q3. How you feel to join at BBL

Interview Preparation Tips

Topics to prepare for Bharat Bijlee Assistant Manager interview:
  • Transformers
Interview preparation tips for other job seekers - Joining in the BBL it's very good opportunity to the engineer for future development
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Not Selected

I applied via Approached by Company and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. How are you managing conflicts in the team?
  • Q2. What is the trend of customer complaints?
  • Ans. 

    Customer complaints are decreasing due to improved quality control measures and enhanced customer service.

    • Customer complaints have been decreasing steadily over the past year.

    • Implementation of quality control measures has resulted in fewer defects and issues with products.

    • Enhanced customer service initiatives have led to quicker resolution of customer concerns.

    • Regular feedback surveys have helped identify areas for imp...

  • Answered by AI
  • Q3. How many numbers of customer complaints received / month
  • Ans. 

    The number of customer complaints received per month varies depending on the company's size, industry, and customer base.

    • The number of customer complaints can range from a few to hundreds or even thousands per month.

    • It is important to track and analyze customer complaints to identify trends and areas for improvement.

    • Examples of customer complaints include product defects, poor customer service, billing errors, and deli

  • Answered by AI
  • Q4. What is the rejection percentage in process & describe one project what you have done to contain the defect
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Not Selected

I applied via Referral and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Process and understanding, Development of New facility
  • Q2. Man power Handling - Contracts
  • Q3. Understanding of IS and root cause of failure
  • Ans. 

    Understanding IS and root cause of failure is crucial for preventing future issues in production.

    • IS stands for Information Systems, which are used to collect, store, process, and distribute information within an organization.

    • Root cause analysis is a method used to identify the underlying cause of a problem or failure.

    • Having a strong understanding of IS can help identify potential failures in the production process and ...

  • Answered by AI
  • Q4. Inspections handling

Interview Preparation Tips

Topics to prepare for Voltamp Transformers Production Manager interview:
  • Basic Process knowledge
Interview preparation tips for other job seekers - Salary expectation at higher end would be a major reason to not get selected
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2024. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Introducing yourself
  • Q2. Why you need this job
Round 2 - Aptitude Test 

Basic Mechanical Engineering

Round 3 - Technical 

(2 Questions)

  • Q1. CAD Knowledge basic
  • Q2. Basic Measurement’s

Hindusthan Urban Infrastructure Interview FAQs

How many rounds are there in Hindusthan Urban Infrastructure interview?
Hindusthan Urban Infrastructure interview process usually has 2 rounds. The most common rounds in the Hindusthan Urban Infrastructure interview process are One-on-one Round.
What are the top questions asked in Hindusthan Urban Infrastructure interview?

Some of the top questions asked at the Hindusthan Urban Infrastructure interview -

  1. If HO is in another state and branch is local, whether IGST or local GST will b...read more
  2. Can you handle consolidat...read more
  3. What are blocked ...read more

Tell us how to improve this page.

Hindusthan Urban Infrastructure Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

KEI Industries Interview Questions
4.2
 • 53 Interviews
RR kabel Interview Questions
4.1
 • 43 Interviews
Finolex Cables Interview Questions
3.8
 • 40 Interviews
Landis+Gyr Interview Questions
3.6
 • 29 Interviews
View all

Hindusthan Urban Infrastructure Reviews and Ratings

based on 13 reviews

2.6/5

Rating in categories

3.7

Skill development

3.2

Work-life balance

3.4

Salary

2.4

Job security

2.5

Company culture

2.7

Promotions

3.1

Work satisfaction

Explore 13 Reviews and Ratings
Assistant Manager
5 salaries
unlock blur

₹5.2 L/yr - ₹9 L/yr

Manager
4 salaries
unlock blur

₹6.5 L/yr - ₹14 L/yr

Senior Engineer
4 salaries
unlock blur

₹5.8 L/yr - ₹8 L/yr

HR Manager
4 salaries
unlock blur

₹12 L/yr - ₹15.5 L/yr

Assistant Engineer
4 salaries
unlock blur

₹2.1 L/yr - ₹4.1 L/yr

Explore more salaries
Compare Hindusthan Urban Infrastructure with

CG Power and Industrial Solutions

3.9
Compare

KEI Industries

4.2
Compare

Finolex Cables

3.8
Compare

RR kabel

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview