Bar bending schedule for manhole and trench concrete volume finding
Slump test is used to measure the workability of concrete at a constant temperature on site. M25 concrete is a mix design with a compressive strength of 25 MPa.
Slump test measures the consistency and workability of concrete by determining the slump of a sample.
Constant temperature on site ensures accurate results in the slump test.
M25 concrete is a mix design with a compressive strength of 25 MPa, commonly used in cons...
Final setting time of concrete is the time taken for the concrete to completely set and harden.
Final setting time is the time at which the concrete has hardened sufficiently to bear some load without damage.
It is typically around 6-10 hours after the concrete has been mixed and placed.
Factors affecting final setting time include temperature, humidity, and the type of cement used.
The formula for calculating the weight of steel is based on the density of steel and the volume of the steel object.
The formula for calculating the weight of steel is: Weight = Volume x Density
The density of steel is typically around 7850 kg/m^3
Volume can be calculated based on the dimensions of the steel object (e.g. length x width x height)
Make sure to use consistent units for volume and density in the formula
PPE stands for Personal Protective Equipment and HSE stands for Health, Safety, and Environment.
PPE includes items like hard hats, safety glasses, gloves, and high visibility clothing to protect workers from hazards.
HSE focuses on ensuring the health, safety, and environmental protection of workers and the community.
Both PPE and HSE are crucial in maintaining a safe work environment on construction sites.
Top trending discussions
posted on 25 Mar 2023
I applied via Newspaper Ad and was interviewed in Feb 2023. There were 2 interview rounds.
I applied via Company Website and was interviewed in Jan 2023. There were 3 interview rounds.
Assalamu alaikum
My name is intezar Ali
My position civil foreman
My work experience 14 years
7 years in Saudi Arab
7 years in Qatar
My work utilities and road work interloc
Corb stone and installed foundation
posted on 13 Nov 2023
I applied via Recruitment Consulltant and was interviewed before Nov 2022. There were 2 interview rounds.
I love construction line but one thing please provide some extra pay
Installation, testing, and commissioning are key processes in the field of piping foreman.
Installation involves setting up the piping system according to design specifications.
Testing is done to ensure the integrity and functionality of the installed pipes.
Commissioning involves the final inspection and verification of the piping system before it is put into operation.
Examples of installation tasks include cutting and ...
based on 1 review
Rating in categories
Tekla Modeller
10
salaries
| ₹3 L/yr - ₹6 L/yr |
Design Engineer
6
salaries
| ₹4.1 L/yr - ₹10.6 L/yr |
Detailing Engineer
6
salaries
| ₹3.6 L/yr - ₹7.2 L/yr |
Structural Detailer
4
salaries
| ₹2.4 L/yr - ₹5 L/yr |
Detailer
4
salaries
| ₹3.1 L/yr - ₹7.5 L/yr |
Tata Steel
JSW Steel
Steel Authority Of India
Vedanta Limited