Filter interviews by
The extra working space for 10m depth earth excavation depends on various factors such as soil type, equipment used, and safety requirements.
The extra working space is typically calculated based on the stability of the excavation walls.
For cohesive soils, the general rule of thumb is to provide a minimum of 1.5 times the depth of the excavation as working space.
For non-cohesive soils, the working space required may be ...
Precautions for deep excavation include shoring, sloping, benching, and proper soil analysis.
Ensure proper shoring is in place to prevent collapse
Slope the excavation walls to prevent soil movement
Bench the excavation to provide stability
Conduct soil analysis to determine the appropriate precautions
Provide adequate lighting and ventilation
Ensure proper training and supervision of workers
Have an emergency response plan
Analysis and material calculations for brick work and plaster design mix.
Analyze the dimensions and requirements of the brick work and plaster design
Calculate the required amount of materials for the design mix
Consider factors such as strength, durability, and cost when selecting materials
Ensure compliance with building codes and regulations
Collaborate with architects, engineers, and contractors to ensure successful pr
The cutting length of columns ties is determined as per the IS code.
The cutting length of column ties is calculated based on the diameter of the column and the number of longitudinal bars.
As per the IS code, the cutting length is equal to 2 times the development length plus the lap length.
The development length is calculated based on the grade of concrete and the diameter of the bar.
The lap length is determined based o...
Minimum deduction in shuttering for main and secondary beams
The minimum deduction in shuttering for main and secondary beams depends on the type of material used for shuttering
For wooden shuttering, the minimum deduction should be around 20 mm
For steel shuttering, the minimum deduction should be around 10 mm
The deduction should be calculated based on the thickness of the shuttering material and the size of the beam
The ...
Aggregates should be strong, durable, and free from impurities. Tests should include grading, shape, and texture.
Aggregates should have high compressive strength and low water absorption.
They should be free from organic impurities and have a low percentage of fine particles.
Tests should include grading, shape, texture, and soundness.
Examples of tests include the Los Angeles Abrasion Test and the Aggregate Impact Value
Rolling margins of steel as per IS code
IS code refers to the Indian Standard code for steel
Rolling margins are the allowable variations in dimensions during the rolling process
These margins ensure the quality and consistency of the rolled steel
The specific rolling margins for different types of steel are defined in the IS code
Examples of rolling margins include thickness tolerance, width tolerance, etc.
Planning and management of construction site involves various tasks such as scheduling, budgeting, resource allocation, and risk management.
Develop a detailed project plan and schedule
Allocate resources effectively to ensure timely completion of the project
Monitor progress regularly and make necessary adjustments to the plan
Manage the budget and ensure that costs are kept under control
Identify and mitigate potential ri...
I applied via Internshala and was interviewed in Nov 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Dec 2024. There was 1 interview round.
Data entry is the process of entering, updating, or verifying data in a computer system.
Entering data accurately and efficiently
Updating existing data with new information
Verifying data for accuracy and completeness
I have over 3 years of experience in data entry, including entering, verifying, and updating data in various databases.
Proficient in using Microsoft Excel and other data entry software
Accurate and efficient in typing and data entry tasks
Experience in maintaining confidentiality and data integrity
Handled large volumes of data entry tasks with tight deadlines
C is a procedural programming language while C++ is an object-oriented programming language.
C is a procedural programming language, focusing on functions and procedures.
C++ is an object-oriented programming language, allowing for classes, objects, and inheritance.
C does not support classes and objects, while C++ does.
C++ has features like polymorphism, encapsulation, and inheritance which are not present in C.
C++ is an...
I am proficient in using MS Word for data entry tasks.
I am skilled in formatting text, tables, and images in MS Word.
I can create and edit documents, including reports, letters, and spreadsheets.
I am familiar with using templates and styles to maintain consistency in documents.
I am experienced in using features like spell check, track changes, and mail merge.
I am efficient in using keyboard shortcuts to speed up data e
I applied via Referral and was interviewed in Oct 2024. There were 3 interview rounds.
4 easy level questions will be asked basically from arrays and strings.
Assignment will be given after clearing coding round. In my case ELearning Platform project was given and 7 days time was given to complete.
Quantitative reasoning
I applied via Referral and was interviewed in Oct 2024. There was 1 interview round.
I have worked on projects involving website redesign, mobile app design, and user research.
Redesigned company website to improve user experience and increase conversion rates
Designed mobile app interface for seamless navigation and intuitive user interactions
Conducted user research to gather feedback and make data-driven design decisions
My favorite apps are Instagram for its user-friendly interface and engaging content, Spotify for its personalized music recommendations, and Google Maps for its accurate navigation features.
Instagram - user-friendly interface, engaging content
Spotify - personalized music recommendations
Google Maps - accurate navigation features
In 5 years, I see myself as a seasoned UI/UX designer leading a team of designers, working on innovative projects, and continuously learning and growing in the field.
Leading a team of designers
Working on innovative projects
Continuously learning and growing in the field
posted on 27 Sep 2024
I applied via Walk-in and was interviewed in Aug 2024. There were 3 interview rounds.
Basically It is a list of 25 questions having mix of Resoning,Aptitude &English. Each Queztion carries 2 marks and also there was a plus point that it doesn't have any negative marks
posted on 10 Jan 2025
posted on 23 Dec 2024
I applied via LinkedIn and was interviewed in Nov 2024. There were 2 interview rounds.
Apt questions and some Java related questions
based on 22 reviews
Rating in categories
Billing Engineer
7
salaries
| ₹4.3 L/yr - ₹9.5 L/yr |
Civil Site Engineer
5
salaries
| ₹2.6 L/yr - ₹4.2 L/yr |
Project Manager
4
salaries
| ₹10.8 L/yr - ₹15 L/yr |
Project Engineer
4
salaries
| ₹4.8 L/yr - ₹7 L/yr |
Site Engineer
4
salaries
| ₹3 L/yr - ₹6 L/yr |
Larsen & Toubro Limited
TCS
BHEL
Thermax Limited