Filter interviews by
I applied via Walk-in and was interviewed before Oct 2021. There were 2 interview rounds.
posted on 27 Mar 2022
I applied via Company Website and was interviewed in Feb 2022. There was 1 interview round.
I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in May 2019. There were 3 interview rounds.
Standards for plant layout in refineries ensure safety, efficiency, and compliance with regulations.
Plant layout should prioritize safety and minimize the risk of accidents.
Efficiency is also important, with consideration given to the flow of materials and equipment.
Regulations and industry standards must be followed, such as those set by OSHA and API.
Examples of layout considerations include spacing between equipment,...
The frequency of visiting vendor shops for expediting depends on various factors such as project timelines, vendor reliability, and urgency of the situation.
The frequency of visiting vendor shops for expediting can vary from daily visits to weekly or monthly visits.
It depends on the project timelines and the urgency of the situation. If a project is running behind schedule, more frequent visits may be required to ensur...
DCU stands for Dublin City University, a university located in Dublin, Ireland.
DCU was established in 1980 and has over 17,000 students.
It offers a wide range of undergraduate and postgraduate courses in various fields such as business, engineering, science, arts, and humanities.
DCU is known for its innovative approach to education and research, and has partnerships with many leading companies and institutions.
Some not...
Delayed is called so because it refers to something that is postponed or occurs after the expected time.
The term 'delayed' is used to describe situations where there is a time lag or postponement.
It implies that something is not happening immediately or as scheduled.
Delays can occur due to various reasons such as technical issues, logistical problems, or unforeseen circumstances.
For example, a delayed flight refers to ...
I applied via Walk-in and was interviewed in Aug 2020. There were 3 interview rounds.
A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.
Transformers are used to increase or decrease the voltage levels in electrical power transmission and distribution systems.
They consist of two or more coils of wire, known as windings, which are wound around a core made of magnetic material.
The primary winding is connected to the input v...
Current in a motor can be found using an ammeter.
Connect the ammeter in series with the motor
Turn on the motor and measure the current
Current can be found using the formula I = V/R
Use a clamp meter to measure current without breaking the circuit
I applied via Recruitment Consultant
posted on 29 Dec 2023
I applied via Walk-in and was interviewed in Nov 2023. There was 1 interview round.
I was interviewed before Feb 2024.
Equipment checklist is a list of all machinery and tools that need to be inspected and maintained regularly.
Regularly inspect all equipment for signs of wear and tear
Check for proper functioning of all components
Ensure all safety features are in place and working correctly
Keep a record of maintenance activities and schedule future inspections
Train staff on how to properly use and maintain equipment
I like to work again new place and learn some good technical thinks
I applied via Other and was interviewed in May 2021. There were 3 interview rounds.
posted on 18 Nov 2023
I applied via Campus Placement and was interviewed before Nov 2022. There were 4 interview rounds.
Mathematical and technical questions (based on your stream)
QA QC Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Land Surveyor
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Construction Management
5
salaries
| ₹0 L/yr - ₹0 L/yr |
HSE Officer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group