Filter interviews by
Be the first one to contribute and help others!
I applied via Recruitment Consulltant and was interviewed before Aug 2021. There were 2 interview rounds.
I would increase sales by identifying new potential customers and building strong relationships with them.
Conduct market research to identify potential customers
Develop targeted marketing campaigns to reach new customers
Offer promotions or discounts to incentivize new customers to try our products
Provide excellent customer service to build loyalty and encourage repeat business
Collaborate with other departments to ensur...
I applied via Internshala and was interviewed in Oct 2023. There were 2 interview rounds.
WHAT ARE YOUR STRENGTH IN TERMS OF DESIGNIG?
I applied via Referral and was interviewed before Jul 2023. There was 1 interview round.
Different stages in construction include planning, design, pre-construction, construction, and post-construction phases.
Planning stage involves setting project goals, determining budget, and obtaining necessary permits.
Design stage includes creating blueprints, selecting materials, and finalizing plans.
Pre-construction phase involves site preparation, mobilizing resources, and scheduling.
Construction stage is where act...
posted on 25 Dec 2021
I applied via Recruitment Consultant and was interviewed in Nov 2021. There was 1 interview round.
To achieve the desired target, it is important to set clear goals, create a strategic plan, motivate and empower the team, monitor progress, and make necessary adjustments.
Set clear and specific goals that are aligned with the overall objectives
Create a strategic plan outlining the steps and resources required
Motivate and empower the team by providing support, training, and recognition
Monitor progress regularly through...
I applied via Referral and was interviewed before Dec 2021. There were 2 interview rounds.
I applied via Naukri.com
Product costing for new parts
Determine the cost of raw materials and labor required for production
Include overhead costs such as rent, utilities, and equipment maintenance
Consider any additional costs such as shipping or packaging
Compare the cost to market prices to ensure profitability
Regularly review and adjust costing as needed
Zero based costing is a method of cost accounting that involves starting from scratch and justifying every expense.
Zero-based costing requires a thorough analysis of all costs associated with a new part
It involves starting from a zero base and justifying every expense
This method is useful for identifying unnecessary costs and improving efficiency
Example: A company wants to introduce a new product line and uses zero-bas...
I applied via LinkedIn and was interviewed in Oct 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in Sep 2023. There were 3 interview rounds.
About your positive attitude
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before May 2021. There were 2 interview rounds.
Tests done on reinforcement include tensile strength, bending test, elongation test, and rebend test.
Tensile strength test measures the maximum stress a reinforcement bar can withstand before breaking.
Bending test checks the ability of reinforcement to bend without breaking.
Elongation test measures the ability of reinforcement to stretch without breaking.
Rebend test checks the ability of reinforcement to bend and then ...
Anchor bolts in pedestal or foundation can be fixed by drilling holes, inserting bolts, and tightening nuts.
Drill holes in the pedestal or foundation where the anchor bolts will be placed.
Insert the anchor bolts into the holes and make sure they are level.
Pour concrete around the anchor bolts to secure them in place.
Tighten the nuts on the anchor bolts to secure the pedestal or foundation.
Use a torque wrench to ensure ...
Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.
Water cement ratio is a crucial factor in determining the strength and durability of concrete.
A lower water cement ratio results in stronger and more durable concrete.
The ideal water cement ratio varies depending on the type of concrete being used and the specific application.
For example, a water cement ratio of 0.45 i...
To make a schedule, identify tasks, estimate time, prioritize, allocate resources, and track progress.
Identify all tasks that need to be completed
Estimate the time required for each task
Prioritize tasks based on importance and urgency
Allocate resources such as personnel and equipment
Create a timeline or calendar to schedule tasks
Track progress and adjust schedule as needed
Curing is a process of maintaining moisture in concrete to ensure proper hydration and strength development.
Curing helps to prevent cracking and shrinkage in concrete.
It also improves the durability and resistance to abrasion and weathering.
Proper curing can increase the compressive strength of concrete by up to 50%.
Curing methods include water curing, membrane curing, and curing compounds.
Curing should start as soon a...
based on 12 reviews
Rating in categories
Project Engineer
6
salaries
| ₹2.2 L/yr - ₹4.3 L/yr |
Electrical Site Engineer
5
salaries
| ₹2 L/yr - ₹3.5 L/yr |
Senior Project Engineer
4
salaries
| ₹4 L/yr - ₹6 L/yr |
Manager Materials
4
salaries
| ₹5.3 L/yr - ₹8.5 L/yr |
EHS Officer
4
salaries
| ₹3.3 L/yr - ₹4.5 L/yr |
Aludecor Lamination
Ozone Overseas
Architect Hafeez Contractor
Eglo India