Filter interviews by
Be the first one to contribute and help others!
posted on 19 Dec 2024
I applied via Campus Placement and was interviewed in Nov 2024. There were 3 interview rounds.
The hardest round I have experienced during interviews was ultimately successful, as I was selected. Only a few questions were multiple-choice; the rest required one-word or numerical answers to be written manually. Pay special attention to the last portion, as it was a scoring section containing standard technical questions. However, as we begin the assessment, the majority of the time is consumed by reasoning, arithmetic, and similar topics. In summary, I can say that the initial part is the toughest.
posted on 16 Jan 2025
I applied via Company Website and was interviewed in Dec 2024. There were 2 interview rounds.
posted on 22 Nov 2024
I applied via Recruitment Consulltant and was interviewed in Oct 2024. There were 3 interview rounds.
posted on 24 Nov 2024
I applied via Newspaper Ad and was interviewed in Oct 2024. There were 3 interview rounds.
I have believed on my skills to face challenge and good communication skills,hostest to my work soo grant me one chance for pove mt self
Good communication skills
My two strongest points are problem-solving skills and attention to detail. My weaknesses include public speaking and time management.
Strong problem-solving skills - able to analyze complex issues and come up with effective solutions
Attention to detail - meticulous in ensuring accuracy and precision in work
Weakness in public speaking - struggle with speaking confidently in front of large audiences
Weakness in time manag...
I applied via campus placement at Indian Institute of Technology (IIT), Guwahati and was interviewed in Nov 2024. There were 2 interview rounds.
Key considerations in HVAC system design include load calculation, equipment selection, ductwork design, and energy efficiency.
Performing accurate load calculations to determine heating and cooling requirements
Selecting appropriate HVAC equipment based on the load calculations and building requirements
Designing efficient ductwork layout to ensure proper air distribution
Considering energy efficiency measures such as hig...
posted on 1 Nov 2024
Progress reporting methodology involves tracking and communicating project status to stakeholders.
Regularly update project status using tools like Gantt charts or dashboards
Communicate progress through status meetings or reports
Include key metrics like milestones achieved, budget spent, and risks identified
Ensure transparency and accuracy in reporting to build trust with stakeholders
Handled project values ranging from $100k to $10M
Managed projects with budgets ranging from $100k to $10M
Experience in handling projects of various sizes and complexities
Successfully delivered projects within budget constraints
Utilized cost management techniques to optimize project value
Microsoft Project, Primavera P6, Trello, Asana
Microsoft Project is widely used for project planning and scheduling
Primavera P6 is popular for large and complex projects
Trello and Asana are commonly used for agile project management and collaboration
I applied via Naukri.com and was interviewed in Jul 2024. There were 2 interview rounds.
The weight of plates can be calculated by multiplying the density of the material by the volume of the plate.
Determine the density of the material the plate is made of (e.g. steel has a density of 7850 kg/m^3)
Measure the dimensions of the plate (length, width, thickness)
Calculate the volume of the plate using the formula: volume = length x width x thickness
Multiply the volume by the density to get the weight of the pla
There are various types of mechanical tools used in construction and maintenance work.
Hand tools (e.g. hammer, screwdriver, wrench)
Power tools (e.g. drill, saw, grinder)
Heavy equipment (e.g. excavator, bulldozer, crane)
Measuring tools (e.g. tape measure, level, calipers)
There are mainly three types of beams: Simply supported beam, Cantilever beam, and Overhanging beam.
Simply supported beam is supported at both ends and carries load in the middle.
Cantilever beam is supported at one end and carries load at the other end.
Overhanging beam has one or both ends extending beyond its supports.
There are several types of flanges used in piping systems for connecting pipes, valves, and other equipment.
Weld Neck Flange
Slip On Flange
Socket Weld Flange
Threaded Flange
Blind Flange
Lap Joint Flange
Orifice Flange
posted on 27 Aug 2024
I applied via Naukri.com and was interviewed in Jul 2024. There were 4 interview rounds.
Asking backhual questions purpose and also my education subjects
Asking backhual questions purpose and also my education subjects
posted on 17 Aug 2024
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
based on 14 reviews
Rating in categories
Graduate Apprentice Trainee
4
salaries
| ₹0.5 L/yr - ₹1.1 L/yr |
Quality Inspector
4
salaries
| ₹1 L/yr - ₹3.3 L/yr |
Technical Executive
3
salaries
| ₹2.1 L/yr - ₹3.6 L/yr |
Production Quality Manager
3
salaries
| ₹6 L/yr - ₹9 L/yr |
Cummins
John Deere
Thermax Limited
Caterpillar Inc